Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML11139A00031 March 2011Lr - Pg&E/Nrc Meeting Tomorrow
TAC:ME547631 March 2011
ML11091013231 March 2011Licensee Handouts from 3/31/11 Meeting with Pacific Gas and Electric Station Seismic UpdateProbabilistic Risk Assessment
Earthquake
ML11090022531 March 2011Acceptance Review Email, Request for Exemption from Specific 10 CFR Part 73 Requirements, Extension of Deadline for ImplementationExemption Request
TAC:ME589431 March 2011
ML11091014631 March 2011Licensee Slides from 3/31/11 Meeting with Pacific Gas and Electric Company Deterministic Comparison
ML11091015731 March 2011Licensee Slides from 3/31/11 Meeting with Pacific Gas and Electric Company Change in Probabilistic Hazard
ML11102037931 March 2011Transcript of Pre-Licensing Meeting with Representatives of Pacific Gas and Electric CompanySafe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Design basis earthquake
Earthquake
DCL-11-039, Diablo Canyon Power Plant, Units 1 & 2, Decommissioning Funding Report for 201031 March 2011Diablo Canyon Power Plant, Units 1 & 2, Decommissioning Funding Report for 2010
ML11090067231 March 2011Decommissioning Funding Report for 2010
DCL-11-039, Submittal of Decommissioning Funding Report31 March 2011Submittal of Decommissioning Funding ReportFuel cladding
Fire Watch
Scaffolding
ML11060035629 March 2011Relief Request NDE-RCS-SE-2R16, Alternative to Requirements of ASME Code, Section XI, Supplement 10 as Modified by Code Case N-695, Qualification Requirements for Dissimilar Metal Piping WeldsIncorporated by reference
Dissimilar Metal Weld
ML11088041429 March 2011Lr - PG&E Response to Rai/Oi
TAC:ME593928 March 2011
DCL-11-038, License Amendment Request 11-03 Revision to Technical Specification 3.8.1, AC Sources - Operating for Traveler TSTF-163, Revision 2, and Exception to Regulatory Guide 1.9, Revision 028 March 2011License Amendment Request 11-03 Revision to Technical Specification 3.8.1, AC Sources - Operating for Traveler TSTF-163, Revision 2, and Exception to Regulatory Guide 1.9, Revision 0Safe Shutdown
Surveillance Frequency Control Program
Offsite Circuit
Overspeed trip
ML11087068228 March 2011Acceptance Review E-mail, License Amendment Request to Revise Technical Specification (TS) 3.7.1, Main Steam Safety Valves (Mssvs), to Remove a One-time Note from TS Table 3.7.1-1
DCL-11-023, Response to Summary of Telephone Conference Call Held on 02/28/2011, Between U.S. Nuclear Regulatory Commission & PG&E Co. Concerning Responses to Requests for Additional Info. for Renewal Application25 March 2011Response to Summary of Telephone Conference Call Held on 02/28/2011, Between U.S. Nuclear Regulatory Commission & PG&E Co. Concerning Responses to Requests for Additional Info. for Renewal ApplicationHydrostatic
Aging Management
Earthquake
DCL-11-036, Update Regarding the Intake Structure and Discharge Conduits Inspections25 March 2011Update Regarding the Intake Structure and Discharge Conduits Inspections
DCL-11-037, Response to Telephone Conference Calls Held on 02/02/2011 Between the NRC and PG&E Concerning Responses to Request for Additional Information Related to Diablo Plant Unit 1 and 2 License Renewal Application25 March 2011Response to Telephone Conference Calls Held on 02/02/2011 Between the NRC and PG&E Concerning Responses to Request for Additional Information Related to Diablo Plant Unit 1 and 2 License Renewal ApplicationThrough Wall Leak
Flow Induced Vibration
DCL-11-020, CFR 54.21(b) Update to the DCPP License Renewal Application25 March 2011CFR 54.21(b) Update to the DCPP License Renewal ApplicationNon-Destructive Examination
Aging Management
ML11088019225 March 2011Update Regarding the Intake Structure and Discharge Conduits Inspections
DCL-11-021, Comments on the Safety Evaluation Report with Open Items Related to License Renewal25 March 2011Comments on the Safety Evaluation Report with Open Items Related to License RenewalLicense Renewal
Fire Protection Program
Power Uprate
ML11088011825 March 201110 CFR 54.21 (B) Update to the DCPP License Renewal ApplicationNon-Destructive Examination
Aging Management
ML11088011325 March 2011Response to Summary of Telephone Conference Call Held 02/28/11, Between NRC & Pacific Gas and Electric Co. Concerning Responses to Requests for Additional Information, License Renewal ApplicationHydrostatic
