Attachment 6 OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Facility: Waterford First Exam Date:
March 21, 2011 Written Exam Outline (1/14/2011)
Comment Resolution 1
- 1 on all #s on Outlines - Replace with test number to be associated with that K/A Fixed 2
3 4
5 Administrative JPM Outline (1/14/2011)
Comment Resolution 1 A5 - K/A 2.1.23 used on last 3 exams -
Replace Replaced 2 A8 - Needs Type Code P - Used 10/09 exam Fixed 3 A2 - used on 10/09 exam 4
5 A1 - really done in simulator?
Yes 6
A9 - really done in simulator?
Yes 7
Control Room / In-Plant System JPM Outline (1/14/2011)
Comment Resolution 1
2 P1 - used on 10/10 exam 3 JPMs previously used are randomly selected?
Yes 4 S2/S6 can be run in parallel with S4?
Yes 5 S7/S8 can be run in parallel?
Yes
OBDI 202 - IOLE Process Simulator Scenario Outline Comments (Date)
Comment Resolution 1
2 Scenario All - List Critical Tasks on D-1 Fixed 3
Scenario 1 - BOP should get reactivity credit for lowering turbine load on event 3
Fixed 4
Scenario 1 - Event 5, Charging Pump A fails to auto start - does ATC manually start this pump to receive component credit?
Yes.
5