Issue date | Title | Topic | |
---|---|---|---|
W3F1-2011-0022, Core Operating Limits Report - Cycle 17 Revision 1 | 31 March 2011 | Core Operating Limits Report - Cycle 17 Revision 1 | Shutdown Margin Coatings |
CNRO-2011-00002, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) | 31 March 2011 | Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) | |
CNRO-2011-00001, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc | 31 March 2011 | Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc | Decommissioning Funding Plan |
W3F1-2011-0027, Update to Response to NRC Order EA-10-092 Regarding Independent Spent Fuel Storage Installations (ISFSI) | 31 March 2011 | Update to Response to NRC Order EA-10-092 Regarding Independent Spent Fuel Storage Installations (ISFSI) | |
TAC:ME5925 | 30 March 2011 | ||
ML110831003 | 24 March 2011 | Acceptance Review Email, Request for Alternative W3-1SI-018, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During the Third Ten-Year Inservice Inspection Interval | |
ML110831023 | 24 March 2011 | Acceptance Review Email, Request for Alternative W3-ISI-019 from Inservice Inspection Requirements of Reactor Vessel Head In-Core Instrument Nozzles, Third 10-Year Inservice Inspection Interval | |
ML110630259 | 23 March 2011 | Issuance of Amendment No. 233, Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves | Safe Shutdown Anticipated operational occurrence Code Reconciliation Power-Operated Valves Power Operated Valves Fire Protection Program |
ML110970395 | 21 March 2011 | WT-2011-03 Draft Outline Comments | |
ML110970398 | 21 March 2011 | 2011-03-Draft Written Exam | Boric Acid Time of Discovery Enforcement Discretion Earthquake Power change Coast down |
ML110970399 | 21 March 2011 | WT-2011-03 Draft Written Exam Comments | |
ML110970432 | 21 March 2011 | WT-2011-03 Draft Op Test Comments | |
ML110970438 | 21 March 2011 | WT-2011-03 Final Outlines | Boric Acid Shutdown Margin Ultimate heat sink |
ML110970446 | 21 March 2011 | 2011-03-Final Written Exam | Boric Acid Enforcement Discretion Earthquake |
ML110970454 | 21 March 2011 | WT-2011-03 Final Operating Test | Boric Acid Shutdown Margin Ultimate heat sink Stroke time Job Performance Measure Scaffolding Power change |
ML110970470 | 21 March 2011 | WT-2011-03 Post Exam Comments | |
ML111110689 | 21 March 2011 | WT-2011-03 Public Forms | |
TAC:ME5857 | 21 March 2011 | ||
ML111160176 | 21 March 2011 | WT-2011-03 Draft Outlines | Boric Acid Shutdown Margin Ultimate heat sink |
ML111160185 | 21 March 2011 | WT-2011-03 Draft Operating Test | Boric Acid Shutdown Margin Ultimate heat sink Job Performance Measure |
ML110750405 | 21 March 2011 | Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements | |
W3F1-2011-0025, Transmittal of Proprietary Valcor Report | 18 March 2011 | Transmittal of Proprietary Valcor Report | |
W3F1-2011-0024, Special Report SR-11-001-00, Plant Stack Wide Range Gas Monitor PRM-IRE-0110 Inoperable for Greater than 7 Days | 17 March 2011 | Special Report SR-11-001-00, Plant Stack Wide Range Gas Monitor PRM-IRE-0110 Inoperable for Greater than 7 Days | |
ML110750550 | 16 March 2011 | NRC Initial Operator Licensing Examination Approval 05000382/11-301 | |
ML110690447 | 10 March 2011 | Email Forwarding 6/28/2010 NRC Request for Additional Information on License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves | |
W3F1-2011-0020, Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition | 7 March 2011 | Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition | |
IR 05000382/2011001 | 4 March 2011 | Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382-11-001) | |
