Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-11-016, Response to Request for Additional Information Regarding Exelon Cyber Security Plan; Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island31 March 2011Response to Request for Additional Information Regarding Exelon Cyber Security Plan; Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile IslandCyber Security
TAC:ME365231 March 2011
RS-11-044, 2011 Report on Status of Decommissioning Funding for Reactors31 March 20112011 Report on Status of Decommissioning Funding for Reactors
TMI-11-026, Decommissioning Funding Status Report30 March 2011Decommissioning Funding Status Report
ML11062016725 March 2011Request for Additional Information Regarding License Amendment Request Proposing Changes to the Number of Required Operable Main Steam Safety Valves
ML11081097225 March 2011Summary of March 14, 2011, Meeting with Exelon to Discuss Proposed Main Steam Safety Valve License Amendment Request
ML11080030621 March 2011Cancelled - 03/24/2011 Public Meeting with Exelon Generation Co., LLC, Three Mile Island to Discuss the Nrc'S Assessment of Safety Performance for Calendar Year 2010Open House
ML11054037421 March 2011Request for Additional Information Regarding Proposed Relocation of Equipment Load List from the Technical Specifications to a Licensee Controlled Document
ML11077029618 March 2011Response to Request for Additional Information Related to Technical Specification Change Request No. 351: Maximum Allowable Power with Inoperable Main Steam Safety Valves
ML11073058616 March 2011Request for Additional Information Regarding Relief Request RR-10-01, Control Rod Drive Housing Examinations Associated with the Third Inservice Inspection IntervalVT-2
TMI-11-061, ISI Program Plan, Fourth Ten-Year Inspection Interval15 March 2011ISI Program Plan, Fourth Ten-Year Inspection IntervalBoric Acid
Weld Overlay
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Incorporated by reference
Moisture barrier
License Renewal
Control of Heavy Loads
EVT-1
Liquid penetrant
Dissimilar Metal Weld
Power change
ML11073004914 March 2011Acceptance Review of TMI-1 Relief Requests RR-11-01 and RR-11-02, TAC Nos ME5670/5671
ML11073005014 March 2011Delay in Transmittal of Director'S Decision
ML11073056914 March 2011Electronic Transmission, Draft Request for Additional Information Regarding Relief Request RR-10-01, Control Rod Drive Housing Examinations Associated with the Third Inservice Inspection IntervalVT-2
ML11069107810 March 2011Licensed Operator Requalification Program Inspection - Three Mile Island, Dated March 10, 2011
TMI-11-030, Response to Request for Additional Information - Submittal of Relief Request RR-10-02 Concerning the Weld Overlay of the Pressurizer Spray Nozzle to Safe-End and Safe-End to Elbow Dissimilar Metal Welds9 March 2011Response to Request for Additional Information - Submittal of Relief Request RR-10-02 Concerning the Weld Overlay of the Pressurizer Spray Nozzle to Safe-End and Safe-End to Elbow Dissimilar Metal WeldsWeld Overlay
Dissimilar Metal Weld
ML1106603519 March 2011Letter Change in U.S. Nuclear Regulatory Commission Staff Project Management for Three Mile Island Nuclear Station, Unit 2
ML1107005247 March 2011Single Positive Test Form, for Cause, Collected on 03/23/2010
ML1107005227 March 2011Single Positive Test Form, for Pre-Access, Collected on 01/25/2010
L-11-042, Annual Notification of Nuclear Property Insurance Coverage7 March 2011Annual Notification of Nuclear Property Insurance Coverage
ML1105508754 March 2011Fleet - Request for Additional Information Regarding Approval of Cyber Security PlanCyber Security
TAC:ME97624 March 2011
ML1105507074 March 2011Re-Issuance Letter Regarding Amendment No. 273 Technical Specification Changes to Reflect Control Rod Drive Control System UpgradeSurveillance Frequency Control Program
IR 05000289/20100014 March 2011Annual Assessment Letter for Three Mile Island Nuclear Generating Station, Unit 1, EOC-11 (Report 05000289-10-001)
ML1106200273 March 2011Electronic Transmission, Draft Request for Additional Information Proposed Technical Specification Changes Regarding Number of Required Operable Main Steam Safety Valves
ML1107301413 March 2011Submittal of Three Mile Island, Unit 2, Safety Analysis Update Report (EM-FMDP-11-024)Grace period
