IR 05000244-06-010; R. E. Ginna Nuclear Power Plant; Ti 2515/128
ML062750275
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/29/2006
From: Brian Mcdermott
Reactor Projects Branch 1
To: Korsnick M
Rochester Gas & Electric Corp
References
IR-06-010
Download: ML062750275 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 29, 2006

SUBJECT:

R. E. GINNA NUCLEAR POWER PLANT, LLC - NRC INSPECTION REPORT 05000244/2006010

Dear Mrs. Korsnick:

On September 14, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your R. E. Ginna Nuclear Power Plant, LLC. The enclosed inspection report documents the inspection results, which were discussed on September 20, 2006 with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

WARNING: Violation of Section 147, Safeguards Safeguards information determination made by:

Information, of the Atomic Agency Act is subject to Name/Title Barry C.Westreich, Chief civil and criminal penalties. Organization NSIR/DNS/SOS Basis 2/25/02 NRC Order Signature /RA/

Date 05/12/06 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Sincerely,

/RA/ Arthur Burritt, Acting, signed for Brian J. McDermott Projects Branch 1 Division of Reactor Projects Docket No. 50-244 License No. DPR-18 Enclosure: NRC Inspection Report 05000244/2006010 ( )

cc w/o encl:

D Holm, Plant General Manager R. Randall, Director of Licensing cc w/encl; w/SGI:

R. Teed, Supervisor, Nuclear Security J. Spath, State Liaison Officer/Program Director, New York State Energy Research and Development Authority F. Tabert, State Homeland Security Advisor, State of New York