Aging Management
Earthquake
TAC:ME588823 March 2011
ML11081012523 March 2011Notice of Forthcoming Preapplication Meeting with Pacific Gas and Electric Company Related to the Diablo Canyon Units 1 and 2 License Amendment Submittal Related to Transition to Risk-Informed NFPA-805Probabilistic Risk Assessment
DCL-11-029, Annual Report of Occupational Radiation Exposure for 201023 March 2011Annual Report of Occupational Radiation Exposure for 2010
ML11087012923 March 2011Protected Species Information and Maps Follow-Up E-mail
IR 05000275/201140222 March 2011IR 05000275-11-402, 05000323-11-402, on 03/03/2011 Diablo Canyon Power Plant, Units 1 & 2, Cover LetterSignificance Determination Process
Affidavit
TAC:ME604118 March 2011
ML11076011218 March 2011Notice of Meeting with Representatives of Pacific Gas and Electric Company to Discuss Pre-Application for Seismic License Amendment Request for Diablo Canyon Power Plant, Units 1 and 2Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
DCL-11-032, Request for Exemption from Specific 10 CFR Part 73 Requirements18 March 2011Request for Exemption from Specific 10 CFR Part 73 RequirementsExemption Request
ML16110A44418 March 2011Limited Appearance Statement - Julie KeitgesEarthquake
TAC:ME587017 March 2011
ML11059074917 March 2011Summary of Telephone Conference Calls Held on February 2 and 4, 2011, Btw the USNRC and Pacific Gas and Electric Company Concerning RAIs Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, LRAAging Management
Flow Induced Vibration
DCL-11-035, Supplement to Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal. and Containment Spray Systems.17 March 2011Supplement to Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal. and Containment Spray Systems.
ML11076022717 March 2011NRC Staff Projected Schedule for Completion of the Safety and Environmental Evaluations in the Matter of Diablo Canyon, Units 1 and 2
ML11080039116 March 2011G20110188/LTR-11-0127/EDATS: SECY-2011-0149 - Ltr. Barbara Boxer & Dianne Feinstein Safety of Nuclear Power Plants - Earthquake FaultsEarthquake
ML11074070115 March 2011NRC Staff Notification of Updated Hearing File Regarding Diablo Canyon Power Plant, Units 1 and 2
ML11075009115 March 2011Diablo Canyon - March Hearing File Update
DCL-11-022, Pacific Gas and Electric Company Supplements a Response to Requests for Additional Information Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application14 March 2011Pacific Gas and Electric Company Supplements a Response to Requests for Additional Information Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal ApplicationSafe Shutdown
Non-Destructive Examination
Coatings
Aging Management
PNO-IV-11-011, A; Update Diablo Canyon Power Plant Notification of Unusual Event14 March 2011PNO-IV-11-011A; Update Diablo Canyon Power Plant Notification of Unusual EventEarthquake
ML11073077914 March 2011Lr - Draft Telecon SummaryAging Management
Flow Induced Vibration
Press Release-11-043, NRC Continues to Track Earthquake and Tsunami Issues11 March 2011Press Release-11-043: NRC Continues to Track Earthquake and Tsunami IssuesEarthquake
Press Release-11-042, NRC Monitors Notice of Unusual Event at Diablo Canyon Power Plant, Tsunami Issues11 March 2011Press Release-11-042: NRC Monitors Notice of Unusual Event at Diablo Canyon Power Plant, Tsunami IssuesEarthquake
PNO-IV-11-001, Pacific Gas and Electric Company, Diablo Canyon Nuclear Plant Units 1 and 2 (03/11/2011)11 March 2011PNO-IV-11-001: Pacific Gas and Electric Company, Diablo Canyon Nuclear Plant Units 1 and 2 (03/11/2011)Earthquake
ML1106805769 March 20112011/03/09 Diablo Canyon Lr - Diablo License Renewal Follow Up Question
DCL-11-104, Attachment 9: Revision 1 to 10115-J-NPG, Diablo Canyon Power Plant Units 1 & 2 Process Protection System Replacement Controller Transfer Function Specification.9 March 2011Attachment 9: Revision 1 to 10115-J-NPG, Diablo Canyon Power Plant Units 1 & 2 Process Protection System Replacement Controller Transfer Function Specification.
ML13308B8399 March 2011Attachment 9: Revision 1 to 10115-J-NPG, Diablo Canyon Power Plant Units 1 & 2 Process Protection System Replacement Controller Transfer Function Specification.
ML16048A2147 March 20112010 Air Emission Inventory ReportCoatings