ML062510426

From kanterella
Jump to navigation Jump to search
Final Ginna Exam Aug. 2006 - Section B Operating Exam (Folder 3)
ML062510426
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/27/2006
From:
Ginna
To: Todd Fish
Operations Branch I
Sykes, Marvin D.
References
Download: ML062510426 (77)


Text

I I I 2-Aug-2006 Job Performance Measure Exam Page:

It JPM NO JRO01.013 Realign a misaligned RCC Revision #: 1 Review Date: 7/18/2006 Location: Simulator Estimated Time (minutes): 15.00 Candidate:

Evaluator:

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

I 1 I 2-Aug-2006 Job Performance Measure Exam Page:

2I

4.

NOTE THE EVALUATORWILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATORWILL BE TAKING NOTES. ASK FOR CLARIFICATIONOF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

During a Plant Load reduction it was determined that Rod C-7 was not moving and was misaligned by > 12 steps with respect to it's bank. The operators entered AP-RCC.2 RCCRPI Malfunction and were directed to ER-RCC.2 restoring a Misaligned RCC. The Initial Actions of ER-RCC.2 are complete up to step 4.1.6. The cause of the misalignment was a blown fuse which is repaired.

Initiating Cues :

L-_, Realign Rod C-7 per ER-RCC.2 section 4.2. An Instructor will act as CO to adjust Turbine load to control Tave as directed by the procedure and will respond to any condition not related to the rod realignment. An I&C Tech is avalible in the relay room to perform any action required there.

I 2-Au~-2006 Page: 3 Job Performance Measure Exam

'd

Description:

Restore a Misaligned RCCA JPM Tasks Task ID: 00 1-019-04-01A Task Standards :

In accordance with the procedure Tools :

Terminating Cues Task Completion Trainee States Task is Completed References :

ID DescriDtion Review Date Ref Flag PRER ER-RCC.2 RESTORING A MISALIGNED RCC Safety Considerations Consequences of Inadequate Performance:

Core design limit challenge Thermal design limit challenge General Comments :

Simulator Setup: Start at any at power IC (100%). Reduce load to <75% at 2%/min. At 80% power insert MALF ROD3 for Rod C-7. Decrease load until <75% and >12 steps misaligned on Rod C-7.

Place Rods in Manual and adjust turbine load to maintain Tave at Tref. Clear MALF ROD3.

1 I Page:

Job Performance Measure Exam 4 1 v

Performance Checklist 1 Element : Conditions : Standards :

Review ER-RCC.2 Same as element Comments :

Satisfactory Unsatisfactory 0 2 Element : Conditions : Standards :

Align Step counter Locate CBD Group 1&2step counters. Verify they are equal. If Not then step Rods out 1/2 step.

Comments :

Satisfactory Unsatisfactory 0 2 Element : Conditions : Standards :

\- --- ~

- Record Step Count Records CBD step count for later reference.

Comments :

Satisfactory Unsatisfactory 0

  • 4 Element : CRITICAL Conditions : Standards :

Place Rod Selector Switch to the Locate Selector Switch and affected Bank place to the CBD position Comments :

Satisfactory Unsatisfactory 0 5 Element : Conditions : Standards :

Notifl I&C to switch P/A Same as element converter to the Bank D poition and record reading Comments :

Satisfactory 0 Unsatisfactory 0

-=.---

  • 6 Element: CRITICAL Conditions : Standards :

Disconnect a lift coils for the Locate Lift Coil Disconnects.

affected bank except for the Disconnect all Bank D Rods misaligned rod except for C-7

2-Aug-2006 Page: 5 Job Performance Measure Exam Comments :

Satisfactory Unsatisfactory 0

  • 7 Element : CRITICAL Conditions : Standards :

Insert affected RCC to one MRPI Note: Rod Control Urgent Failure Locate the IrdOutIHold tranistion below the Bank position will Come in . This is an expected switch. Insert C-7 till MRPI alarm for C-7 tranistion to one below the rest of bank D.

Stop as soon as the tranistion is made.

Comments :

Satisfactory Unsatisfactory

  • 8 Element : CRITICAL Conditions : Standards :

Reconnect all Bank Lift Coils Reconnects all Lift Coils for D Bank Comments :

Satisfactory 0 Unsatisfactory 0

  • 9 Element : CRITICAL Conditions : Standards :

Disconnect Lift Coil for the Disconnect the Lift Coil for affected Rod c-7 Comments :

Satisfactory 0 Unsatisfactory 0 10 Element : Conditions : Standards :

Reset the Urgent Failure Alarm Locate and dpress the alarm reset pushbutton Comments :

Satisfactory Unsatisfactory

  • 11 Element : CRITICAL Conditions : Standards :

Insert the affected Bank to the Locate the In/Out/Hold same MRPI tranistion as the switch. Insert bank till MRPI

--- affected Rod. tranistion to the same value as Rod C-7. Stop as soon as the tranistion is made.

I 1 I 2-Au~-2006 Job Performance Measure Exam Page:

Comments :

Satisfactory 0 Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Reconnect the affected Rod Lift Reconnect the Lift Coil for Coil c-7 Comments :

~~

Satisfactory

~~

n Unsatisfactory 0 Element : Conditions : Standards :

Reset Step Counter for the Locates counter and reset rod affected group to match the position unaffected group position Comments :

Satisfactory n Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Withdraw Bank to position Locate the In/Out/Hold recorded in step 4.2.2 switch. Withdraw Bank D to the poition previously recorded. Add Boron as necessary for temperature control Comments :

SatAactory n L asatisfactory 0 Element : Conditions : Standards :

Notifty I&C to reset P/A CUE: No further actions Same as element converter.

Comments :

Satisfactory 0 Unsatisfactory 0

I 1 2-Au~-2006 Page:

Job Performance Measure Exam 71

\$M Questions Question Answer References Reference Type Reference ID Description Ref Flag

I 2-Au~-2006 Job Performance Measure Exam Page:

II

.u JPM NO JR004.012 Burp the VCT to Remove H2 Prior to a Shutdown (Option 1 normal, Option 2 N2 Regulator Set Incorrectly)

Revision #: 1 Review Date: 7/18/2006 Location: Simulator Estimated Time (minutes): 20.00 Candidate:

Evaluator:

L-Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

2-A ~ g -006 2

Job Performance Measure Exam Page:

l/

' d NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATORWILL BE TAKING NOTES. ASK FOR CLARIFICATIONOF JPM REQUIREMENTSPRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The plant is preparing for a shutdown to replace a Hot leg RTD. Letdown has been increased to 60 gpm to increase RCS cleanup rate.

Initiating: Cues :

You have been directed to Burp the VCT to remove H2 per S-3.3C "H2 or 0 2 removal from the primary system by burping the VCT with N2". Local lineups per Section 5.1 are complete. It is not desired to use the 60 gpm orifice. A NLO is standing by to perform local actions. Current

.L.--RCSCBis I PPm.

2-A ~ g -006 2 Page:

Job Performance Measure Exam 3 1

--4

Description:

Nitrogen Purge The Volume Control Tank (JPM JR004.012)

JPM Tasks Task ID: 004-008-01-01 Task Standards :

ALIGN N2 to VCT, complete one burp.

Tools :

Terminating: Cues Task Completion References :

-ID Description Review Date Ref Flag L--

PRO 0-2.2 PLANT SHUTDOWN FROM HOT 0 SHUTDOWN TO COLD CONDITIONS PRS s-3.3c H2 OR 0 2 REMOVAL FROM PRIMARY SYSTEM BY BURPING VOLUME CONTROL TANK WITH N2 Safetv Considerations Consequences of Inadequate Performance:

General Comments :

Setup simulator at any at power I-C.

Record RCS Boron Concentration in the initiating cue Option 2 Set N2 Regulator to 14.7 psi LOA CVCGO When called to secure H2 to VCT set LOA CVC 59 to 14.7 When called to check N2 to VCT set LOA CVC 60 to 35psi.

