Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
W3F1-2011-0022, Core Operating Limits Report - Cycle 17 Revision 131 March 2011Core Operating Limits Report - Cycle 17 Revision 1Shutdown Margin
Coatings
CNRO-2011-00002, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))31 March 2011Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))
CNRO-2011-00001, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc31 March 2011Status of Decommissioning Funding for Plants Operated by Entergy Operations, IncDecommissioning Funding Plan
W3F1-2011-0027, Update to Response to NRC Order EA-10-092 Regarding Independent Spent Fuel Storage Installations (ISFSI)31 March 2011Update to Response to NRC Order EA-10-092 Regarding Independent Spent Fuel Storage Installations (ISFSI)
TAC:ME592530 March 2011
ML11083100324 March 2011Acceptance Review Email, Request for Alternative W3-1SI-018, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During the Third Ten-Year Inservice Inspection Interval
ML11083102324 March 2011Acceptance Review Email, Request for Alternative W3-ISI-019 from Inservice Inspection Requirements of Reactor Vessel Head In-Core Instrument Nozzles, Third 10-Year Inservice Inspection Interval
ML11063025923 March 2011Issuance of Amendment No. 233, Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation ValvesSafe Shutdown
Anticipated operational occurrence
Code Reconciliation
Power-Operated Valves
Power Operated Valves
Fire Protection Program
ML11097039521 March 2011WT-2011-03 Draft Outline Comments
ML11097039821 March 20112011-03-Draft Written ExamBoric Acid
Time of Discovery
Enforcement Discretion
Earthquake
Power change
Coast down
ML11097039921 March 2011WT-2011-03 Draft Written Exam Comments
ML11097043221 March 2011WT-2011-03 Draft Op Test Comments
ML11097043821 March 2011WT-2011-03 Final OutlinesBoric Acid
Shutdown Margin
Ultimate heat sink
ML11097044621 March 20112011-03-Final Written ExamBoric Acid
Enforcement Discretion
Earthquake
ML11097045421 March 2011WT-2011-03 Final Operating TestBoric Acid
Shutdown Margin
Ultimate heat sink
Stroke time
Job Performance Measure
Scaffolding
Power change
ML11097047021 March 2011WT-2011-03 Post Exam Comments
ML11111068921 March 2011WT-2011-03 Public Forms
TAC:ME585721 March 2011
ML11116017621 March 2011WT-2011-03 Draft OutlinesBoric Acid
Shutdown Margin
Ultimate heat sink
ML11116018521 March 2011WT-2011-03 Draft Operating TestBoric Acid
Shutdown Margin
Ultimate heat sink
Job Performance Measure
ML11075040521 March 2011Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements
W3F1-2011-0025, Transmittal of Proprietary Valcor Report18 March 2011Transmittal of Proprietary Valcor Report
W3F1-2011-0024, Special Report SR-11-001-00, Plant Stack Wide Range Gas Monitor PRM-IRE-0110 Inoperable for Greater than 7 Days17 March 2011Special Report SR-11-001-00, Plant Stack Wide Range Gas Monitor PRM-IRE-0110 Inoperable for Greater than 7 Days
ML11075055016 March 2011NRC Initial Operator Licensing Examination Approval 05000382/11-301
ML11069044710 March 2011Email Forwarding 6/28/2010 NRC Request for Additional Information on License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves
W3F1-2011-0020, Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition7 March 2011Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition
IR 05000382/20110014 March 2011Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382-11-001)
ML1106301234 March 2011Notification of Inspection (NRC Inspection Report 05000382-11-003) and Request for InformationBoric Acid
Nondestructive Examination
VT-2
ML11041011928 February 2011Issuance of Amendment No. 232, Approval of Change to Final Safety Analysis Report for Leak-Before-Break of the Pressurizer Surge LineSafe Shutdown Earthquake
Weld Overlay
Probabilistic Risk Assessment
Pressure Boundary Leakage
Pressure boundary leak
Through-Wall Leak
Dissimilar Metal Weld
ML11060068925 February 2011CFR Part 26, Subpart I - Managing Fatigue, for Period of 2010
ML11060071425 February 2011Single Positive Test Form for Random, Collected on 11/29/2010
ML11060071325 February 2011Single Positive Test Form for Pre-Access, Collected on 11/10/2010
ML11060071125 February 2011Single Positive Test Form for Random, Collected on 11/03/2010
ML11060069224 February 2011Annual Reporting Form for Drug and Alcohol Tests for Period of 2010
ML11006047024 February 2011Exemption from the Requirements of 10 CFR 26 Subpart I - Managing FatigueSafe Shutdown
Fitness for Duty
High winds
Exemption Request
Fatigue Rule
ML11060069824 February 2011Single Positive Test Form for Cause, Collected on 11/03/2010
ML11060069724 February 2011Single Positive Test Form for Pre-Access, Collected on 10/04/2010
ML11060069624 February 2011Single Positive Test Form for Pre-Access, Collected on 03/23/2010
ML11060069424 February 2011Single Positive Test Form for Random, Collected on 01/26/2010
ML11054073423 February 2011E-mail, Request for Additional Information, Round 2, License Amendment Request to Revise License Condition and Approve Cyber Security PlanCyber Security
ML11014002623 February 2011Issuance of Amendment No. 231, Modify Technical Specification 3/4.9.4, Containment Building Penetrations, to Allow Alternative Means of Penetration Closure During Refueling OperationsGrab sample
NRC-2011-0023, Exemption from the Requirements of 10 CFR 26 Subpart I - Managing Fatigue23 February 2011Exemption from the Requirements of 10 CFR 26 Subpart I - Managing FatigueSafe Shutdown
High winds
Exemption Request
Fatigue Rule
ML11006047223 February 2011Exemption from the Requirements of 10 CFR 26 Subpart I - Managing FatigueSafe Shutdown
High winds
Exemption Request
Fatigue Rule
ML11049051918 February 2011E-mail Request for Additional Information, Round 5, License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves
ML11035042118 February 2011Request for Withholding Information from Public Disclosure - Affidavit Executed by C. King, Electric Power Research Institute on 12/17/10; 04/05 MRP-109, Alloy 82/182 Pipe Butt Weld Safety Assessment for U.S. PWR Plant Designs
TAC:ME570116 February 2011
TAC:ME570216 February 2011
W3F1-2011-0014, Request for Alternative W3-ISI-019, Inspection of Reactor Vessel Head In-Core Instrument Nozzles During the Third Ten-Year Inservice Inspection Interval16 February 2011Request for Alternative W3-ISI-019, Inspection of Reactor Vessel Head In-Core Instrument Nozzles During the Third Ten-Year Inservice Inspection IntervalLiquid penetrant
W3F1-2011-0013, Request for Alternative W3-ISI-018, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During the Third Ten-Year Inservice Inspection Interval16 February 2011Request for Alternative W3-ISI-018, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During the Third Ten-Year Inservice Inspection Interval
ML11047018415 February 2011Attachment 2 to W3F1-2011-0016, Waterford, Unit 3, List of Regulatory CommitmentsCyber Security