ML13302C117

From kanterella
Jump to navigation Jump to search
Notice of Public Webinar Meeting - Palisades Nuclear Plant Independent Spent Fuel Storage Installation (ISFSI) Basics Webinar
ML13302C117
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/29/2013
From: Jamie Benjamin, Lennartz J
Reactor Projects Region 3 Branch 4
To:
Entergy Nuclear Palisades
References
Download: ML13302C117 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 October 29, 2013 NOTICE OF PUBLIC WEBINAR MEETING Name of Licensee:

Entergy Nuclear Palisades, LLC - Michigan Name of Facility:

Palisades Nuclear Plant Docket No:

50-255 Date and Time of Meeting: Thursday, November 14, 2013; 4:30 - 5:30 pm (CDT);

5:30 - 6:30 (EDT)

Location of Meeting:

2443 Warrenville Road Lisle, IL 60532 Purpose of Meeting:

The U.S. Nuclear Regulatory Commission (NRC) will discuss Independent Spent Fuel Storage Installation (ISFSI) Basics.

Meeting Category:

This is a Category 3 meeting. The NRC staff will hold a two part meeting. The first part of the meeting will be a Webinar presentation by the NRC for members of the public. The second part of the meeting will provide members of the public with an opportunity to submit questions in writing on the topic of ISFSI, how it relates to nuclear plants or the NRCs regulatory process in this area. If you want to submit questions, they must be submitted in writing through the webinar system.

Interested members of the public can participate in this meeting via a Webinar. After registering, you will receive a confirmation email containing information about joining the Webinar. This is a virtual meeting where you will be able to see the presentation on your computer and hear the presenters through your computers speaker system.

If a computer or speaker system will not be available, you will have the option to join a unique listen-only line. People must still register to obtain the unique phone number.

Webinar seats must be reserved before November 12, 2013, in order to participate, at:

https://www1.gotomeeting.com/register/912809256 Meeting

Contact:

Jay Lennartz 630-829-9806 Jay.Lennartz@nrc.gov

Notice of Significant Licensee Meeting The following are the system requirements for the Webinar:

System Requirements PC-based attendees Required: Windows 7, Vista, XP or 2003 Server Mac-based attendees Required: Mac OS X 10.6 or newer Mobile attendees Required: iPhone, iPad, Android' phone or Android tablet For details please call Jay Lennartz at 630-829-9806; or email at Jay.Lennartz@nrc.gov by November 12, 2013.

NRC PARTICIPANTS:

J. Giessner, Region III, Acting Deputy Division Director, Division of Reactor Safety J. Benjamin, Region III, Acting Branch Chief, Branch 4, Division of Reactor Projects R. Orlikowski, Region III, Branch Chief, Materials Control and Decommissioning Branch, Division of Nuclear Materials Safety R. Edwards, Region III, Reactor Inspector (Decommissioning), Division of Nuclear Materials Safety J. Lennartz, Region III, Project Engineer, Branch 4, Division of Reactor Projects S. Shah, Region III, Reactor Engineer, Branch 4, Division of Reactor Projects Others as designated Other Attendees:

None Note: The Nuclear Regulatory Commission provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice, or the transcript of other information from the meeting in another format (e.g., Braille, large print), please notify the NRC meeting contact no later than 2 business days prior to the meeting.

Approved by: /RA/_______________________

Jamie Benjamin, Acting Chief Branch 4 Division of Reactor Projects

Notice of Significant Licensee Meeting The following are the system requirements for the Webinar:

System Requirements PC-based attendees Required: Windows 7, Vista, XP or 2003 Server Mac-based attendees Required: Mac OS X 10.6 or newer Mobile attendees Required: iPhone, iPad, Android' phone or Android tablet For details please call Jay Lennartz at 630-829-9806; or email at Jay.Lennartz@nrc.gov by November 12, 2013.

NRC PARTICIPANTS:

J. Giessner, Region III, Acting Deputy Division Director, Division of Reactor Safety J. Benjamin, Region III, Acting Branch Chief, Branch 4, Division of Reactor Projects R. Orlikowski, Region III, Branch Chief, Materials Control and Decommissioning Branch, Division of Nuclear Materials Safety R. Edwards, Region III, Reactor Inspector (Decommissioning), Division of Nuclear Materials Safety J. Lennartz, Region III, Project Engineer, Branch 4, Division of Reactor Projects S. Shah, Region III, Reactor Engineer, Branch 4, Division of Reactor Projects Others as designated Other Attendees:

None Note: The Nuclear Regulatory Commission provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice, or the transcript of other information from the meeting in another format (e.g., Braille, large print), please notify the NRC meeting contact no later than 2 business days prior to the meeting.

Approved by: /RA/_______________________

Jamie Benjamin, Acting Chief Branch 4 Division of Reactor Projects DOCUMENT NAME: Palisades November 14, 2013 Public Webinar Meeting Notice Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME JBenjamin for SShah:rj JBenjamin DATE 10/29/13 10/29/13 OFFICIAL RECORD COPY

Notice of Significant Licensee Meeting DISTRIBUTION:

Daniel Rich, Region III Coordinator, OEDO Allen Howe, Deputy Director, Division of Inspection and Regional Support, NRR RidsNrrPMPalisades Resource RidsNrrDorlLpl3-1 Resource PMNS Resource Kenneth OBrien, Acting Director, Division of Reactor Projects, RIII Julio Lara, Acting Deputy, Director, Division of Reactor Projects, RIII Patrick Louden, Director, Division of Reactor Safety, RIII John Giessner, Acting Deputy, Division of Reactor Safety, RIII Thomas Taylor, Senior Resident Inspector, Palisades DRS Branch Chiefs:

Robert Daley Billy Dickson Richard Skokowski David Hills Hironori Peterson Benny Jose Allan Barker, Regional State Liaison Officer, RIII Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil, RIII Public Affairs Tammy Tomczak, ORA Patricia Buckley, ORA Marjorie Zerth, DRP