- - Place 60 GPM letdown in service.

\---

I 1 2-Au~-2006

~

Job Performance Measure Exam Page:

7 d

Performance Checklist 1 Element : Conditions : Standards :

Review S-3.3C. Reviews cautions and completed steps.

Comments :

Satisfactory 0 Unsatisfactory 0

  • 2 Element : CRITICAL Conditions : Standards :

Notify NLO to isolate H2 and N2 Calls A 0 and instructs 261 to VCT. and 262 to be closed.

Comments :

Satisfactory n ' Unsatisfactory 0 3 Element : Conditions : Standards :

Record VCT press. Locate meterhecord pressure.

\-'

Comments :

Satisfactory Unsatisfactory 0

  • 4 Element : CRITICAL Conditions : Standards :

Place 112A to VCT position. Locate switch. Place to 112c.

Comments :

Satisfactory 0 Unsatisfactory 0

  • 5 Element : CRITICAL Conditions : Standards :

As VCT pressure increases to - Locates AOV-258 switch 15-20 psi higher then the recorded opedcloses 258 to maintain value from step 5.3.3, open pressure.

AOV-258. Close 258 when press

- 5 psi higher than recorded value.

Comments :

u' Satisfactory Unsatisfactory 0

~~

6 Element : Conditions : Standards :

Determine required Boric Acid Obtain blend rate from PPCS.

blend rate.

2-Aug-2006 Page: 5 Job Performance Measure Exam

  • W Comments :

Satisfactory Unsatisfactory 0

  • 7 Element : CRITICAL Conditions : Standards :

Open AOV-1 1OC RMW to VCT. Locate switch. Place to open.

Comments :

Satisfactory 0 Unsatisfactory

  • 8 Element: CRITICAL Conditions : Standards :

Place RMW Mode to Borate. Locate switch. Place to borate.

Comments :

Satisfactory n Unsatisfactory 0

,. Element : Conditions : Standards :

.___. . Set Boric Acid integrate to Set to value so that BA does sufficient value. not stop prior to 85% in VCT.

Comments :

Satisfactory Unsatisfactory 0

  • 10 Element: CRITICAL Conditions : Standards :

Adjust HCV-11OA and HCV-111 Locate control and adjust as to value in step 5.3.5.3.1 necessary to match values.

Comments :

Satisfactory Unsatisfactory 0

  • 11 Element: CRITICAL Conditions : Standards :

Open HCV- 111. Locate valve. Place to open.

Comments :

Satisfactory Unsatisfactory 0

-2 Element: CRITICAL Conditions : Standards :

Start a RMW pump. Locate switch. Start pump.

2-Au~-2006 Page:

Job Performance Measure Exam d) ij Comments :

Satisfactory 0 Unsatisfactory 0

  • 13 Element : CRITICAL Conditions : Standards :

Place RMW control to start. (NOTE: As level increases, the Locate switch. Place to start.

operator vents the VCT per step 5 Verify BA pump starts.

ofthe JPM.)

Comments :

Satisfactory Unsatisfactory

  • 14 Element : CRITICAL Conditions : Standards :

When level greater than or equal Locates controls. Place to 85% stop boration and RMW. RMW control to stop. Stop RMW pump.

Comments :

Satisfactory 0 Unsatisfactory c]

.i , --

15 Element : Conditions : Standards :

Place RMW control to stop, stop Locate switches. Place in RMW pump. stop.

Comments :

Satisfactory 0 Unsatisfactory 0 16 Element : Conditions : Standards :

Place AOV-1 1OC to Auto. Locate switch. Place in auto.

Comments :

