Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-11-016, Response to Request for Additional Information Regarding Exelon Cyber Security Plan; Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island31 March 2011Response to Request for Additional Information Regarding Exelon Cyber Security Plan; Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile IslandCyber Security
RS-11-044, 2011 Report on Status of Decommissioning Funding for Reactors31 March 20112011 Report on Status of Decommissioning Funding for Reactors
ML11192A22331 March 2011G20110504/LTR-11-0400/EDATS: SECY-2011-0400 - Ltr. Senator Mark Kirk Nuclear Accident Notifications for Braidwood, Dresden, and LaSalle Stations
TAC:ME365231 March 2011
ML11089073730 March 2011Reply to a Notice of Violation; EA-10-220
ML11087179025 March 2011Public Meeting to Discuss 2010 End-of-Cycle Performance Assessment
ML11087191825 March 2011Notice of Meeting with Exelon, to Discuss NRC End-of-Cycle Assessment of Braidwood Station Units 1 & 2 Performance for 2010 Calendar Year
PNO-III-11-005, Braidwood Unit 2 Unusual Event Due to Loss of All Control Room Annunciators24 March 2011PNO-III-11-005, Braidwood Unit 2 Unusual Event Due to Loss of All Control Room Annunciators
ML11132A12917 March 2011Transmittal of Ihpb Safety Evaluation, Byron, Units 1 and 2, Braidwood, Units 1 and 2, License Amendment Request Regarding Low Temperature Overpressure Protection and Loss of Decay Heat RemovalStroke time
RS-11-030, ECCS Evaluation Model Error - 10 CFR 50.46 Reports15 March 2011ECCS Evaluation Model Error - 10 CFR 50.46 Reports
RS-11-019, Units 1 & 2 - License Amendment Request to Revise Technical Specifications 3.3.1, Reactor Trip System Instrumentation, & TS 3.3.2, Engineered Safety Feature Actuation System Instrumentation, to Reflect Installation of Bypass.14 March 2011Units 1 & 2 - License Amendment Request to Revise Technical Specifications 3.3.1, Reactor Trip System Instrumentation, & TS 3.3.2, Engineered Safety Feature Actuation System Instrumentation, to Reflect Installation of Bypass.
TAC:ME583614 March 2011
ML11342011014 March 20112011 Braidwood Station Initial Examination Outline SubmittalBoric Acid
ML1106908167 March 2011Single Positive Test Form, for Cause, Collected on 08/24/2010
ML1106908177 March 2011Single Positive Test Form, for Random, Collected on 04/21/2010
ML1106700767 March 2011Retraction of Licensee Event Report 2010-002-00 - Containment Spray Pump Suction Valve Failed to Close Resulting in an Unanalyzed Plant Condition Due to Procedure ErrorUnanalyzed Condition
ML1106200624 March 2011EOC Annual Assessment Letter and Inspection/Activity Plan
ML1105508754 March 2011Fleet - Request for Additional Information Regarding Approval of Cyber Security PlanCyber Security
ML1105909213 March 2011Relief Request from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration WeldsHigh Radiation Area
Incorporated by reference
TAC:ME65872 March 2011
ML1106200892 March 2011Response to NRC Verification Inspection Report; 05000456/2011009; 05000457/2011009
ML11076008928 February 2011WCAP-17349-NP, Revision 1, Bypass Test Instrumentation for Byron and Braidwood, Units 1 and 2, Attachment 8 to RS-11-019Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML11060090328 February 2011IR 05000456-10-503, 05000457-10-503; on 06/16/2010 - 02/10/2011; Braidwood Station, Units 1 & 2; Results of NRC Emergency Action Level and Emergency Plan Changes Inspection and Follow-up of Unresolved Item 05000456-09-005-07; 05000457-09-00Significance Determination Process
RS-11-024, Submittal of Fitness for Duty Performance Data Reports - Annual 201025 February 2011Submittal of Fitness for Duty Performance Data Reports - Annual 2010Fitness for Duty
ML11069081525 February 2011Single Positive Test Form, for Cause, Collected on 10/04/2010
ML11069081224 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/22/2010
ML11069080324 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/20/2010
ML11007015324 February 2011Issuance of Amendment Technical Specification Change for the Relocation of Specific Surveillance Frequency Requirements Based on TSTF-425Shutdown Margin
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Hydrostatic
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Recently irradiated fuel
Backfit
Power change
ML11285A07224 February 2011Annual Reporting Form for Drug and Alcohol Tests for Period Ending 2010
ML11054072323 February 20112/23/11 Ltr to A. Shahkarami Re Participation in Commission Meeting on 50.46a Risk-informed Emergency Core Cooling System Rule on 3/24/11
ML11054072423 February 20112/23/11 Ltr to F. Schiffley Re Participation in Commission Meeting on 50.46a Risk-informed Emergency Core Cooling System Rule on 3/24/11
ML11070055922 February 2011Corporate - Exelon, Single Positive Test Form, for Random, Collected on 06/21/2010
ML11069081417 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/29/2010
ML11069081117 February 2011Single Positive Test Form, for Pre-Access, Collected on 07/12/2010
ML11069079916 February 2011Single Positive Test Form, for Random, Collected on 04/09/2010
ML11053029516 February 2011Information Request LTR- to Support Upcoming Inspection of Preoperational Testing of an Independent Spent Fuel Storage InstallationSafe Shutdown
Tornado Generated Missile
Control of Heavy Loads
ML11069080116 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/20/2010
ML11069080216 February 2011Single Positive Test Form, for Followup, Collected on 05/03/2010
ML11069080416 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/07/2010
ML11069080516 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/01/2010
ML11069080616 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/30/2010
ML11069080716 February 2011Single Positive Test Form, for Pre-Access, Collected on 06/01/2010
ML11069081016 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/29/2010
ML11069080816 February 2011Single Positive Test Form, for Pre-Access, Collected on 09/27/2010
ML11069080916 February 2011Single Positive Test Form, for Random, Collected on 07/20/2010
ML11046049914 February 2011Ltr. 02/14/2011 Braidwood Re Confirmation of Initial License Examination
RS-11-018, Units 1 & 2 - Change of Schedule and Notice of Intent to Pursue License Renewal11 February 2011Units 1 & 2 - Change of Schedule and Notice of Intent to Pursue License Renewal
ML1100502529 February 2011Memo to Chairman Jaczko Fm R. W. Borchardt, EDO Initiatives for Improved Communication of Groundwater Incidents
IR 05000456/20100058 February 2011IR 05000456-10-005, 05000457-10-005, on 10/01/2010 - 12/31/2010; Braidwood Station, Units 1 & 2; Fire Protection; Identification and Resolution of Problems; Followup of EventsSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
High Radiation Area
Non-Destructive Examination
Fire Barrier
Water Inventory Control
Weld Overlay
Past operability
Probabilistic Risk Assessment
Anchor Darling
Nondestructive Examination
Temporary Modification
Significance Determination Process
Job Performance Measure
Breakaway torque
Exemption Request
Maintenance Rule Program
Pressure Boundary Leakage
Pressure boundary leak
Fire Protection Program
Fire Watch
Unidentified leak
Power Uprate
ML1103505124 February 2011Inservice Inspection Summary ReportBoric Acid
Packing leak
Weld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Moisture barrier
Liquid penetrant
Dissimilar Metal Weld