Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML073620057 | 27 December 2007 | Summary of Meeting with Omaha Public Power District to Discuss Performance at Fort Calhoun Station & Status of Station Performance Improvement Plan | |
ML073390372 | 18 December 2007 | Request for Withholding Information from Public Disclosure Containment Spray System Actuation Logic (Tac No. MD6204) | |
TAC:MD5577 | 18 December 2007 | ||
ML073310028 | 17 December 2007 | Project Manager Assignment from Alan Wang to Michael Markley | |
ML073090361 | 17 December 2007 | Issuance of Amendment No. 251, Modify Technical Specification Requirements to Support Addition of Safety-Related Swing Inverters to 120 Volt AC Buses | |
LIC-07-0104, Revision to Technical Evaluation of Fort Calhoun Station, Unit No. 1, License Amendment Request, Modification of Surveillance Requirements for Emergency Mode (Remotely Operated) Dampers in Containment Air Cooling and Filtering System. | 12 December 2007 | Revision to Technical Evaluation of Fort Calhoun Station, Unit No. 1, License Amendment Request, Modification of Surveillance Requirements for Emergency Mode (Remotely Operated) Dampers in Containment Air Cooling and Filtering System. | |
Press Release-IV-07-044, NRC Finalizes White Finding for Fort Calhoun Nuclear Plant | 10 December 2007 | Press Release-IV-07-044: NRC Finalizes White Finding for Fort Calhoun Nuclear Plant | |
IR 05000285/2007011 | 7 December 2007 | EA-07-194, Omaha Public Power District, Fort Calhoun Station - Final Significance Determination for a White Finding and Notice of Violation, NRC IR 05000285-07-011 | High winds Internal Flooding Probabilistic Risk Assessment Condition Adverse to Quality Significance Determination Process |
ML073410172 | 6 December 2007 | Notice of Category 1 Meeting with Omaha Public Power District to Discuss Current Improvement Plan Action Matrix Status and Preparations for Upcoming 95002 Inspection | |
ML073380181 | 4 December 2007 | EN-07-067 - Omaha Public Power District, Fort Calhoun Station | Condition Adverse to Quality Significance Determination Process |
TAC:MD6999 | 28 November 2007 | ||
ML072890025 | 28 November 2007 | Audit of the Licensee'S Management of Regulatory Commitments | |
IR 05000285/2007201 | 19 November 2007 | IR 05000285-07-201, on 10/25/2007, Fort Calhoun Station - Security Inspection | |
LIC-07-0100, Change of Primary Addressee Information | 19 November 2007 | Change of Primary Addressee Information | |
ML073210005 | 16 November 2007 | Summary of Regulatory Conference with Omaha Public Power District to Discuss Apparent Violations Identified in NRC Inspection Report 05000285/2007011 | |
IR 05000285/2007004 | 13 November 2007 | IR 05000285-07-004; 07/01/2007- 09/30/2007; Fort Calhoun Station, Integrated Resident and Regional Report, Identification and Resolution of Problems | High winds Temporary Modification Condition Adverse to Quality Significance Determination Process Operability Determination |
ML073200086 | 9 November 2007 | Notification of Potential Part 21 Report Conval Valves Weld Qualifications | |
Press Release-IV-07-041, - NRC to Hold Regulatory Conference with Omaha Public Power District on Fort Calhoun Nuclear Plant | 1 November 2007 | Press Release-IV-07-041 - NRC to Hold Regulatory Conference with Omaha Public Power District on Fort Calhoun Nuclear Plant | |
ML072960170 | 31 October 2007 | Public Meeting Summary on the Reactor Oversight Process | Time of Discovery Mission time Probabilistic Risk Assessment Zebra Mussel Significance Determination Process Maintenance Rule Program Power change Downpower |
ML072980136 | 31 October 2007 | (Public) Distribution of Revision 2 of the Nrc'S Significance Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables | Significance Determination Process |
ML072960690 | 31 October 2007 | Proposed Changes to Public Radiation Safety SDP | |
IR 05000285/2007010 | 26 October 2007 | IR 05000285-07-010; on 08/27/2007 - 09/14/2007; Omaha Public Power District; Fort Calhoun Station, Biennial Inspection of the Identification and Resolution of Problems | Time of Discovery High winds Condition Adverse to Quality Significance Determination Process Operability Determination Earthquake Operability Assessment |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
ML072980714 | 25 October 2007 | Notice of Regulatory Conference with Omaha Public Power District to Discuss Significance, Causes, & Corrective Actions Associated with Two Apparent Violations Involving Improper Electrical Maintenance Activities on Emergency Diesel Generato | |
ML072980670 | 24 October 2007 | Meeting Presentation on GEH Chemical Effects Testing Update | |
ML072950271 | 19 October 2007 | OI 4-2007-014 Omaha Public Power District (Ft. Calhoun Station), Closure of Investigation, 10/19/2007 | |
