ML110490206

From kanterella
Jump to navigation Jump to search
Senior Reactor and Reactor Initial Operating Exams
ML110490206
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 02/17/2011
From: Hansell S
Operations Branch I
To: Pacilio M
Exelon Generation Co
Hansell S
Shared Package
ML110030671 List:
References
Download: ML110490206 (5)


Text

UNITED STATES N UCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA. PA 19406.1415 February L7, 2011 Mr. MichaelJ. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.

Warrenville, lL 60555

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR lNlTlAL EXAMINATIONS -

THREE MILE ISLAND NUCLEAR STATION, UNIT 1

Dear Mr. Pacilio:

ln a telephone conversation on February 16,2011, between Mr. John G. Caruso, Senior Operations Engineer/Chief Examiner, and Mr. John Blair, Operations Training Manager, arrangements were made for the administration of licensing examinations at Three Mile lsland Nuclear Station, Unit 1 during the week of August 29,2011.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by May 27 ,2011. The written examinations, operating tests, and the supporting reference materials identified in Attachment 3 of ES-201 will be due by June 29, 2011. Pursuant to Title 1 0, Section 55.40(b) (3), of the Code of Federal Regulations ( 10 CFR 55.40(b) (3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.9., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

M. Pacilio To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. lf the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that alltraining has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Otfice of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.qov/readinq-rm/adams.html.

Sincerely,

/RA Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No: 50-289 License No: DPR-50 SUNSI Review Complete: iqc (Reviewer's Initials)

ADAMS PKG: ML110030671 ADAMS NO: ML110490206 DOCUMENT NAME: G:\DRS\Operations Branch\CARUSO\Exam 11-TMlAug 11 (U01829)\120dayexamltr.doc After this document "An Official Record," it will be released to the Public.

DATE O2t17t11

M. Pacilio 2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. lf the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOlA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of lnformation and Regulatory Affairs, NEOB-102Q2, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.qov/readinq-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Blair has been advised of the policies and guidelines referenced in this letter. lf you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. John Caruso at (610) 337-5389, or me at (610) 337-5046.

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No: 50-289 License No: DPR-50

M. Pacilio 3 cc:

T. Van Wyen, Director of Training cc: Distribution via ListServ

M. Pacilio Distribution:

W. Dean. RA (RIORAMAlL Resource)

D. Lew, DRA (RIORAMAIL Resource)

D. Roberts, DRP (RIDRPMAlL Resource)

J. Clifford, DRP (RI DRPMAlL Resource)

P. Wilson, DRS (Rl DRSMail Resource)

R. Bellamy, DRP S. Barber, DRP C. Newport, DRP N. Lafferty, DRP D. Kern, DRP, SRI J. Heinly, DRP, Rl C. LaRegina, DRP, OA J. Trapp, Rl OEDO D. Bearde, DRS RidsNrrPMThreeMilelsland Resource RidsN rrDorlLpl 1 -2Resource S. Hansell, DRS J. Caruso, Chief Examiner, DRS Distribution:

DRS Master Exam File (C. Bixler) (w/concurrences)