Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
TAC:ME3652 | 31 March 2011 | ||
RA-11-016, Response to Request for Additional Information Regarding Exelon Cyber Security Plan; Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island | 31 March 2011 | Response to Request for Additional Information Regarding Exelon Cyber Security Plan; Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island | Cyber Security |
RS-11-044, 2011 Report on Status of Decommissioning Funding for Reactors | 31 March 2011 | 2011 Report on Status of Decommissioning Funding for Reactors | |
ML110680051 | 24 March 2011 | Request for Additional Information Related to License Amendment Request to Revise Technical Specifications Limiting Condition for Operation 3.7.6 Main Turbine Bypass System. | Feedwater Controller Failure |
ML110871250 | 24 March 2011 | BWR Vessel and Internals Inspection Summaries for Spring 2010 Outages | Weld Overlay VT-2 Earthquake EVT-1 Dissimilar Metal Weld DM weld |
ML110760361 | 22 March 2011 | Request for Additional Information License Amendment Request for the Removal of Division 3 Alternating Current Mode Restrictions for Performing High Pressure Core Spray Emergency Diesel Generator Surveillance Testing | |
ML110670223 | 8 March 2011 | Hs/Management of Gas Accumulation IT-177 Request for Information | Ultimate heat sink Temporary Modification Flow Induced Vibration |
RS-11-031, Supplemental Information Related to License Amendment Request for Adoption of Technical Specifications Task Force-501 | 8 March 2011 | Supplemental Information Related to License Amendment Request for Adoption of Technical Specifications Task Force-501 | |
ML110700312 | 7 March 2011 | Single Positive Test Form, for Pre-Access, Collected on 01/07/2010 | |
IR 05000461/2011001 | 4 March 2011 | Annual Assessment Letter for Clinton Power Station (Report 05000461-11-001) | |
ML110550875 | 4 March 2011 | Fleet - Request for Additional Information Regarding Approval of Cyber Security Plan | Cyber Security |
ML110700311 | 3 March 2011 | Single Positive Test Form, for Followup, Collected on 01/08/2010 | |
U-604006, 2011 Clinton Power Station Initial License Examination Outline Submittal Letter | 2 March 2011 | 2011 Clinton Power Station Initial License Examination Outline Submittal Letter | |
NRC-2011-0050, Clinton, Notice of Withdrawal of Application for Amendment to Facility Operating License | 28 February 2011 | Clinton, Notice of Withdrawal of Application for Amendment to Facility Operating License | |
ML110590158 | 28 February 2011 | Notice of Withdrawal of Application for Amendment to Facility Operating License | |
ML110590197 | 28 February 2011 | Withdrawal of an Amendment Request | |
RS-11-024, Submittal of Fitness for Duty Performance Data Reports - Annual 2010 | 25 February 2011 | Submittal of Fitness for Duty Performance Data Reports - Annual 2010 | Fitness for Duty |
RS-11-023, Additional Information Related to License Amendment Request for Adoption of Technical Specifications Task Force-501 | 24 February 2011 | Additional Information Related to License Amendment Request for Adoption of Technical Specifications Task Force-501 | |
ML110700310 | 24 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 01/05/2010 | |
ML110550553 | 23 February 2011 | Re NRC Office of Investigations Report No. 3-2010-024 (AMS File No. RIII-2010-A-0032) Cover Letter Only | |
ML11118A001 | 23 February 2011 | Notice of Rule 30(b)(6) Deposition | |
ML110700306 | 22 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 08/16/2010 | |
RS-11-027, Withdrawal of Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. | 22 February 2011 | Withdrawal of Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. | |
ML110700307 | 22 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 04/19/2010 | |
ML110700309 | 22 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 01/04/2010 | |
ML110700300 | 16 February 2011 | Single Positive Test Form, for Random, Collected on 01/08/2010 | |
ML110700293 | 16 February 2011 | Single Positive Test Form, for Followup, Collected on 06/04/2010 | |
ML102380477 | 15 February 2011 | Issuance of Amendment No. 192 Technical Specification Change for the Relocation of Specific Surveillance Frequency Requirements on TSTF-425 | High Radiation Area Mission time Internal Flooding Hydrostatic Probabilistic Risk Assessment Surveillance Frequency Control Program Spiral reload Overtravel Pressure Boundary Leakage Offsite Circuit |
ML110480054 | 15 February 2011 | Notification of Potential Part 21 Reportable Condition: Crack Indications in Marathon Control Rod Blades | |
ML110460487 | 15 February 2011 | Notification of Potential Part 21 Reportable Condition Re Design Life of D and s Lattice Marathon Control Blades | |
RS-11-017, Change to the Schedule for Providing Supplemental Information Related License Amendment Request for Adoption of Technical Specifications Task Force Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume. | 3 February 2011 | Change to the Schedule for Providing Supplemental Information Related License Amendment Request for Adoption of Technical Specifications Task Force Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume. | |
RS-11-015, Response to Request for Additional Information Related to Relief Requests | 1 February 2011 | Response to Request for Additional Information Related to Relief Requests | Nondestructive Examination |
IR 05000461/2010005 | 31 January 2011 | IR 05000461-10-005, on 10/01/10 - 12/31/10, Clinton Power Station, Unit 1, Fire Protection, Other Activities | Safe Shutdown Fire Barrier Stroke time Past operability Emergency Lighting Significance Determination Process Job Performance Measure Fire Protection Program |
TAC:ME3476 | 25 January 2011 | ||
ML110210472 | 25 January 2011 | Request for Additional Information Related to Exelon Generation Company'S Request to Amendment Standby Liquid Control Technical Specifications | Safe Shutdown Enforcement Discretion |
ML110210166 | 21 January 2011 | Request for Additional Information Related to Request for Adoption of Technical Specification Task force-501 | |
ML110200608 | 20 January 2011 | E-mail Conference Call with Licensee to Clarify RAIs (Exelon) | |
ML120440106 | 20 January 2011 | Single Positive Test Form, for Pre-Access, Collected on 09/26/2011 | |
IR 05000461/2010501 | 14 January 2011 | IR 05000461-10-501, on 12/31/10, Clinton, Emergency Preparedness Annual Inspection | |
RS-11-002, Response to Request for Additional Information Regarding License Amendment Request for Adoption of Technical Specifications Task Force Traveler TSTF-501, Rev 1, Relocate Stored Fuel Oil & Lube Oil Volume Values to Licensee Control. | 6 January 2011 | Response to Request for Additional Information Regarding License Amendment Request for Adoption of Technical Specifications Task Force Traveler TSTF-501, Rev 1, Relocate Stored Fuel Oil & Lube Oil Volume Values to Licensee Control. | |
ML103630553 | 6 January 2011 | Summary of Meeting (Teleconference) with Exelon to Discuss RAI Regarding the Implementation of an Emergency Action Level Scheme Based on NEI 99-01, Rev. 5 | |
ML22216A216 | 1 January 2011 | 2 to Updated Safety Analysis Report, App. F, Fire Prot. Safe Shutdown Analysis_Redacted | Hot Short Safe Shutdown Fire Barrier Safe Shutdown Earthquake |