Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13325A891 | 23 December 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns | Unanalyzed Condition |
ML14022A282 | 21 December 2013 | Comment (00930) of Michael Keegan on PR-51, Waste Confidence - Continued Storage of Spent Nuclear Fuel | Time to boil Operating Basis Earthquake License Renewal Earthquake Chernobyl Fuel cladding Affidavit |
NRC-13-0062, Rescheduling of Operator Licensing Examinations for 2015 - 2018 | 20 December 2013 | Rescheduling of Operator Licensing Examinations for 2015 - 2018 | |
ML13353A609 | 19 December 2013 | ISI Request for Information | Nondestructive Examination Scaffolding |
ML13266A233 | 18 December 2013 | Request for Withholding Information from Public Disclosure Regarding License Amendment Request to Relocate Pressure and Temperature Limits Report | Pressure and Temperature Limits Report |
IR 05000341/2013007 | 13 December 2013 | IR 05000341-13-007; 11/04/2013 - 11/22/2013; Fermi Power Plant, Unit 2; Routine Biennial Problem Identification and Resolution Inspection | Foreign Material Exclusion |
TAC:MF1176 | 11 December 2013 | ||
ML13309A080 | 11 December 2013 | Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors | |
ML13340A382 | 5 December 2013 | Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters | |
ML13336B471 | 1 December 2013 | Comment (00306) of Charles Bagwell on PR-51, Waste Confidence - Continued Storage of Spent Nuclear Fuel | |
IR 05000341/2013404 | 25 November 2013 | IR 05000341-13-404; 10/21/2013 - 10/24/2013; Fermi Power Plant, Unit 2; Temporary Instruction (Ti) 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats. (Cover Letter Only) | Affidavit |
ML13220A133 | 25 November 2013 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies | Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Seismically rugged Time Critical Operator Action Frazil ice Earthquake Hardened vent |
ML13339A335 | 21 November 2013 | Licensing Document Transmittal Fermi 2 Technical Requirements Manual - Vol I | |
ML13325A947 | 21 November 2013 | EP Exercise Participation | |
ML13309B129 | 21 November 2013 | Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation | High Radiation Area FLEX Spent Fuel Pool Instrumentation Battery sizing Fire Protection Program |
ML13317A894 | 20 November 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Fermi Unit 2, TAC No.: MF0770 | Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Seismically rugged Time Critical Operator Action Frazil ice Earthquake Hardened vent |
NRC-14-0035, Drawing LRA-M-2081, Rev. AV, Diagram Control Rod Drive Hydraulic System Reactor Building (Part 1 of 2) | 18 November 2013 | Drawing LRA-M-2081, Rev. AV, Diagram Control Rod Drive Hydraulic System Reactor Building (Part 1 of 2) | |
NRC-13-0060, Response to NRC Request for Additional Information Regarding the Fermi 2 Seismic Walkdown Report | 18 November 2013 | Response to NRC Request for Additional Information Regarding the Fermi 2 Seismic Walkdown Report | Fukushima Dai-Ichi |
ML14125A407 | 18 November 2013 | Drawing LRA-M-2081, Rev. AV, Diagram Control Rod Drive Hydraulic System Reactor Building (Part 1 of 2) | |
TAC:MF0124 | 18 November 2013 | ||
ML13329A452 | 15 November 2013 | Acceptance Review of IST Program Relief Request PVRR-001 | |
IR 05000341/2013405 | 5 November 2013 | IR 05000341-13-405; 09/16/2013 - 09/26/2013; Fermi Power Plant, Unit 2; Routine Security Baseline Inspection (Cover Letter Only) | Affidavit |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
ML13302B936 | 31 October 2013 | Project Manager Assignment | |
IR 05000341/2013301 | 29 October 2013 | Er 05000341-13-301(DRS); 09/09/2013 - 09/24/2013; Detroit Edison Company, Fermi Power Plant, Unit 2, Initial License Examination Report | Job Performance Measure |
IR 05000341/2013008 | 29 October 2013 | IR 05000341-13-008; 07/08/2013 - 09/06/2013; Fermi Power Plant, Unit 2; Component Design Bases Inspection (CDBI) | Ultimate heat sink Significance Determination Process Design basis earthquake Time Critical Operator Action Battery sizing Earthquake Fire Protection Program Backfit Weak link Power Uprate |
ML13302B869 | 29 October 2013 | Requalification Program Inspection | |
NRC-13-0058, Submittal of Inservice Testing Program Relief, Request PVRR-001, for the Third Ten-Year Interval | 22 October 2013 | Submittal of Inservice Testing Program Relief, Request PVRR-001, for the Third Ten-Year Interval | Grace period |