Satisfactory Unsatisfactory 0

~~~

17 Element : Conditions : Standards :

Place HCV-111 to Auto. Locate switch. Place in auto.

Comments :

.~ Satisfactory Unsatisfactory 0 18 Element : Conditions : Standards :

Lineup RMW for Auto Operation RMW mode to Auto RMW control to start

2-A ~ g -006 2 Page: 7 Job Performanee Measure Exam v'

Comments :

Satisfactory Unsatisfactory 0 19 Element : Conditions : Standards :

Verify VCT vent closed AOV-258 CUE: Pressure Burping is not Locate switch. Verifj desired. position or close.

Comments :

Satisfactory Unsatisfactory 0 20 Element : Conditions : Standards :

N/A Section 5.3.7 Comments :

Satisfactory Unsatisfactory

  • ?1 Element : CRITICAL Conditions : Standards :

.---- Dispatch NLO to open N2 Calls NLO.

Regulator outlet 262.

Comments :

Satisfactory 0 Unsatisfactory 0

  • 22 Element : CRITICAL Conditions : Standards :

Place LCV- 1 12A in HUT NOTE: Option 1 go to step 26. Locate control. Place switch position. in HUT position.

Comments :

Satisfactory n Unsatisfactory 0

  • 23 Element : CRITICAL Conditions : Standards :

Option 2 Monitors pressure when < 15 When pressure drops below 15 psi places 1 12A in VCT psi, stop diverting water. position.

Comments :

Satisfactory Unsatisfactory 0

I 2-A ~ g -006 2 Job Performance Measure Exam Page: 8

'd:

24 Element : Conditions : Standards :

Notify NLO to check N2 regulator CUE: No further actions Call NLO to check N2 lineup. regulator. NLO adjusts N2 regulator.

Comments :

Satisfactory 0 Unsatisfactory 0 JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag

I I 2-Aug-2006 Page:

Job Performance Measure Exam

-d JPM NO JR006.002 Nitrogen Makeup to Accumulator Revision #: 8 Review Date: 7118/2006 Location: Simulator Estimated Time (minutes): 30.00 Candidate:

Evaluator:

LJ Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

, 1 2-Aiig-2006 Page:

Job Performance Measure Exam W'

NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATORWILL BE TAKING NOTES. ASK FOR CLARIFICATIONOF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The plant is operating at 100 % power. The "A" Accumulator pressure is 705 psig. It has slowly decreased over several days.

Initiating Cues :

The Shift Manager directs you to increase the pressure in the "A" Accumulator to 745 psig (+ or

- 10 psig) per S-16.2 using nitrogen cluster "A".

I 1 2-Aug-2006 Page:

Job Performance Measure Exam 31

'W'

Description:

Nitrogen Makeup to Accumulator (JR006.002)

JPM Tasks Task ID: 006-007-01-01B Task Standards :

In accordance with the procedure Without violating Tech Specs Correctly demonstrating proper use of all applicable HU Tools Tools :

Procedure Terminating Cues Task Completion

--_+* .: References :

-ID DescriDtion Review Date Ref Flag PRS S-16.2 NITROGEN MAKE-UP TO THE SI 0 ACCUMULATORS Safety Considerations Lifting of a Relief Valve, High Noise Hazzard Consequences of Inadequate Performance:

Procedure Violation Tech Spec Violation General Comments :

Initialize any at power IC. Open AOV-834A and HCV-945 to decrease Accumulator "A" pressure to

<705 psig (PI-941) and alarm C-1 1 received. Close AOV-834A and HCV-945.

I 1 2-A~g-2006 Page:

Job Performance Measure Exam 41

=..--,

Performance Checklist 1 Element : Conditions : Standards :

Obtain a controlled copy of Same as element. Review S-16.2 and review caution. Procedure and ensure correct revision Comments :

Satisfactory 0 Unsatisfactory 0

  • 2 Element: CRITICAL Conditions : Standards :

Open Accumulator AOV-834A Switch to open demonstrating Proper Touch STAR Comments :

Satisfactory 0 Unsatisfactory 0

  • 3 Element: CRITICAL Conditions : Standards :

Open Auxiliary Building N2 Switch to open demonstrating i- . -Supply

- Valve, AOV-846. Proper Touch STAR Comments :

Satisfactory Unsatisfactory [7 4 Element : Conditions : Standards :

Recognize Step 5.3 complete and Instructor initial as SS.

initial step.

Comments :

Satisfactory 0 Unsatisfactory 0

  • 5 Element: CRITICAL Conditions : Standards :

Establish communication with the (Booth instructor respond as AO.) Demonstrate Proper 3-way AO. Direct A 0 to perfondverify communications the following valve manipulation:


.- Comments :

Satisfactory Unsatisfactory

I 2-Au~-2006 Page: 5 Job Performance Measure Exam 8/ Element : Conditions : Standards :

Direct A 0 to verify Cluster A, B, CUE: Respond that valves are Demonstrate Proper 3-way C valves closed; V-l803A, B, C. closed. communications Comments :

Satisfactory Unsatisfactory

  • 7 Element : CRITICAL Conditions : Standards :

Direct A 0 to open "A" Cluster CUE: Respond that V-l806A is Demonstrate Proper 3-way Valve, V-l806A. open. communications Comments :

Satisfactory 0 Unsatisfactory 8 Element : Conditions : Standards :

Ask A 0 what cluster pressure is CUE: Respond that "A" Cluster Demonstrate Proper 3-way and record. pressure is 2000 psig. communications Comments :


Satisfactory Unsatisfactory

  • 9 Element : CRITICAL Conditions : Standards :

Direct A 0 to open V-l805A. CUE: Respond that V-1805A is Demonstrate Proper 3-way open and 944C is operable communications Comments :

Satisfactory Unsatisfactory 0 10 Element : Conditions : Standards :

Direct A 0 to verify regulator CUE: Respond that regulator Demonstrate Proper 3-way discharge pressure is < 755 psig. pressure is 750 psig. communications Comments :

Satisfactory Unsatisfactory 0

  • 11 Element : CRITICAL Conditions : Standards :

Direct A 0 to open V-944D. Booth 0perator:Set LOA SIS6 at Demonstrate Proper 3-way 2500.0 to get pressure increase and communications report V-944D is open.

Comments :

Satisfactory 0 Unsatisfactory 0

2-Aug-2006 Page: 6 Job Performance Measure Exam

  • 12 Element : CRITICAL Conditions : Standards :

When accumulator pressure NOTE: The N2 supply valves must Observation of Accumulator reaches 750 psig, direct A 0 to be closed before AOV-846 or the Pressure.

close N2 Supply Valve, V-944D. N2 relief valve will lift. Demonstrate Proper 3-way communications Booth Operator: LOA SIS6 set at 0 and report V-944D is closed.

Comments :

Satisfactory 0 Unsatisfactory 0 13 Element: Conditions : Standards :

Direct A 0 to close V-l805A. CUE: V-l805A is closed. Demonstrate Proper 3-way communications Comments :

Satisfactory 0 Unsatisfactory 14 Element: Conditions : Standards :

Direct A 0 to report cluster CUE: Cluster "A"pressure is 1000 Demonstrate Proper 3-way

\--,

pressure. psig. communications Comments :

Satisfactory a Unsatisfactory 0 15 Element: Conditions : Standards :

Direct A 0 to close V-l806A. CUE: Respond that V-1806A is Demonstrate Proper 3-way closed. communications Comments :

Satisfactory 0 Unsatisfactory 0

  • 16 Element: CRITICAL Conditions : Standards :

Close Auxiliary Building N2 Stop Switch to closed Valve, AOV-846. demonstrating Proper Touch STAR W-I Comments:

Satisfactory n Unsatisfactory 0

I I 2-Au~-2006 Page:

Job Performance Measure Exam 71 ii

  • 17 Element : CRITICAL Conditions : Standards :

Close Accumulator Fill Valve, CUE: No further action. Switch to closed AOV-834A. demonstrating Proper Touch STAR Comments :

Satisfactory Unsatisfactory 0 JPM Ouestions Question Answer References Reference Type Reference ID Description Ref Flag

25-May-2 006 Job Performance Measure Exam Page:

I lI

---=

JPM NO JR003.001 Perform Attachment RCP Start (Option 1 No Faults, Option 2 Seal Failure on Pump Start, Option 3 No CCW Cooling in Operation)

Revision #: 7 Review Date: 313 1/2006 Location: Simulator Estimated Time (minutes): 14.00 Candidate:

Evaluator:

---e Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

I I

25-!Way-2006 Job Pmfomance Measure Exam Page:

