Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13325A89123 December 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding WalkdownsUnanalyzed Condition
ML14022A28221 December 2013Comment (00930) of Michael Keegan on PR-51, Waste Confidence - Continued Storage of Spent Nuclear FuelTime to boil
Operating Basis Earthquake
License Renewal
Earthquake
Chernobyl
Fuel cladding
Affidavit
NRC-13-0062, Rescheduling of Operator Licensing Examinations for 2015 - 201820 December 2013Rescheduling of Operator Licensing Examinations for 2015 - 2018
ML13353A60919 December 2013ISI Request for InformationNondestructive Examination
Scaffolding
ML13266A23318 December 2013Request for Withholding Information from Public Disclosure Regarding License Amendment Request to Relocate Pressure and Temperature Limits ReportPressure and Temperature Limits Report
IR 05000341/201300713 December 2013IR 05000341-13-007; 11/04/2013 - 11/22/2013; Fermi Power Plant, Unit 2; Routine Biennial Problem Identification and Resolution InspectionForeign Material Exclusion
TAC:MF117611 December 2013
ML13309A08011 December 2013Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors
ML13340A3825 December 2013Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters
ML13336B4711 December 2013Comment (00306) of Charles Bagwell on PR-51, Waste Confidence - Continued Storage of Spent Nuclear Fuel
IR 05000341/201340425 November 2013IR 05000341-13-404; 10/21/2013 - 10/24/2013; Fermi Power Plant, Unit 2; Temporary Instruction (Ti) 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats. (Cover Letter Only)Affidavit
ML13220A13325 November 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation StrategiesSafe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Seismically rugged
Time Critical Operator Action
Frazil ice
Earthquake
Hardened vent
ML13339A33521 November 2013Licensing Document Transmittal Fermi 2 Technical Requirements Manual - Vol I
ML13325A94721 November 2013EP Exercise Participation
ML13309B12921 November 2013Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool InstrumentationHigh Radiation Area
FLEX
Spent Fuel Pool Instrumentation
Battery sizing
Fire Protection Program
ML13317A89420 November 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Fermi Unit 2, TAC No.: MF0770Safe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Seismically rugged
Time Critical Operator Action
Frazil ice
Earthquake
Hardened vent
NRC-14-0035, Drawing LRA-M-2081, Rev. AV, Diagram Control Rod Drive Hydraulic System Reactor Building (Part 1 of 2)18 November 2013Drawing LRA-M-2081, Rev. AV, Diagram Control Rod Drive Hydraulic System Reactor Building (Part 1 of 2)
NRC-13-0060, Response to NRC Request for Additional Information Regarding the Fermi 2 Seismic Walkdown Report18 November 2013Response to NRC Request for Additional Information Regarding the Fermi 2 Seismic Walkdown ReportFukushima Dai-Ichi
ML14125A40718 November 2013Drawing LRA-M-2081, Rev. AV, Diagram Control Rod Drive Hydraulic System Reactor Building (Part 1 of 2)
TAC:MF012418 November 2013
ML13329A45215 November 2013Acceptance Review of IST Program Relief Request PVRR-001
IR 05000341/20134055 November 2013IR 05000341-13-405; 09/16/2013 - 09/26/2013; Fermi Power Plant, Unit 2; Routine Security Baseline Inspection (Cover Letter Only)Affidavit
ML13304B4181 November 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML13302B93631 October 2013Project Manager Assignment
IR 05000341/201330129 October 2013Er 05000341-13-301(DRS); 09/09/2013 - 09/24/2013; Detroit Edison Company, Fermi Power Plant, Unit 2, Initial License Examination ReportJob Performance Measure
IR 05000341/201300829 October 2013IR 05000341-13-008; 07/08/2013 - 09/06/2013; Fermi Power Plant, Unit 2; Component Design Bases Inspection (CDBI)Ultimate heat sink
Significance Determination Process
Design basis earthquake
Time Critical Operator Action
Battery sizing
Earthquake
Fire Protection Program
Backfit
Weak link
Power Uprate
ML13302B86929 October 2013Requalification Program Inspection
NRC-13-0058, Submittal of Inservice Testing Program Relief, Request PVRR-001, for the Third Ten-Year Interval22 October 2013Submittal of Inservice Testing Program Relief, Request PVRR-001, for the Third Ten-Year IntervalGrace period
