ML07009017428 December 2006NRC Region 1 Annual GFE Notification Letter to Multiple Addressees Dtd 12/28/06Generic Fundamentals Examination
ML06346025821 December 2006Alternative Approach for Responding to the Nuclear Regulatory Commission Request for Additional Information Letter Regarding Generic Letter 2004-02 (Docket Nos.: See Enclosure)
ML06362012421 December 2006Reactor Pressure Vessel Head InspectionBoric Acid
Pressure Boundary Leakage
Pressure boundary leak
ML06333059421 December 2006R. E. Ginna Nuclear Power Plant - Approval of Common Quality Assurance ProgramNondestructive Examination
Condition Adverse to Quality
Fire Protection Program
Grace period
TAC:MD344019 December 2006
ML06353036818 December 2006Scan Letter to M. Korsnick Dated December 18, 2006 Re Administrative Change to Facility Operating License in Conjunction with Commission Order EA-06-037 and Revisions to Physical Security Plan, Training and Qualification Plan and Safeguards
ML06353045014 December 2006R. E. Ginna, Change to Common Quality Assurance ProgramNondestructive Examination
ML06352052814 December 2006FOIA/PA-2007-0014 - Resp 2 - Final
ML06347059914 December 2006Plant Service List
ML06352013114 December 2006Scientech LLC, Report 10 CFR Part 21 of Defect
ML06339005113 December 2006Request for Additional Information, Regarding Service Water Pump Operability Requirements,Probabilistic Risk Assessment
Large early release frequency
ML06346044013 December 2006Response Date for Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (TAC Nos. MD0947 Through MD1050)
ML0634800857 December 2006Addendum to September 29, 2006 Submittal Change to Technical Specification 3.7.8 Service Water (SW) from an Electrical Train Based to a Pump Based Specification
ML0633803175 December 2006Enclosure 1 - Addressee List
TAC:MD09615 December 2006
ML06313004521 November 2006Response to Bulletin (Bl) 2005-02, Emergency Preparedness and Response Actions for Security-Based Events for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, R.E. Ginna Nuclear Power Plant, and Nine Mile Point Nuclear TAC Nos. MC7844,
TAC:MC780321 November 2006
TAC:MD22299 November 2006
ML0631802283 November 2006Revised Information Associated with License Amendment Request: Technical Specification Improvement Regarding Steam Generator Tube Integrity Using Consolidated Line Item Improvement Process
ML0631802263 November 2006Transmittal of Core Operating Limits ReportShutdown Margin
TAC:MD00813 November 2006
ML0631902313 November 2006R. E. Ginna Response to RIS 2006-15 Preparation and Scheduling of Operator License ExaminationsGeneric Fundamentals Examination
IR 05000244/20060083 November 2006(SGI) IR 05000244/2006008; 09/18/2006 - 09/21/2006; R.E. Ginna Nuclear Power Plant, Physical ProtectionAffidavit
IR 05000244/200600431 October 2006IR 05000244-06-004 on 07/01/2006 Through 09/30/2006; R.E. Ginna Nuclear Power PlantTime of Discovery
Fire Barrier
Post Accident Monitoring
Enforcement Discretion
Temporary Modification
Significance Determination Process
Operability Determination
Through-Wall Leak
Fire Protection Program
Operability Assessment
Power Uprate
ML06303002724 October 2006R. E. Ginna - Response to Request for Information License Amendment Request: Emergency Core Cooling System (ECCS) Accumulator Boron Concentration Verification Frequency
IR 05000244/200600615 October 2006IR 05000244-06-006, on 08/14-31/2006, R.E. Ginna Nuclear Power Plant, LLCUnanalyzed Condition
Post Accident Monitoring
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Pressure Boundary Leakage
Fire Protection Program
Scaffolding
ML06328019213 October 2006Letter Dated 10/13/06 to Multiple Addressees Who Did Not Participate in the 09/06/06 Generic Fundamentals Exam (GFE)Generic Fundamentals Examination
ML06291013212 October 2006License Amendment Request: Spent Fuel Pool Storage Capacity
ML0628900599 October 2006Response to Request for Additional Information Regarding Common Quality Assurance Program
ML0626900084 October 2006Approval of Extension Request for Completion of Corrective Actions in Response to Generic Letter 2004-02
ML06278022129 September 2006License Amendment Request: Change to Technical Specification 3.7.8, Service Water (SW) from an Electrical Train Based on a Pump Based SpecificationHigh Radiation Area
Mission time
Probabilistic Risk Assessment
Large early release frequency
Severe Accident Management Guideline
Maintenance Rule Program
IR 05000244/200601029 September 2006IR 05000244-06-010; R. E. Ginna Nuclear Power Plant; Ti 2515/128Affidavit
IR 05000244/200630127 September 2006IR 05000244-06-301, Constellation Generation, 09/01/2006, 08/28-30/2006, 08/29/2006, Through 09/08/2006, R.E. Ginna Nuclear Power Plant
ML06251042927 September 2006Final Ginna Exam Aug. 2006 - Section C Operating Exam (Folder 3)Boric Acid
ML06251042427 September 2006Final Ginna Exam Aug. 2006 - Section a Operating Exam (Folder 3)Job Performance Measure
ML06251042627 September 2006Final Ginna Exam Aug. 2006 - Section B Operating Exam (Folder 3)Boric Acid
Job Performance Measure
ML06268016627 September 2006Aug. 2006 Exam, NRC Comments on Draft Licensee-Developed Exam (Written & Operating Tests) (Folder2)
ML06251041327 September 2006Final Ginna Exam Aug. 2006 - Outlines (Folder 3)Fuel cladding
ML06251041927 September 2006Final Ginna Exam Aug. 2006 - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3)Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Stroke time
Post Accident Monitoring
Temporary Modification
Fuel cladding
ML06272006119 September 2006R.E. Ginna Modification of Commitment to Perform Bare Metal Inspection of Reactor Lower Head Bottom Mounted Instrumentation Nozzles in Accordance with NRC Bulletin 2003-02Boric Acid
Probabilistic Risk Assessment
ML06290024715 September 2006NRC Final Results Ltr. Re Ginna Exam W/O Encl. Dtd 9/15/06
ML06290046511 September 2006Final Qa/ Related Forms (Folder 1)Job Performance Measure
ML0625505211 September 2006R. E. Ginna Nuclear Power Plants - Response to Request for Additional Information Regarding Common Quality Assurance ProgramFitness for Duty
Shutdown Margin
Non-Destructive Examination
Offsite Dose Calculation Manual
Commercial Grade Dedication
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Process Control Program
Fire Protection Program
Grace period
TAC:MD068631 August 2006
ML06243049631 August 2006Mid-Cycle Performance Review and Inspection Plan - R. E. Ginna Nuclear Power Plant
ML06242014731 August 2006R. E. Ginna Nuclear Power Plant, RAI Regarding Test Frequency for Accumulator Boron Concentration,
ML06258036629 August 2006IR 05000244-06-006, Ginna Inspection Requests and Summaries for Ri&R Inspection
ML06251017825 August 2006Fitness for Duty Program Performance Data ReportFitness for Duty
ML06233023721 August 2006Operator Licensing Examination Approval (R.E. Ginna Nuclear Power Plant)
ML06216057417 August 2006R. E. Ginna Nuclear Power Plant - Review of Steam Generator Tube Inspection Summary Report for the Spring 2005 Outage