Letter Sequence RAI |
|---|
|
|
MONTHYEARW3F1-2010-0003, License Amendment Request for Approval of Leak-Before-Break of the Pressurizer Surge Line2010-02-22022 February 2010 License Amendment Request for Approval of Leak-Before-Break of the Pressurizer Surge Line Project stage: Request ML1008205662010-03-23023 March 2010 Acceptance Review Email, License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves Project stage: Acceptance Review ML1010406512010-04-14014 April 2010 E-mail, Request for Additional Information, License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves Project stage: RAI W3F1-2010-0065, Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition2010-08-12012 August 2010 Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition Project stage: Response to RAI W3F1-2010-0064, Response to NRC Requests for Additional Information Regarding License Amendment Request for Leak-Before-Break of the Pressurizer Surge Line2010-08-12012 August 2010 Response to NRC Requests for Additional Information Regarding License Amendment Request for Leak-Before-Break of the Pressurizer Surge Line Project stage: Response to RAI ML1030101802010-10-28028 October 2010 E-mail Request for Additional Information, Round 2, License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves Project stage: RAI ML1101806542011-01-18018 January 2011 Request for Additional Information Email on the LAR to Revise TS 3.4-1, Isolation Valve Addition Project stage: RAI ML1102403742011-01-24024 January 2011 E-mail Request for Additional Information, Round 4, License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves Project stage: RAI ML1104905192011-02-18018 February 2011 E-mail Request for Additional Information, Round 5, License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves Project stage: RAI ML1106904472011-03-10010 March 2011 Email Forwarding 6/28/2010 NRC Request for Additional Information on License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves Project stage: RAI W3F1-2011-0025, Transmittal of Proprietary Valcor Report2011-03-18018 March 2011 Transmittal of Proprietary Valcor Report Project stage: Request ML1106302592011-03-23023 March 2011 Issuance of Amendment No. 233, Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves Project stage: Approval ML1108004372011-04-26026 April 2011 Request for Withholding Information from Public Disclosure, 3/16/11 Affidavit Executed by S. Gatcomb, Valcor Engineering Corporation Project stage: Withholding Request Acceptance ML1111505082011-04-27027 April 2011 Correction Notice, Biweekly Notice of Issuance of Amendment No. 233 Project stage: Approval ML1111106332011-04-27027 April 2011 Correction to Amendment No. 233 to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves Project stage: Other NRC-2011-0071, Correction Notice, Biweekly Notice of Issuance of Amendment No. 2332011-04-27027 April 2011 Correction Notice, Biweekly Notice of Issuance of Amendment No. 233 Project stage: Approval 2011-01-24
[Table View] |
Text
From:
Kalyanam, Kaly Sent:
Thursday, March 10, 2011 9:21 AM To:
STEELMAN, WILLIAM J Cc:
Lent, Susan
Subject:
Follow-up questions on LAR (TAC No. ME3421)
- Billy, The following email was sent to you on June 28, 2010, and inadvertently did not get into our ADAMS system. The RAI is being resent to you so that it can be put into the system. Entergy has already provided the responses to the questions here and need not take any further action.
Thanks Kaly Plant: Waterford Steam Electric Station, Unit 3 Docket No.: 50/382 Subject Follow-up questions on your supplement dated June 8, 2010 on the LAR, Addition of Isolation Valves to TS Table 3.4-1 TAC Nos.: ME3418 SUNSI Review Done: Yes. Publicly Available, Normal Release, Non-sensitive, From: N. Kalyanam To: W. Steelman
- Billy, By letter dated February 22, 2010, as supplemented by letter dated June 8, 2010, Entergy Operations, Inc. (Entergy) made application to amend the Technical Specifications (TS) of the Waterford Steam Electric Station, Unit 3 (Waterford 3).
The proposed amendment adds valve SI-4052A (Reactor Coolant Loop 2, Shutdown Cooling Suction, Inside Containment Bypass Isolation) and valve SI-4052B ((Reactor Coolant Loop 1, Shutdown Cooling Suction, Inside Containment Bypass Isolation) to Technical Specification Table 3.4-1. The purpose of this line is to equalize the shutdown cooling system pressure down stream of valve SI-405A (Reactor Coolant Loop 2, Shutdown Cooling Suction Inside Containment Isolation) and valve SI-405B
((Reactor Coolant Loop 1, Shutdown Cooling Suction Inside Containment Isolation).
After an initial review, the NRC staff has the following 2 comments on your response dated June 8, 2010, to RAI on subject LAR.
The staff requests you to provide required additional information as soon as possible, but within 30 days of the receipt of this request.
Thanks Kaly REQUEST FOR ADDITIONAL INFORMATION ENTERGY OPERATIONS, INC.
WATERFORD STEAM ELECTRIC STATION UNIT 3 DOCKET NO. 50-382
- 1) RAI 6.b response - We need a summary of the licensees EQ calculation. All design information has to be completed before we can review the application.
- 2) RAI 7 - The licensee needs to provide a protective coordination curve that shows the penetration, loads, and cables are protected by the fuses/breakers.