ML110630123 | 4 March 2011 | Notification of Inspection (NRC Inspection Report 05000382-11-003) and Request for Information | Boric Acid Nondestructive Examination VT-2 |
ML110410119 | 28 February 2011 | Issuance of Amendment No. 232, Approval of Change to Final Safety Analysis Report for Leak-Before-Break of the Pressurizer Surge Line | Safe Shutdown Earthquake Weld Overlay Probabilistic Risk Assessment Pressure Boundary Leakage Pressure boundary leak Through-Wall Leak Dissimilar Metal Weld |
ML110600689 | 25 February 2011 | CFR Part 26, Subpart I - Managing Fatigue, for Period of 2010 | |
ML110600714 | 25 February 2011 | Single Positive Test Form for Random, Collected on 11/29/2010 | |
ML110600713 | 25 February 2011 | Single Positive Test Form for Pre-Access, Collected on 11/10/2010 | |
ML110600711 | 25 February 2011 | Single Positive Test Form for Random, Collected on 11/03/2010 | |
ML110600692 | 24 February 2011 | Annual Reporting Form for Drug and Alcohol Tests for Period of 2010 | |
ML110060470 | 24 February 2011 | Exemption from the Requirements of 10 CFR 26 Subpart I - Managing Fatigue | Safe Shutdown Fitness for Duty High winds Exemption Request Fatigue Rule |
ML110600698 | 24 February 2011 | Single Positive Test Form for Cause, Collected on 11/03/2010 | |
ML110600697 | 24 February 2011 | Single Positive Test Form for Pre-Access, Collected on 10/04/2010 | |
ML110600696 | 24 February 2011 | Single Positive Test Form for Pre-Access, Collected on 03/23/2010 | |
ML110600694 | 24 February 2011 | Single Positive Test Form for Random, Collected on 01/26/2010 | |
ML110540734 | 23 February 2011 | E-mail, Request for Additional Information, Round 2, License Amendment Request to Revise License Condition and Approve Cyber Security Plan | Cyber Security |
ML110140026 | 23 February 2011 | Issuance of Amendment No. 231, Modify Technical Specification 3/4.9.4, Containment Building Penetrations, to Allow Alternative Means of Penetration Closure During Refueling Operations | Grab sample |
NRC-2011-0023, Exemption from the Requirements of 10 CFR 26 Subpart I - Managing Fatigue | 23 February 2011 | Exemption from the Requirements of 10 CFR 26 Subpart I - Managing Fatigue | Safe Shutdown High winds Exemption Request Fatigue Rule |
ML110060472 | 23 February 2011 | Exemption from the Requirements of 10 CFR 26 Subpart I - Managing Fatigue | Safe Shutdown High winds Exemption Request Fatigue Rule |
ML110490519 | 18 February 2011 | E-mail Request for Additional Information, Round 5, License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves | |
ML110350421 | 18 February 2011 | Request for Withholding Information from Public Disclosure - Affidavit Executed by C. King, Electric Power Research Institute on 12/17/10; 04/05 MRP-109, Alloy 82/182 Pipe Butt Weld Safety Assessment for U.S. PWR Plant Designs | |
TAC:ME5701 | 16 February 2011 | ||
TAC:ME5702 | 16 February 2011 | ||
W3F1-2011-0014, Request for Alternative W3-ISI-019, Inspection of Reactor Vessel Head In-Core Instrument Nozzles During the Third Ten-Year Inservice Inspection Interval | 16 February 2011 | Request for Alternative W3-ISI-019, Inspection of Reactor Vessel Head In-Core Instrument Nozzles During the Third Ten-Year Inservice Inspection Interval | Liquid penetrant |
W3F1-2011-0013, Request for Alternative W3-ISI-018, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During the Third Ten-Year Inservice Inspection Interval | 16 February 2011 | Request for Alternative W3-ISI-018, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During the Third Ten-Year Inservice Inspection Interval | |
ML110470184 | 15 February 2011 | Attachment 2 to W3F1-2011-0016, Waterford, Unit 3, List of Regulatory Commitments | Cyber Security |