i THE EVALUATOR WILL EXPLAIN THE JPM INllTAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLEDCOPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATORWILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The plant experienced a small break LOCA. E-0 was performed and a transition made to E-1 ,

then to ES-1.2. Busses 11A & 1 1B are energized.

Initiatinc Cues :

The CRF directs you to start the RCP "Affper ES-1.2, Step 11D.

~

I 1 Page:

Job Performance Measure Exam - . -31

Description:

Perform Attachment RCP Start (JR003.001)

JPM Tasks Task ID: 003-001-05-01A Task Standards :

RCP started Tools :

Procedure Terminatinc Cues Task Completion Trainee States Task is Completed References :

-ID DescriDtion Review Date Ref Flag i-r PRES ES-1.2 POST LOCA COOLDOWN AND DEPRESSURIZATION Safetv Considerations Consequences of Inadequate Performance:

Mitigation of the LOCA may be delayed.

General Comments :

I 25-May-2006 Job Performance Measure Exam Page:

-- . - 1 OPTION 1:

4.

1) Any full power IC (19).
2) Insert MALF RCS2A,B,C or D at 2000 gpm. Perform E-0, E-1, ES-1.2 to step 11. Trip both RCPs.

Depressurize until Przr level >13% (40% adverse). Reduce leak to 1000 gpm after Przr level achieved.

3) Ensure Annunciators A-24 and A-7 extinguished.

OPTION 2:

1) Same conditions as above.
2) Insert MALF RCS12A (200 gpm, 0,O) as conditional after RCPs are tripped.

(JMRCS12A=WRCSOG(l).GT.8000).

OPTION 3:

1) Any full power IC
2) Insert malfunction MALF RCS2A, 2000 gpm
3) Insert MALF EDS6
4) Complete E-0, E-1, ES-1.2 to step 11
5) Clear MALF EDS6
6) Restore off-site power (clear EDS6) per ER-ELEC. 1
7) Verify CCW pump off

25-May-2006 Page: 5 Job Performance Measure Exam -.

  • -- Performance Checklist 1 Element : Conditions : Standards :

Obtain copy of Attachment RCP Same as element.

START.

Comments :

Satisfactory [7 Unsatisfactory 2 Element : Conditions : Standards :

Observes caution at start of Same as element.

attachment.

Comments :

Satisfactory 0 Unsatisfactory [3

~~ ~ ~~

  • 3 Element : CRITICAL Conditions : Standards :

Start RCP Lift Oil Pump. Run for 2 minutes before start RCP .

Verify Oil Lift Pressure Light

--- is lit. (Locate lights, verify lit)

Comments :

Satisfactory 0 Unsatisfactory 0 4 Element : Conditions : Standards :

Verify Przr Spray Valves closed. Locate controllers.

Verify demand indicator at 0%.

Verify valve position green lights lit.

Comments :

Satisfactory 0 Unsatisfactory

r I 25-May-2006 Page: 6 Job Performance Measure Exam - . -

- c L

Element : Conditions : Standards :

CCW in service to "A"RCP with Option 1: Verify CCW Pump

-e-CCW temperature and flow running.

alarms extinguished. Verify alarm A-7 extinguished.

Option 3 Refers to Attachment 15.2 to restore ccw.

Comments :

Satisfactory Unsatisfactory 0 6 Element : Conditions : Standards :

Option 3 Only: Reviews Caution Same As Element and Note at beginning of Attachment 15.2 Comments :

Satisfactory Unsatisfactory 0 Element : Conditions : Standards :

Option 3 Only: Verify Seal Locate Seal Injection flow injection is in service meter Verify Flow to RCP Seal Injection Comments :

Satisfactory Unsatisfactory 8 Element : Conditions : Standards :

Option 3 Only: Check adequate Determine offsite power power avalible to run CCW pump. avaliable. Locates 14/16 Normal Feed Breaker and verifies closed Comments :

Satisfactory Unsatisfactory 0

  • 9 Element : CRITICAL Conditions : Standards :

Option 3 Only: Start one CCW Note: which pump is started is not Locates Pump switch, Pump critical operates swith to start pump.

Comments :

Satisfactory Unsatisfactory

I 25-May-2006 Job Performance Measure Exam Page:

I -:I I

Element : Conditions : Standards :

J Option 3 Only: Verify MOV-817 Locates Valve ,Verifies open Position Comments :

Satisfactory 0 Unsatisfactory 0 11 Element : Conditions : Standards :

Option 3 Only: Verify MOVs Locates Valve ,Verifies 749A and 754A are Open Position Comments :

Satisfactory Unsatisfactory 0 12 Element : Conditions : Standards :

Option 3 :Verify MOV-759A open Locate Valve Indication Comments :

Satisfactory 0 Unsatisfactory 0 13 Element : Conditions : Standards :

Option 3 Detemine that Seal Same As Element Injection is in service return to Att 15.0.

Comments :

Satisfactory 0 Unsatisfactory 14 Element : Conditions : Standards :

"A"RCP Seal Inlet < 135 degrees. Locate Meters, verify < 135 degrees F.

Comments :

Satisfactory Unsatisfactory

~ -

15 Element : Conditions : Standards :

"A"RCP Motor Bearing At PPCS select GD RCPS temperature < 200 degrees. and verify motor bearing temperature "GREEN" or use


recorder if selected.

r 1 25-May-2 006 Page:

Job Performance Measure Exam I 81 2 Comments:

Satisfactory 0 Unsatisfactory

~ ~~ ~

16 Element: Conditions : Standards :

Injection flow > 6 gpm. Locate meter. Verify > 6 Comments :

Satisfactory Iz] Unsatisfactory 17 Element: Conditions : Standards :

Lab Seal dlp > 15 inches of water. Locate meter. Verify > 15".

Comments :

Satisfactory Unsatisfactory [3

'9 Element: Conditions : Standards :

Verify "A"RCP #1 Seal dlp > 220 Locate meter. Verify > 220

- psid. psid.

Comments :

Satisfactory 0 Unsatisfactory 19 Element: Conditions : Standards :

RCP Oil Level alarm Alarm A-24 extinguished.

extinguished.

Comments :

Satisfactory Unsatisfactory 20 Element: Conditions : Standards :

RCP Oil Level indicator on scale. Locate meter. Verify on scale.

Comments :

Satisfactory 0 Unsatisfactory 0

-I.-,- Element : Conditions : Standards :

Opedcheck open RCP Seal Outlet If valve closed, open.

Valve. AOV-270A.

If valve open, verify open.

I 25-May-2006 Page:

. I Job Performance Measure Exam - - -. -1 9

Comments :

Satisfactory 0 Unsatisfactory 0 Element : Conditions : Standards :

If MOV-3 13 OPEN: - Locate valve switch. Verify position.

-Verify VCT pressure >15 psig. - Locate meter. Verify > 15 psig.

- Verify #1 Seal Leakoff within - Obtain figure. Locate the Normal Operating Range of meter. Verify flow within Figure RCP SEAL LEAKOFF. acceptable range of the graph.

-"A"RCP Standpipe low level -AlarmB-1 1 extinguished.

alarm extinguished.

Comments :

Satisfactory 0 Unsatisfactory c]

Element : Conditions : Standards :

If MOV-3 13 CLOSED:

- Verify #1 Seal Met temperature. -Verify temperature 135 degrees.

-Verify #1 Seal d p . -Verify seal d/p > 220 psid.

Comments :

Satisfactory 0 Unsatisfactory 0 ~ ~~

Element : CRITICAL Conditions : Standards :

Start "A"RCP. CUE: (If notifies CRF that RCP is -Notify CRF ready to start ready) Start "A"RCP. RCP (not critical to task).

-Switch to start.

Comments :

Satisfactory n Unsatisfactory c]

~~

Element : Conditions : Standards :

Observes indications. OPTIONS 1 & 3 Same as element.

CUE: No M e r action.

Job Perform ure Exam

, e (ZS-Mny-2006 .I - -- ' - c

-.' Comments :

Satisfactory Unsatisfactory 0

~~ - ~~

  • 26 Element: CRITICAL Conditions : Standards :

OPTION 2: CUE: No M e r action. OPTION 2: Same as element.

(May refer to AR's and Observes seal failure conditions AP-RCP.1.)

and stops RCP.

Comments :

Satisfactory c] Unsatisfactory 0

I I Job Performance Measure Exam Page:

ll

\-d JPM NO JR103.007 Manually Close CNMT Isolation Valve on CI Failure (Option 1 no faults, Option 2 MOV 3 13 cannot be closed remotely)

Revision#: 0 Review Date: 4/1/2006 Location: Simulator Estimated Time (minutes): 5.00 Candidate:

Evaluator:

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

- I 1 2-Aug-2006 Page:

Job Performance Measure Exam NOTE THE EVALUATORWILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE MAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATORWILL BE TAKING NOTES. ASK FOR CLARIFICATIONOF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