ML1106205893 March 2011Public Meeting to Discuss the Nrc'S Assessment of the Safety Performance at the Three Mile Island Power Station for Calendar Year 2010, as Described in the Annual Assessment Letter Dated March 4, 2011Open House
IR 05000289/20110071 March 2011IR 05000289/2011007; 01/24/2011 - 02/11/2011; Exelon Generation Company, LLC; Three Mile Island, Unit 1; Triennial Fire Protection Team InspectionHot Short
Safe Shutdown
Fire Barrier
Emergency Lighting
Job Performance Measure
Time Critical Operator Action
Exemption Request
Fire Protection Program
ML11034024628 February 2011Request for Additional Information Regarding Relief Request RR-10-02, Weld Overlay of the Pressurizer Spray Nozzle to Safe-End and Safe-End to Elbow Dissimilar Metal WeldsWeld Overlay
Dissimilar Metal Weld
ML11055091825 February 2011Notice of Meeting with Exelon Generation Company, LLC, to Discuss Three Mile Island, Unit 1, Main Steam Safety Valve License Amendment Request
ML11070052025 February 2011Single Positive Test Form, for Random, Collected on 06/04/2010
RS-11-024, Submittal of Fitness for Duty Performance Data Reports - Annual 201025 February 2011Submittal of Fitness for Duty Performance Data Reports - Annual 2010Fitness for Duty
ML11070051924 February 2011Single Positive Test Form, for Pre-Access, Collected on 11/15/2010
ML11118A00123 February 2011Notice of Rule 30(b)(6) Deposition
ML11054034123 February 2011Email from FENOC 2.206 Petition
ML11054034723 February 2011Electronic Transmission, Draft Request for Additional Information, Proposed Technical Specification Changes Regarding Relocation of Equipment Load List from Technical Specifications to a Licensee Controlled Document
TMI-11-012, 2010 Annual Report23 February 20112010 Annual ReportPacking leak
ML11070051822 February 2011Single Positive Test Form, for Pre-Access, Collected on 01/19/2010
ML11073002118 February 2011G20110170/LTR-11-0102/EDATS: SECY-2011-0138 - Resp. Letter to Peter A. Deluca Susquehanna River Basin Commission 2011 Water Resources Program
ML11049020617 February 2011Senior Reactor and Reactor Initial Operating Exams
ML11035037914 February 2011Request for Additional Information Regarding License Amendment Request Proposing Changes to the Number of Required Operable Main Steam Safety Valves
TAC:ME567010 February 2011
TMI-11-017, Submittal of Relief Request RR-11-01 and RR-11-0210 February 2011Submittal of Relief Request RR-11-01 and RR-11-02Liquid penetrant
ML1103416644 February 2011Electronic Transmission, Draft Request for Additional Information, Proposed Technical Specification Changes Regarding Number of Required Operable Main Steam Safety Valves
IR 05000289/20100053 February 2011IR 05000289-10-005 10/1/2010-12/31/2010; Exelon Generation Company, LLC; Three Mile Island, Unit 1, Maintenance Effectiveness and Identification and Resolution of ProblemsTime of Discovery
High Radiation Area
Offsite Dose Calculation Manual
Internal Flooding
Functionality Assessment
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Fire Protection Program
Scaffolding
Downpower
ML1103402023 February 2011Electronic Transmission, Draft Request for Additional Information Regarding Relief Request RR-10-02, Weld Overlay of the Pressurizer Spray Nozzle to Safe-End and Safe-End to Elbow Dissimilar Metal WeldsWeld Overlay
Dissimilar Metal Weld
IR 05000289/201140331 January 2011IR 05000289-11-403, on 01/11/11-01/12/2011, Three Mile Island Nuclear Station, Unit 1, Security Baseline InspectionAffidavit
TMI-11-007, Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection Interval25 January 2011Response to Request for Additional Information Concerning Relief Requests Associated with the Fourth Inservice Inspection IntervalProbabilistic Risk Assessment
Large early release frequency
ML11014034314 January 2011Announcement of Generic Fundamentals Examination (GFE) 2011 Administration DatesGeneric Fundamentals Examination
ML10312006912 January 2011Issuance of Amendment Request to Relocate Surveillance Frequencies to a Licensee Controlled ProgramSafe Shutdown
Reactor Vessel Water Level
High Radiation Area
Offsite Dose Calculation Manual
Post Accident Monitoring
Probabilistic Risk Assessment
Incorporated by reference
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Large early release frequency
Fire Protection Program
Backfit
Power change