ML072820307 | 11 October 2007 | Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists | |
ML072890802 | 11 October 2007 | Summary of Public Meeting with Omaha Public Power District to Discuss Performance at Fort Calhoun and the Status of the Station Performance Improvement Plan | |
ML072840428 | 10 October 2007 | IR 05000285-07-011, on 02/14/2007 - 09/18/2007; Fort Calhoun Station, Resident Report; Postmaintenance Testing, Identification and Resolution of Problems | Hot Short Safe Shutdown Functionality Assessment Condition Adverse to Quality Significance Determination Process Large early release frequency |
ML072780050 | 9 October 2007 | Ltr R T Ridenoure, Omaha Public Power Dist., Fort Calhoun Station, Unit No. 1 Contingency Plan to Use Light Weight Transfer Cask in a 2009 Dry Cask Storage Campaign (Docket 72-54 & 50-285) | Exemption Request |
LIC-07-0091, Cancellation of Licensee Event Report 2006-007 for the Fort Calhoun Station | 5 October 2007 | Cancellation of Licensee Event Report 2006-007 for the Fort Calhoun Station | Earthquake |
LIC-07-0089, NRC Inspection Report 05000285/2007007, Reply to a Notice of Deviation | 5 October 2007 | NRC Inspection Report 05000285/2007007, Reply to a Notice of Deviation | |
LIC-07-0084, License Amendment Request, Change to Diesel Generator Surveillance Testing. | 5 October 2007 | License Amendment Request, Change to Diesel Generator Surveillance Testing. | |
ML072540833 | 27 September 2007 | Unit #1 - Letter and Notice of Denial of Amendment Request Appendix K Measurement Uncertainty Recapture Power Uprate | |
ML072670001 | 25 September 2007 | Notice of Forthcoming Closed Meeting with Omaha Public Power District (OPPD) to Discuss a New Approach for a Measurement Uncertainty Update | |
ML072530614 | 21 September 2007 | Public Meeting Summary on the Reactor Oversight Process | Time of Discovery Enforcement Discretion Significance Determination Process Backfit Power change |
IR 05000285/2007403 | 19 September 2007 | IR 05000285-07-403; 08/20/2007 - 08/23/2007; Fort Calhoun Station; Security Baseline Inspection - Letter Only | Affidavit |
ML072560776 | 13 September 2007 | Notice of Public Meeting with Omaha Public Power District to Discuss Performance at Fort Calhoun, Unit 1 and Improvement Plan Status | |
LIC-07-0082, License Amendment Request (LAR) Permanent Use of Sodium Tetraborate as the Containment Building Sump Buffering Agent. | 11 September 2007 | License Amendment Request (LAR) Permanent Use of Sodium Tetraborate as the Containment Building Sump Buffering Agent. | Boric Acid Probabilistic Risk Assessment |
IR 05000285/2007007 | 7 September 2007 | IR 05000285-07-007, on 05/14 Through 07/25/2007, Fort Calhoun Station; Component Design Basis Inspection | Unanalyzed Condition Ultimate heat sink Probabilistic Risk Assessment Significance Determination Process Operability Determination Operability Assessment |
LIC-07-0083, Response to Request for Additional Information for License Amendment Request (Lar), Modification of the Containment Spray System Actuation Logic. | 31 August 2007 | Response to Request for Additional Information for License Amendment Request (Lar), Modification of the Containment Spray System Actuation Logic. | GOTHIC |
ML072430778 | 31 August 2007 | Mid-cycle Performance Review and Inspection Plan - Fort Calhoun Station | |
Press Release-IV-07-031, - NRC Names New Resident Inspector at Fort Calhoun Nuclear Plant | 27 August 2007 | Press Release-IV-07-031 - NRC Names New Resident Inspector at Fort Calhoun Nuclear Plant | New Resident Inspector |
ML072360322 | 23 August 2007 | FCS NOV Response 08/23/2007 | |
ML072320256 | 20 August 2007 | Notice of Meeting with Omaha Public Power District (OPPD) to Discuss the Transfer of Six More Spent Fuel Canisters to the Fort Calhoun Station ISFSI Using a Light-Weight Transfer Cask | |
TAC:L24114 | 20 August 2007 | ||
LIC-07-0078, Fitness-for-Duty Program Performance Data Report for January 2007 Through June 2007 | 14 August 2007 | Fitness-for-Duty Program Performance Data Report for January 2007 Through June 2007 | Fitness for Duty |
IR 05000285/2007003 | 14 August 2007 | IR 05000285-07-003; 04/01- 06/30/2007; Fort Calhoun Station, Integrated Resident and Regional Report; Access Control to Radiololgically Significant Areas | Safe Shutdown High winds High Radiation Area Fire Barrier Internal Flooding Probabilistic Risk Assessment Locked High Radiation Area Significance Determination Process Earthquake Biofouling Substantial potential for overexposure Overexposure |
LIC-07-0077, Response to RIS 2007-17, Preparation and Scheduling of Operator Licensing Examinations | 9 August 2007 | Response to RIS 2007-17, Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
ML072180599 | 3 August 2007 | Response to Notice of Violation and NRC IR 05000285-07-009 |