An SI occurred while the plant was at 100% power. While performing E-0 it was determined that Containment Isolation failed to actuate.

Initiating Cues :

Verify Containment Isolation in accordance with Step 12 of E-0.

I i 2-Aug-2006 Job Performance Measure Exam Page: 3

.;J',

Description:

Respond To Containment Isolation JPM Tasks Task ID: 103-002-04-01 Task Standards :

All brighddim status lights indicate bright (all CI and CVI valve close) or manual actions initiated to close valves outside the control for those valves that cannot be closed from the Control Room.

Tools :

Terminating; Cues All valves closed or actions initiated to close alternate isolation valves.

References :

ID Description Review Date Ref Flag PRAR AR-A-26 CONTAINMENT ISOLATION Safety Considerations Consequences of Inadequate Performance:

Failure to isolate CNMT will result in exceeding 10CFRl 00 Dose Limits for accidents.

General Comments :

1) Setup IC-19.
2) Insert malfunction MALF RPS6
3) Option 2 Insert SW OVR CVC41C off. MOV 3 13 cannot be operated from the MCR.
4) Insert MALF RCS2A DBLOCA 5 ) Complete E-0 up to step 12.

I 1 F

2-Aug-2006 Page:

Job Performance Measure Exam 4 1 d

Performance Checklist 1 Element : Conditions : Standards :

Review E-0 step 12 Same as Element.

Comments :

Satisfactory 0 Unsatisfactory 0 2 Element : Conditions : Standards :

Check Annunciator A-25/26. Locate Annunciators.

Determine not lit. Locate CI pushbutton and depress.

Comments :

Satisfactory Unsatisfactory

I I 2-Au~-2006 Page: 5 Job Performance Measure Exam i j

  • 3 Element: CRITICAL Conditions : Standards :

Check CI/CVI status lights bright. Determine all lights not bright.

- Close affected valves by placing switch to close or Close/remote switch to close.

Close the following valves:

-AOV 1789 RCDT to Gas Analyizer

-AOV 1788 RCDT to Vent Header

-AOV 1787 RCDT to Vent Header

-AOV 1721 RCDT Outlet

-MOV 813 CCW to RX Support Coolers

-MOV 814 CCW from Rx Support Coolers

-AOV 371 Letdown Line Isolation Note: if option 2 is being used MOV 3 13 will be closed by step 4

-MOV 3 13 RCP Seal Return

-AOV 5392 IA to CNMT

-AOV 5738 S/G A Blowdown Isol.

-AOV 5737 S/G B Blowdown Isol.

-AOV 5735 S/G A Sample Isol.

-AOV 5736 S/G B Sample Isol.

Per Attachment 3.0

- Pull Stop CNMT S U ~ P Pumps.

- Dispatch A 0 to close 1723/1728 locally.

Comments :

Satisfactory 0 Unsatisfactory 0

. I 2-Au~-2006 Page:

I Job Performance Measure Exam d(

% Element : CRITICAL Conditions : Standards :

OPTION 2 Per Attachment 3.0 Determine MOV-3 13 cannot be - Dispatch A 0 to close closed. V-3 15A and V-3 15C locally.

NOTE: If A 0 dispatched to locally close MOV-3 13 the critical step is not met.

Comments :

Satisfactory 0 Unsatisfactory 0 5 Element : Conditions : Standards :

Verify CNMT Fan Cooler Status Locate lights. Veri@ bright.

Light - Bright. -AOV 4561

-AOV 4562 Comments :

~ _ _ _ _ _

Satisfactory n Unsatisfactory 0 Element : Conditions : Standards :

.u* Veri@

Letdown Orifice valves Locate valve indications and closed. verify closed.

CUE: No further actions.

Comments :

Satisfactory 0 Unsatisfactory JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag

I 1 2-Au~-2006 Page:

Job performance Measure Exam u

JPM NO JR064.002 Start and Load the Emergency Diesel Generator (PT-12.1)

Revision #: 14 Review Date: 4/18/2006 Location: Simulator Estimated Time (minutes): 10.00 Candidate:

Evaluator:

.L.---

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

2-Au~-2006 Page: 2 Job Performance Measure Exam

'd.

NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATORWILL BE TAKING NOTES. ASK FOR CLARIFICATIONOF P M REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

A surveillance test of the "A"EDG is due following minor maintenance. PT- 12.1 Emergency Diesel Generator A has been intiated and is complete up to step 6.10.20. The DG is running and ready to be loaded. The Plant is at 100% power.

Initiating Cues :

Load the A DG in accordance with PT- 12.1 starting at step 6.10.2 1.

2-Au~-2006 Page:

Job Performance Measure Exam 3 1

-d

Description:

Start and Load the Emergency Diesel Generator (PT-12.1)

JPM Tasks Task ID: 064-009-02-0 1A Task Standards :

Perform the Surveillance Test IAW PT-12.1 Tools :

Terminating Cues Option 1: D/G has been loaded to 2050KW (+25 -0) with power factor of approximately .9.

Option 2: Option 1 critera met plus D/G correctly aligned for post SI operation.

References :

, ID

- Descrbtion Review Date Ref Flag ic-PRPT PT-12.1 EMERGENCY DIESEL GENERATOR A 0 Safetv Considerations Consequences of Inadequate Performance:

Failure to correct perform the test could result in undectected inoperably of the D/G.

Incorrect performance can also result in damage to the D/G and/or its associated electrical equipment.

General Comments :

Initialize any stable at power IC. Verify selected A/C Service Water Pump is not running. (ie, "C" running, "A" secured, "C" selected) Place synchroscope in "B" D/G position and turn off D/G voltmeter and ammeter.

Copy of PT-12.1 ready. Start the DG per PT-12.1. Complete PT up tp step 6.10.20

.L-' Option 2: SI occurs following loading to max load; Insert OVR-RPS04, ON, Trains Trigger 1 When max load is reached insert Trigger 1

~

I 2-Au~-2006 Page: 4 Job Performance Measure Exam 4

Performance Checklist 1 Element : Conditions : Standards :

Procedure CUE: Provide copy of PT-12.1.

Comments :

Satisfactory n Unsatisfactory [7 2 Element : Conditions : Standards :

Review precautions. Same as element.

Comments :

Satisfactory Unsatisfactory 0

  • 3 Element : CRITICAL Conditions : Standards :

Place UnitParallel Switch in Locate switch, place in Parallel. parallel b Comments :

Satisfactory 0 Unsatisfactory 0

  • 4 Element : CRITICAL Conditions : Standards :

Select bus 18 with synchroscope. Locate switch, place in Bus 18 position Comments :

Satisfactory 0 Unsatisfactory

~~

  • 5 Element : CRITICAL Conditions : Standards :

Adjust Generator voltage to 5 to Locate Auto voltage control, 10 volts above Running voltage. adjust as necessary.

Comments :

Satisfactory Unsatisfactory 0

  • 6 Element : CRITICAL Conditions : Standards :

Adjust Governor Control so that Adjusts speed slowly and

.--- ~ synchroscope is turning slowly in observes synchroscope for the fast direction. (2 - 5 rpm on proper indications of 2 - 5 synchroscope) rpm.

2-A ~ g -006 2 Page: 5 Job Performance Measure Exam

  • u' Comments :

Satisfactory 0 Unsatisfactory 0

  • 7 Element : CRITICAL Conditions : Standards :

Close selected breaker, pick up Ensures synchroscope turning 300-500 KW. slowly in the fast direction.

Closes breaker slightly before 12 o'clock. Picks up proper load. Proceeds to next 2 steps without delay.

Comments :

Satisfactory Unsatisfactory 8 Element : Conditions : Standards :

Maintain power factor at Adjust the AUTO voltage approximately .9 Lagging. controller to maintain power factor between .85 and .95 per precautions.

L--

Comments :

Satisfactory Unsatisfactory 0

  • 9 Element : CRITICAL Conditions : Standards :

Select other synchroscope CUE: Maintenance performed was Locate switch, place to Bus position, close other breaker. not major. 14 position. Locate and close Bus 14 breaker NOTE: Examinee should N/A Step 6.17.

Comments :

Satisfactory 0 Unsatisfactory 0

  • 10 Element : CRITICAL Conditions : Standards :

Load to 2050 KW (+25, -0). Locate the governor control raise to pick up load evenly, approximately 500 KW every 30 seconds.

Comments :

Satisfactory Unsatisfactory [7

2-Au~-2006 Page: 6 Job Performance Measure Exam 4

11 Element : Conditions : Standards :

Records time 2050 KW attained. Same as element.

Comments :