IR 05000341/2013004 | 22 October 2013 | IR 05000341-13-004; on 07/01/2013 - 09/30/2013; Fermi Power Plant, Unit 2; Integrated Inspection Report | High Radiation Area Offsite Dose Calculation Manual Internal Flooding Temporary Modification Process Control Program Operability Determination Fire Protection Program |
Press Release-13-087, Atomic Safety and Licensing Board Going Forward with Hearing Oct. 30 on Proposed Fermi New Reactor | 18 October 2013 | Press Release-13-087: Atomic Safety and Licensing Board Going Forward with Hearing Oct. 30 on Proposed Fermi New Reactor | |
NRC-13-0057, Response to Request for Additional Information Regarding the Proposed License Amendment to Relocate the Pressure and Temperature Curves to a Pressure and Temperature Limits Report | 17 October 2013 | Response to Request for Additional Information Regarding the Proposed License Amendment to Relocate the Pressure and Temperature Curves to a Pressure and Temperature Limits Report | Hydrostatic Finite Element Analysis Pressure and Temperature Limits Report |
NRC-14-0073, Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 1 of 3 | 16 October 2013 | Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 1 of 3 | |
ML14344B003 | 16 October 2013 | Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report Part 3 of 3 | |
ML14344B001 | 16 October 2013 | Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 1 of 3 | |
NRC-14-0073, Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report Part 3 of 3 | 16 October 2013 | Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report Part 3 of 3 | |
NRC-14-0073, Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 2 of 3 | 16 October 2013 | Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 2 of 3 | |
ML14344B002 | 16 October 2013 | Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 2 of 3 | |
ML13284A084 | 3 October 2013 | Deficiency Report from Baldor Electric Co., on Nuclear Nonconformance Event No. 49302 | |
IR 05000016/2013010 | 2 October 2013 | IR 05000016-13-010, 9/6/2013, Enrico Fermi Unit 1 | |
ML13309A230 | 30 September 2013 | Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100) | Safe Shutdown Ultimate heat sink Internal Flooding Enforcement Discretion Earthquake Hardened vent Backfit |
NRC-14-0035, Drawing LRA-M-N-2053, Rev. Ah, P&ID RHR Service Water System Division Ii RHR Complex | 30 September 2013 | Drawing LRA-M-N-2053, Rev. Ah, P&ID RHR Service Water System Division Ii RHR Complex | |
ML14126A629 | 30 September 2013 | Drawing LRA-M-N-2053, Rev. Ah, P&ID RHR Service Water System Division Ii RHR Complex | |
NRC-13-0045, Update to Measurement Uncertainty Recapture Power Uprate License Amendment Request Tsar | 27 September 2013 | Update to Measurement Uncertainty Recapture Power Uprate License Amendment Request Tsar | Safe Shutdown Shutdown Margin Safety Limit Minimum Critical Power Ratio Ultimate heat sink Fire Barrier Anticipated operational occurrence Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Operator Manual Action Abnormal operational transient Pressure and Temperature Limits Report MELLLA Fire Protection Program |
NRC-13-0054, Response to Request for Additional Information Regarding Fermi 2 2013 Biennial Decommissioning Funding Report | 27 September 2013 | Response to Request for Additional Information Regarding Fermi 2 2013 Biennial Decommissioning Funding Report | |
NRC-13-0053, Response to Request for Additional Information (RAI) Regarding the License Amendment Request to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles | 27 September 2013 | Response to Request for Additional Information (RAI) Regarding the License Amendment Request to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles | Tornado Generated Missile Tornado Missile Protection TORMIS |
ML14125A365 | 25 September 2013 | Drawing LRA-M-2043, Rev. Ag, Diagram High Pressure Coolant Injection System Barometric Cndr (HPCI) Reactor Building | |
NRC-14-0035, Drawing LRA-M-2043, Rev. Ag, Diagram High Pressure Coolant Injection System Barometric Cndr (HPCI) Reactor Building | 25 September 2013 | Drawing LRA-M-2043, Rev. Ag, Diagram High Pressure Coolant Injection System Barometric Cndr (HPCI) Reactor Building | |
NRC-14-0035, Drawing LRA-M-5358, Rev. Ae, Reactor Building Closed Cooling Water | 24 September 2013 | Drawing LRA-M-5358, Rev. Ae, Reactor Building Closed Cooling Water | |
ML14126A564 | 24 September 2013 | Drawing LRA-M-5358, Rev. Ae, Reactor Building Closed Cooling Water | |
ML14126A475 | 17 September 2013 | Drawing LRA-M-2985, Rev. an, Diagram Drips and Drains from Steam Lines and Main Turbine |