IR 05000341/201300422 October 2013IR 05000341-13-004; on 07/01/2013 - 09/30/2013; Fermi Power Plant, Unit 2; Integrated Inspection ReportHigh Radiation Area
Offsite Dose Calculation Manual
Internal Flooding
Temporary Modification
Process Control Program
Operability Determination
Fire Protection Program
Press Release-13-087, Atomic Safety and Licensing Board Going Forward with Hearing Oct. 30 on Proposed Fermi New Reactor18 October 2013Press Release-13-087: Atomic Safety and Licensing Board Going Forward with Hearing Oct. 30 on Proposed Fermi New Reactor
NRC-13-0057, Response to Request for Additional Information Regarding the Proposed License Amendment to Relocate the Pressure and Temperature Curves to a Pressure and Temperature Limits Report17 October 2013Response to Request for Additional Information Regarding the Proposed License Amendment to Relocate the Pressure and Temperature Curves to a Pressure and Temperature Limits ReportHydrostatic
Finite Element Analysis
Pressure and Temperature Limits Report
NRC-14-0073, Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 1 of 316 October 2013Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 1 of 3
ML14344B00316 October 2013Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report Part 3 of 3
ML14344B00116 October 2013Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 1 of 3
NRC-14-0073, Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report Part 3 of 316 October 2013Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report Part 3 of 3
NRC-14-0073, Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 2 of 316 October 2013Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 2 of 3
ML14344B00216 October 2013Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 2 of 3
ML13284A0843 October 2013Deficiency Report from Baldor Electric Co., on Nuclear Nonconformance Event No. 49302
IR 05000016/20130102 October 2013IR 05000016-13-010, 9/6/2013, Enrico Fermi Unit 1
ML13309A23030 September 2013Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100)Safe Shutdown
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Earthquake
Hardened vent
Backfit
NRC-14-0035, Drawing LRA-M-N-2053, Rev. Ah, P&ID RHR Service Water System Division Ii RHR Complex30 September 2013Drawing LRA-M-N-2053, Rev. Ah, P&ID RHR Service Water System Division Ii RHR Complex
ML14126A62930 September 2013Drawing LRA-M-N-2053, Rev. Ah, P&ID RHR Service Water System Division Ii RHR Complex
NRC-13-0045, Update to Measurement Uncertainty Recapture Power Uprate License Amendment Request Tsar27 September 2013Update to Measurement Uncertainty Recapture Power Uprate License Amendment Request TsarSafe Shutdown
Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operator Manual Action
Abnormal operational transient
Pressure and Temperature Limits Report
MELLLA
Fire Protection Program
NRC-13-0054, Response to Request for Additional Information Regarding Fermi 2 2013 Biennial Decommissioning Funding Report27 September 2013Response to Request for Additional Information Regarding Fermi 2 2013 Biennial Decommissioning Funding Report
NRC-13-0053, Response to Request for Additional Information (RAI) Regarding the License Amendment Request to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles27 September 2013Response to Request for Additional Information (RAI) Regarding the License Amendment Request to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated MissilesTornado Generated Missile
Tornado Missile Protection
TORMIS
ML14125A36525 September 2013Drawing LRA-M-2043, Rev. Ag, Diagram High Pressure Coolant Injection System Barometric Cndr (HPCI) Reactor Building
NRC-14-0035, Drawing LRA-M-2043, Rev. Ag, Diagram High Pressure Coolant Injection System Barometric Cndr (HPCI) Reactor Building25 September 2013Drawing LRA-M-2043, Rev. Ag, Diagram High Pressure Coolant Injection System Barometric Cndr (HPCI) Reactor Building
NRC-14-0035, Drawing LRA-M-5358, Rev. Ae, Reactor Building Closed Cooling Water24 September 2013Drawing LRA-M-5358, Rev. Ae, Reactor Building Closed Cooling Water
ML14126A56424 September 2013Drawing LRA-M-5358, Rev. Ae, Reactor Building Closed Cooling Water
ML14126A47517 September 2013Drawing LRA-M-2985, Rev. an, Diagram Drips and Drains from Steam Lines and Main Turbine