Satisfactory 0 Unsatisfactory 0 12 Element : Conditions : Standards :

Maintains approximately .9 CUE:Option 1 No further action. Maintains between .85 and Lagging power factor during load .95 per precautions.

changes.

Comments :

Satisfactory 0 Unsatisfactory c]

13 Element : Conditions : Standards :

Option 2: Inadvertant SI CUE: SI has just occured the CRS References attachment 8 of direct you to perform required PT-12.1 Emergency D/G actions

. . Comments :

Satisfactory Unsatisfactory 0 14 Element : Conditions : Standards :

Reviews actions of attachment 8 Reviews step 1-3 of attachment Same as element Comments :

Satisfactory Unsatisfactory

  • 15 Element : CRITICAL Conditions : Standards :

Adjust D/G voltage to Locate Auto Voltage Contol Approximately 480 Volts for the A D/G. Adjusts control to lower voltage to approximately 480 Volts on the output voltmeter.

Comments :

Satisfactory Unsatisfactory h-6 Element : Conditions : Standards :

Verify that the SI sequence is Checks to verify that all the complete. sequencer loads have started

2-Au~-2 006 Page:

Job Performance Measure Exam 71 Comments :

Satisfactory Unsatisfactory

  • 17 Element : CRITICAL Conditions : Standards :

Transfer the A D/G governor to Locates UnitParallel switch Unit mode of operation and transfer it to Unit Comments :

Satisfactory u Unsatisfactory 0

  • 18 Element: CRITICAL Conditions : Standards :

Adjust A D/G Speed Locates Frequency meter and Governor speed control.

Adjusts governor speed control to lower frequency to approximately 60 Hz Comments :


Satisfactory 0 Unsatisfactory

~ ~

19 Element: Conditions : Standards :

NotifL CRS that attachment 8 is CUE: No further actions Notifies CRS complete Comments Satisfactory Unsatisfactory 0 JPM Ouestions Question Answer References Reference Type Reference ID Description Ref Flag

I I 2-Au~-2006 Page:

Job Performance Measure Exam

'4 JPM NO JR012.001 Defeat a Failed Przr Pressure Channel Revision #: 8 Review Date: 7/18/2006 Location: Simulator Estimated Time (minutes): 12.00 Candidate:

Evaluator:

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

2-A~g-2006 Job Performance Measure Exam Page: 2

-.J NOTE THE EVALUATORWILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATIONOF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The plant was operating at  % power when PI-429 failed high. The operators took appropriate actions.

Initiatine Cues :

PT-429 failed high. The operators took all appropriate actions. The Shift Supervisor directs you to defeat the failed Przr instrument channel per ER-INST.l, Step 4.4.5. A Turbine Runback did not occur.

I i 2-Au~-2006 Page:

Job Performance Measure Exam 3 1 i/

Description:

Defeat a Failed P r n Pressure Channel (JRO 12.001)

JPM Tasks Task ID: 0 12-006-01-01 E Task Standards :

Tools :

Terminating Cues References :

-TD DescriDtion Review Date Ref Flag


PRER ER-INST. 1 REACTOR PROTECTION BISTABLE 0 DEFEAT AFTER INSTRUMENTATIONLOOP FAILURE Safetv Considerations Consequences of Inadequate Performance:

General Comments :

At power IC. Insert MALF PZR2A, close MOV-5 16 PORV Block Valve per ER-INST. 1 Step 4.4.3.

2-Au~-2 006 Page:

Job Performance Measure Exam 4 1

-w4 Performance Checklist 1 Element : Conditions : Standards :

Obtain controlled copy of Same as element.

ER-INST. 1.

Comments :

Satisfactory Unsatisfactory 0

~~

2 Element : Conditions : Standards :

Refer to appropriate section of Same as element.

ER-INST.1,Step 4.4.5.

Comments :

Satisfactory Unsatisfactory 0 3 Element : Conditions : Standards :

Verify P/429A defeat in normal Go to PLP Rack.

position. Verify P/429A in Normal

--- position.

Comments :

Satisfactory Unsatisfactory 0

  • 4 Element: CRITICAL Conditions : Standards :

Place switch T-405E to Loop A - Go to RIL Rack, unlock and unit 1. open door.

Shift switch from operate to Unit #l.

Go to R-1 Protection Channel

  1. 1 cabinet, unlock and open door.

Comments :

Satisfactory 0 Unsatisfactory 0

  • 5 Element: CRITICAL Conditions : Standards :

Trip bistable Overtemperature Pull and lift switch.

-.L--

~ Trip. 405 LOOPA-1

Page:

Job Performance Measure Exam 5 1 Comments :

Satisfactory 0 Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Trip bistable for High Pressure Pull and lift switch.

trip. 429 Channel 1 Comments :

Satisfactory Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Trip Bistable for Low Pressure Pull and lift switch.

trip 429 Channel 1 Comments :

Satisfactory 0 Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Trip bistable for SI.429 Channel Pull and lift switch.

1 Comments :

Satisfactory Unsatisfactory Element : CRITICAL Conditions : Standards :

Trip bistable for Unblock SI. 429 Pull and lift switch.

Channel 1 Comments :

Satisfactory Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Place proving switch P/429B to In PLP Rack place P/429B Defeat (UP) in PLP Rack. switch to Defeat.

Comments :

Satisfactory 0 Unsatisfactory 0 Element : Conditions : Standards :

Place Przr Pressure Recorder Place switch on MCB to switch to Position 1-3. position 1-3.

I 1 2-Aug-2006 Page:

Job Performance Measure Exam d

Comments :

Satisfactory unsatisfactory 12 Element : Conditions : Standards :

Verify Bistable Status Lights CUE: No Further Action Same as E l e m e n t Comments :

Satisfactory Unsatisfactory 0 W

2-Au~-2006 Page:

Job Performance Measure Exam 71

,4.

JPM Questions Question JO 12.001A Explain why it is necessary to place Delta-T defeat in Loop A Unit One for a failure of P E R pressure k\wzkPT-429.

PT-429 supplies an input for one overtemperature Delta-T setpoint calculation. (Since a P E R pressure channel is failed, the affected OT Delta-T rod stop and runback channel is bypassed fiom rod stop and runback.) (This also bypasses the associated OP De References Reference Type Reference ID Description Ref Flag SD RGE-20 REACTOR COOLANT TEMPERATURE El INSTRUMENT SYSTEM Question JO 12.001B Explain how you would select a good channel for PRZR Pressure Control if currently selected channel pled.

nswer (Refer to ER-INST. 1.) Select (position associated with) an operable channel on (PRZR pressure isfer) switch in PLP Rack.

Yeferences Reference Type Reference ID Description Ref Flag PRER ER-INST. 1 REACTOR PROTECTION BISTABLE DEFEAT H AFTER INSTRUMENTATION LOOP FAILURE Question JO 12 .OO 1C What is the logic and setpoint for Low P E R Pressure reactor trip and Low PRZR Pressure SI?

Answer Rx Trip - 2/4, 1873 psig SI - 2/3, 1750 psig References Reference Type Reference ID Description Ref Flag SD RGE- 19 PRESSURIZER PRESSURE AND LEVEL Ed CONTROL SYSTEM

I I

9-May-2006 Job Performance Measure Exam Page:

I e . -- lI e

I l.2 JPM NO JR029.001 Startup the Containment Mini Purge Revision #: 2 Review Date: 5/8/2006 Location: Simulator Estimated Time (minutes): 8.00 Candidate:

Evaluator:

A-ActuaI Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

I 1 I

I 9-Mny-2006 Job Performance Measure Exam Page:

I -2 I

- :I NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATORWILL BE TAKING NOTES. ASK FOR CLARIFICATIONOF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

-4routine Cixnt entry is required tomorrow.

Initiating Cues :

The Shift Manager directs you to place Mini Purge System in service. A Containment Mini-Purge Release has been initiated and SM & RP approvals have been received.

I 9-May-2006 Job Performance Measure Exam Page:

I 3l

Description:

Startup the Containment Mini Purge (JR029.001)

JPM Tasks Task ID: 029-007-01-01A Task Standards :

Terminatine Cues References :

ID Descrbtion Review Date Ref Flag PRS S-23.2.3 CONTAINMENT MINI-PURGE SYSTEM cl OPERATION Safetv Considerations Consequences of Inadequate Performance:

