ML110590197

From kanterella
Jump to navigation Jump to search

Withdrawal of an Amendment Request
ML110590197
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/28/2011
From: Nicholas Difrancesco
Plant Licensing Branch III
To: Pacilio M
Exelon Generation Co
DiFrancesco N, NRR/DORL/LPL3-2, 415-1115
References
TAC ME3476
Download: ML110590197 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 28, 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 SUB~IECT:

CLINTON POWER STATION, UNIT NO.1 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. ME3476)

Dear Mr. Pacilio:

By letter dated March 3, 2010, you applied for an amendment to the Clinton Power Station, Facility Operating License No. No. NFP-62. The proposed change would have modified the facility technical specifications pertaining to standby liquid control system to extend the completion time from 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Subsequently, by letter dated February 22, 2011, you withdrew the amendment request.

The Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely,

$U~~

Nicholas DiFrancesco, Project Manager Plant Licensing Branch LPL3-2 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No.: 50-461

Enclosure:

Notice of Withdrawal cc w/encl: Distribution via Listserv

7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION CLINTON POWER STATION DOCKET NO. 50-461 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (NRC, the Commission) has granted the request of Exelon Generation Company, LLC, to withdraw its March 3, 2010 application for proposed amendment to Facility Operating License No. NPF-62 for the Clinton Power Station, Unit No.1, located in DeWitt County, Illinois.

The proposed amendment would have revised the Technical Specifications 3.1.7, to extend the completion time for Condition B (Le., two standby liquid control subsystems inoperable) from 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on May 4,2010,75 FR 23814. However, by letter dated February 22, 2011, the licensee withdrew the proposed change.

For further details with respect to this action, see the application for amendment dated March 3, 2010, and the licensee's letter dated February 22, 2011, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, Public File Room, P1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who

- 2 encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr.resource@nrc.gov.

Dated at Rockville, Maryland, this 28th day of February 28, 2011.

FOR THE NUCLEAR REGULATORY COMMISSiON

l(
~ r/L-Nicholas J. DiFrancesco, Project Manager Plant Licensing Branch 3-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

February 28, 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 SUB.JECT:

CLINTON POWER STATION, UNIT NO.1 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. ME3476)

Dear Mr. Pacilio:

By letter dated March 3, 2010, you applied for an amendment to the Clinton Power Station, Facility Operating License No. No. NFP-62. The proposed change would have modified the facility technical specifications pertaining to standby liquid control system to extend the completion time from 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Subsequently, by letter dated February 22,2011, you withdrew the amendment request.

The Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely, IRA!

Nicholas DiFrancesco, Project Manager Plant Licensing Branch LPL3-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.: 50-461

Enclosure:

Notice of Withdrawal cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC Branch Reading 'LPL3-2R1F RidsAcrsAcnw_MailCTR Resource RidsNrrDoriDpr Resource RidsRgn3MailCenter Resource RidsNrrLASRohrer Resource RidsNrrPMDiFrancesco Resource RidsOgcRp Resource RidsRgnXMailCenter Resource ADAMS Accession Nos.: PKG ML LTR (NRR-106) ML110590197 FRN (ADM-012) ML110590158 OFFICE DORULPL3-21 DORULPL3-2/PM DORULPL3-2/LA DORULPL3-2/BC NAME CNorton NDFrancesco SRohrer RCarlson DATE 2/28/11 2/28/11 2/28/11 2.128111 OFFICIAL AGENCY RECORD