WT-2011-03 Draft Outline Comments
ML110970395
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/21/2011
From:
NRC Region 4
To:
Entergy Operations
References
50-382/11-301
Download: ML110970395 (2)


Text

DRAFT OUTLINE COMMENTS Facility: Waterford First Exam Date: March 21, 2011 Written Exam Outline (1/14/2011)

Comment Resolution

  1. 1 on all #s on Outlines - Replace with Fixed 1 test number to be associated with that K/A 2

3 4

5 Administrative JPM Outline (1/14/2011)

Comment Resolution A5 - K/A 2.1.23 used on last 3 exams - Replaced 1

Replace A8 - Needs Type Code P - Used 10/09 Fixed 2

exam 3 A2 - used on 10/09 exam 4

5 A1 - really done in simulator? Yes 6 A9 - really done in simulator? Yes 7

Control Room / In-Plant System JPM Outline (1/14/2011)

Comment Resolution 1

2 P1 - used on 10/10 exam JPMs previously used are randomly Yes 3

selected?

4 S2/S6 can be run in parallel with S4? Yes 5 S7/S8 can be run in parallel? Yes OBDI 202 - IOLE Process

Simulator Scenario Outline Comments (Date)

Comment Resolution 1

2 Scenario All - List Critical Tasks on D-1 Fixed Scenario 1 - BOP should get reactivity Fixed 3 credit for lowering turbine load on event 3

Scenario 1 - Event 5, Charging Pump A Yes.

fails to auto start - does ATC manually 4

start this pump to receive component credit?

5 OBDI 202 - IOLE Process