General Comments :

Verify Mini-Purge is secured in IC, may be performed at any operating IC.

Fill out a S-23.2.3 with the initial conditions signed off.

Option 2: When Mini Purge is started, ramp R-14up to 3E5 CPM MALF RMS02D, 3E5,120 sec ramp.

1 9-May-2006 Page:

Job Performance Measure Exam

.JPerformance Checklist 1 Element : Conditions : Standards :

Procedure CUE: Hand student a copy of S-23.2.3.

Comments :

Satisfactory Unsatisfactory [I]

2 Element : Conditions : Standards :

Reviews precautions. Same as element.

Comments :

Satisfactory Unsatisfactory c]

3 Element : Conditions : Standards :

Verify Mini Purge Roof Vent CUE: Report V-7479 locked Direct A 0 to verify.

Isolation Valve, V-7479, locked closed.

closed.

Comments :

Satisfactory Unsatisfactory

~- ~~~ ~ ~ ~~~

  • 4 Element: CRITICAL Conditions : Standards :

Open Mini Purge Exhaust Valve, Shift switch to open.

AOV-7970.

Comments :

Satisfactory Unsatisfactory 0

  • 5 Element: CRITICAL Conditions : Standards :

Open Mini Purge Exhaust Valve, Rotate switch to open.

AOV-797 1.

Comments :

Satisfactory Unsatisfactory EIement : CRITICAL Conditions : Standards :

--- Open Mini Purge Supply Valve, Rotate switch to open.

AOV-7478.

I I

-- - --5

-

  • I Comments:

Satisfactory c] Unsatisfactory

  • 7 Element: CRITICAL Conditions : Standards :

Open Mini Purge Supply Valve, Rotate switch to open.

AOV-7445.

Comments :

Satisfactory Unsatisfactory [7 8 Element : Conditions : Standards :

Observe note before 5.1.6.

Comments :

Satisfactory Unsatisfactory Element : CRITICAL Conditions : Standards :

Start "A"Mini Purge Supply and CUE: Containment pressure has Rotate switch to run.

L--

verify Containment pressure increased slightly and stabilized.

increase.

Comments :

Satisfactory 0 Unsatisfactory 10 Element: Conditions : Standards :

Recognize R- 14 Alarm Acknowledges alarms.

Refers to precaution in S-23.2.3 or AR for R-14 alarms.

Comments :

Satisfactory 0 Unsatisfactory 0

  • I1 Element : CRITICAL Conditions : Standards :

Determine Mini-Purge. Must be Same as Element.

shutdown Comments :

W' Satisfactory c] Unsatisfactory

I I

. 9-May-2006 Job Performance Measure Exam Page:

-- - - 7

- c

-' Element: CRITICAL Conditions : Standards :

Stop Mini-Purge Blower 1A. Same as Element.

Comments :

Satisfactory Unsatisfactory

  • 13 Element: CRITICAL Conditions : Standards :

Closes supply valves 7478 and Same as Element.

7445.

Comments :

Satisfactory 0 Unsatisfactory

  • 14 Element : CRITICAL Conditions : Standards :

Closes exhaust valves 7970 and Same as Element.

797 1. CUE: No further actions.

Comments :

-.Le-Satisfactory 0 Unsatisfactory 0

I I 2-Au~-2006 Page:

Job Performance Measure Exam u'

JPM NO JN086.002 Secure Ventilation Systems During a Fire Revision #: 1 Review Date: 7/19/2006 Location: Int Bldg-Hot Estimated Time (minutes): 10.00 Candidate:

Evaluator:

~\/-,

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

w I I Job Performance Measure Exam Page:

2l u

NOTE THE EVALUATORWILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATORWILL BE TAKING NOTES. ASK FOR CLARIFICATIONOF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

A fire has occurred on the intermediate floor of the Auxiliary Building. The operators are responding per procedure FRP-5.0, Auxiliary Building (AB) Intermediate Floor. The Auxiliary Building Ventilation system is in operation.

Initiating: Cues :

The Shift Manager has directed you to secure ventilation in accordance with FRP-5.0, Step 1.5.

Page:

Job Performance Measure Exam 31

.u'

Description:

Respond To A Plant Fire On Site JPM Tasks Task ID: 086-001-04-01 Task Standards :

Ventilation fans specified in Step 1.5 are shutdown.

Tools :

Hearing Protection Safety Glasses Hard Hat Terminating Cues Task Completion References :

-ID DescriDtion Review Date Ref Flap PWRP FRP-5.0 AUXILIARY BUILDING INTERMEDIATE 0 FLOOR Safety Considerations Consequences of Inadequate Performance:

Spreading of smoke and fire in the plant.

General Comments :

2-A ~g-2006 Page:

Job Performance Measure Exam 4 1 Performance Checklist 1 Element : Conditions : Standards :

Review FRP-5.0 Step 1.5. Same as Element.

Comments :

Satisfactory 0 Unsatisfactory 0

  • 2 Element: CRITICAL Conditions : Standards :

Secure the CAB Exhaust Fan. Proceed to Fan Control Intermediate Building Top Level Simulate securing fan.

Comments :

Satisfactory n Unsatisfactory 0 2 Element : Conditions : Standards :

-LA--

Veri@ AB A AHU and AB B Proceed to Vent Control Supply are off. Panel (by Controlled Access Door).

CUE: Lights are green.

Comments :

Satisfactory 0 Unsatisfactory

2-Au~-2006 Page: 5 Job Performance Measure Exam Element : CRITICAL Conditions : Standards :

Place Master Vent Control to Locate switch on Control l'off I. Panel.

Simulate placing to "Off',

Verify the following fans stopped:

- 1B Exhaust A/B Red light off at Vent Panel CUE Light is off

- 1B Exhaust C Check for Air Flow at grate outside change room (Hot Shop)

CUE: No Air Flow

- CA Exhaust A/B Green Light on (Vent Panel)

CUE: light is green

- AB Exhaust F CUE:Red Light off on Vent Panel Comments :

Satisfactory n Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Secure the AB Main Exhaust Fans Locate Controls of Vent AandB panel.

Simulate securing fans.

Cue Lights are green Comments :

Satisfactory Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Secure the G Fan. Proceed to Control (East end SFP). Simulate stopping fan.

CUE: Fan Stops.

CUE: No futher actions.

Comments :

Satisfactory 0 Unsatisfactory 0

I 1 Job Performance Measure Exam Page:

7

%M Questions Question Answer References Reference Type Reference ID Description Ref Flag

, 1 2-Au~-2006 Page:

Job Performance Measure Exam JPM NO JC035.006 Perform ATTACHMENT RUPTURED STEAM GENERATOR PART B Revision#: 6 Review Date: 711912006 Location: Turb Bldg Estimated Time (minutes): 12.00 Candidate:

Evaluator:

...+/.

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

2-Au~-2006 Page: 2 Job Performance Measure Exam l 4 NOTE THE EVKUATOR WILL EXPLAIN THE JPM INlTIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE MAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVATJATOR WILL BE TAKING NOTES,. ASK FOR CLARIFICATIONOF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The plant has experienced a Steam Generator tube rupture. The plant is in procedure E-3, STEAM GENERATOR TUBE RUPTURE. The MSIV cannot be closed.

Initiating Cues :

Plant is in E-3, STEAM GENERATOR TUBE RUPTURE. You have been directed to complete RUPTURED STEAM GENERATOR ATTACHMENT PART B. Do not operate any plant equipment. Simulate use of ladders as appropriate.

2-Au~-2006 Page:

Job Performance Measure Exam 31

==

Description:==

ATTACHMENT RUPTURED STEAM GENERATOR PART B (JC035.006)

JPM Tasks Task ID: 035-010-05-01A Task Standards :

In accordance with the procedure Tools :

Terminating Cues Trainee States Task is Completed Task Completion References :

ID Description Review Date Ref Flag PRATT ATT- 16.0 ATTACHMENT RUPTURED S/G 0 PRE E-3 STEAM GENERATOR TUBE RUPTURE 0 Safety Considerations Safety Glasses Hearing Protection Hard Hat Safety Shoes Leather Gloves Consequences of Inadequate Performance:

Spread of contamination Increased difficulty mitigating tube rupture General Comments :

- Provide copy of ATT-16.0.

- Should provide laser pointer.

2-Aug-2006 Page: 4 Job Performance Measure Exam

..W Performance Checklist 1 Element : Conditions : Standards :

NOTE NOTE: Evaluator supply copy of attachment. Should supply laser pointer for hothard to access spots.

Comments :

Satisfactory 0 Unsatisfactory 0 2 Element : Conditions : Standards :

Proceed to Turbine Bldg. Same as element.

Comments :

Satisfactory Unsatisfactory Element : CRITICAL Conditions : Standards :

Close MFW Regulating Valve NOTE: May allow laser for - Locate valves.

and Bypass Valve Manual 398913988. - Simulate closing.

Isolation Valves.

- SIG A, V-3985, V-3989 CUE:(If student requests eSOMS

- SIG B, V-3984, V-3988 location) eSOMS gives valve location at: TB MEZZ, FEED REG VALVE AREA, ELEV (3985,3984=6),(3989,3988=3)

CUE: The valve no longer turns in that direction.

Comments :

Satisfactory 0 Unsatisfactory 0

  • 4 Element: CRITICAL Conditions : Standards :

Close Reheat Steam Chain CUE: the valve no longer turns in - Locate valves.

Valves. that direction. - Simulate closing.

- V-3551 (1A MSR)

- V-3550 (1B MSR) CUE:(If student requests eSOMS

- V-3553 (2A MSR) location) eSOMS gives valve

- V-3552 (2B MSR) location at: TB MEZZ, #1 MSRs AREA, ELEV 12

4. Comments :

Satisfactory Unsatisfactory 0

2-Au~-2006 Page:

Job Performance Measure Exam i j

  • 5 Element : CRITICAL Conditions : Standards :

Close Steam Dump Header CUE: The valve no longer turns in - Locate valves.

Isolation and Bypass Valves. that direction. - Simulate closing.

- V-3532 and V-3659

- V-3533 and V-3658 NOTE: May allow laser to preclude climbing over hot pipes.

CUE: (If student requests eSOMS location) eSOMS gives valve location at: TB MEZZ, MAIN STEAM HEADER AREA, ELEV 10 Comments :

Satisfactory Unsatisfactory [7

  • 6 Element: CRITICAL Conditions : Standards :

Close Reheat Steam Line CUE: the valve no longer turns in - Locate valves.

Warmup Valves. that direction. - Simulate closing.

- V-3645

- V-3646 NOTE: May allow laser for

-c-/

- V-3647 364513646.

- V-3648 CUE: (If student requests eSOMS location) eSOMS gives valve location at: TB MEZZ, #lMSRs AREA (for valves 3645 ELEV 8,

& 3646 ELEV 9), # MSRs AREA (for valves 3647 ELEV 5, & 3648 ELEV 4)

Comments :

Satisfactory 0 Unsatisfactory 0

  • 7 Element: CRITICAL Conditions : Standards :

Close Reheat Steam Line CUE: the valve no longer turns in - Locate valve.

Common Vent. that direction. - Simulate closing.

- V-8500 CUE:(If student requests eSOMS location) eSOMS gives valve location at: TB MEZZANINE LP HEATER A DRAINS AREA, ELEV 6

I 1 2-Aug-2006 Page:

Job Performance Measure Exam

,.d' Comments :

Satisfactory Unsatisfactory

  • 8 Element: CRITICAL Conditions : Standards :

Close Steam to Trap header CUE: The valve no longer turns in - Locate valves.

Isolation Valves. that direction. - Simulate closing.

- V-8513

- V-8529 CUE:(If student requests eSOMS

- V-3596 alve location at: TB MEZZANINE

- V-3598 MAIN STEAM HEADER AREA, ELEV 6 (for 8513), TB MEZZANINE TURBINE OIL RESERVOIR AREA, ELEV 6 (for valves 8529,3596,3598)

Comments :

Satisfactory 0 Unsatisfactory 0

~~ ~

Element : Conditions : Standards :

-' Report completion to Control NOTE: Acknowledge radio Same as element.

Room. communication.

CUE: No further action.

Comments :

Satisfactory 0 Unsatisfactory 0

~ ~~

JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag

I- I I

2-A~ g - 006 2

Job Performance Measure Exam Page:

lI I

JPM NO JN071.002 Release the "A"Gas Decay Tank Revision#: 1 Review Date: 7/19/2006 Location: Aux Bldrr Estimated Time (minutes): 20.00 Candidate:

Evaluator:

\/'

Actual Time:

Trainee Performance: Satisfactory Unsatisfactory Trainee:

Instructor:

Submitted By Date Reviewed By Date

2-Au~-2006 Page: 2 Job Performance Measure Exam "d'

NOTE THE EVALUATORWILL EXPLAIN THE JPM INJTIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATIONOF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

Initial Conditions:

The plant is operating with a small fuel leak. The "A"GDT is full and must be released per the release permit.

Initiating Cues :

Release the "A"GDT per S-4.2.5, Release of Gas Decay Tank.

t I 2-Au~-2006 Page: 3 Job Performance Measure Exam

-4

Description:

Conduct an Authorized Gas Release JPM Tasks Task ID: 5071-003-01-01 Task Standards :

Conduct the release in accordance with S-4.2.5 Release of a GDT.

Tools :

Hard Hat Safety Glasses Hearing Protection Dosimetry Terminating Cues

.J

.L Task Completion References :

-ID Description Review Date Ref Flag PRS S-4.2.5 RELEASE OF GAS DECAY TANK Safety Considerations Consequences of Inadequate Performance:

Exceeding release rates specified by permit General Comments :

Develop a gas release with a release rate less than the maximum.

2-Aug-2006 Page:

Job Performance Measure Exam 4 1 Performance Checklist Element : Conditions : Standards :

Review procedure. Same as Element.

CUE: Give candidate copy of procedure complete up to step 5.0.1 and release form.

Comments :

Satisfactory Unsatisfactory 0 Element : CRITICAL Conditions : Standards :

Verify Closed inlet to A GDT Locate control.

PCV-1036A. CUE: Block Tag is Installed on the control.

CUE: Green light lit Location Waste Panel Comments :

Satisfactory Unsatisfactory c]

Element : CRITICAL Conditions : Standards :

Verify Closed GDT Reuse Valve Locate control.

AOV- 1629. Location Waste Panel Comments :

Satisfactory Unsatisfactory 0

~~ ~~

Element : Conditions : Standards :

Veri@ GDT A outlet to Gas Locate control.

Analyzer PCV-1036B closed CUE: Green light lit Location Waste Panel Comments :

Satisfactory 0 Unsatisfactory 0 Element : Conditions : Standards :

Verify all manual outlet valves If Location is requested eSOMS Locate valve.

1617, 1618, 1619, 1620 Locked poistion is Aux BLD Intermediate Verify Locked Closed closed. level GDT alley 5' elevation CUE: All valves are locked closed. 1617 has a HOLD tag attached.

I I Page:

Job Performance Measure Exam 5 1 Comments :

Satisfactory Unsatisfactory 0

  • 6 Element : CRITICAL Conditions : Standards :

Close Release Valve RCV-14. Locate Control.

Simulate closing.

CUE: Valve is closed.

Comments :

Satisfactory 0 Unsatisfactory 0

~~

7 Element : Conditions : Standards :

Remove Hold on V-1617. Locate valve.

CUE; ESOMS release sheet indicates hold on V 1617 relreased.

Simulate removing hold.

CUE: Hold removed.

Comments :

Satisfactory Unsatisfactory 0

  • 8 Element : CRITICAL Conditions : Standards :

Unlock and open V- 1617 Locate valve.

Simulate unlocking and opening.

CUE: Valve no longer turns in that direction.

Comments :

Satisfactory Unsatisfactory 0

  • 9 Element : CRITICAL Conditions : Standards :

Throttle opens RCV-0 14 while Locates control throttle open maintaining less than release rate. while monitoring release rate.

CUE: R-14 indicates a slight increase.

Comments :

-\----

Satisfactory 0 Unsatisfactory c]

I 1 2-Au~-2 006 Page:

Job Performance Measure Exam

-36 Element : Conditions : Standards :

Notify Control Room of release Simulate calling Control initiation Room.

CUE: A GDT indicate <5psi pressure.

Comments :

Satisfactory 0 Unsatisfactory

  • 11 Element : CRITICAL Conditions : Standards :

Close RCV- 14. Locate Control.

Simulate closing.

CUE: Valve indicates closed.

Comments :

Satisfactory 0 Unsatisfactory 0 12 Element : Conditions : Standards :

Notify Control Room. Simulate calling Control.

CUE: Pressure is 4 psi Comments :

Satisfactory Unsatisfactory 0

  • 13 Element : CRITICAL Conditions : Standards :

Close and Lock 1617. Locates valve.

Simulate closing and locking.

CUE: Valve no longer turns in that direction.

Comments :

Satisfactory 0 Unsatisfactory 14 Element : Conditions : Standards :

Remove Hold on PCV-1036A. Locate valve.

CUE: Hold is removed.

CUE: No further actions.

Comments :

I - -

Satisfactory 0 Unsatisfactory 0

I I 2-Aug-2006 Page:

Job Performance Measure Exam 71

.%M Questions Question Answer References Reference Type Reference ID Description Ref Flag