Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .26 June 2023Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .Offsite Dose Calculation Manual
ML23165A28514 June 2023Discharge Monitoring Report (Dmr), May 2023
ML23165A28614 June 2023Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, SW-17, SW-18, SW-19, and SW-21
ML23163A03913 June 2023Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000327/2023011, 05000328/2023011) and Request for Information (RFI)Safe Shutdown
Fitness for Duty
Exemption Request
Fire Protection Program
PMNS20230712, Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants12 June 2023Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request for the Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants
ML23163A0388 June 2023Discharge Monitoring Report (Dmr), April 2023
ML23142A21322 May 2023Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear PlantsOpen House
CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions16 May 2023Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure RevisionsOffsite Dose Calculation Manual
IR 05000327/202330115 May 2023NRC Operator License Examination Report 05000327/2023301 and 05000328/2023301
ML23121A07711 May 2023Transmittal of Final Accident Sequence Precursor Report Regarding Centrifugal Charging Pump 1B-BHigh winds
Enforcement Discretion
ML23129A0168 May 2023Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Stolen
ML23128A2888 May 2023TVA Nuclear Plants -2022 EOC Media SlidesOpen House
IR 05000327/20230012 May 2023Integrated Inspection Report 05000327/2023001 and 05000328/2023001 and Exercise of Enforcement DiscretionBoric Acid
High Radiation Area
Internal Flooding
Past operability
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
Downpower
CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update27 April 2023Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update
ML23117A11627 April 2023Response to Follow-up Questions to TVAs Response to NRCs Request for Supplemental Information (Rsi) Related to August 4, 2022, Sequoyah ISFSI Exemption RequestNon-Destructive Examination
Nondestructive Examination
Exemption Request
CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 4127 April 2023Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41Fitness for Duty
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
Cyber Security
Process Control Program
Fire Protection Program
Grace period
ML23121A01827 April 2023Discharge Monitoring Report (Dmr), March 2023
ML23121A02327 April 2023Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-2, SW-3, SW-4, SW-6, SW-8, SW-9, and SW-13
PMNS20230549, Annual Assessment Virtual Meeting for the 2022 Assessment Period25 April 2023Annual Assessment Virtual Meeting for the 2022 Assessment Period
CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision24 April 2023Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure RevisionOffsite Dose Calculation Manual
IR 05000327/202344120 April 2023Final Significance Determination for a Security-Related Greater than Green Finding, Nov & Assessment Followup Letter, 05000327/2023441 & 05000328/2023441Affidavit
ML23184A03320 April 2023CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2, and 30-Day for Sequoyah Nuclear Plant, Unit 2
ML23107A23717 April 2023Annual Radioactive Effluent Release Report for 2022 Monitoring PeriodBoric Acid
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
PMNS20230446, Annual Assessment Public Poster Session and Openhouse Meeting17 April 2023Annual Assessment Public Poster Session and Openhouse MeetingOpen House
ML23103A19513 April 2023Cycle 26 Core Operating Limits Report Revision 0Shutdown Margin
Surveillance Frequency Control Program
IR 05000327/202340213 April 2023Security Baseline Inspection Report 05000327/2023402 and 05000328/2023402
CNL-23-012, Revision to the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02)11 April 2023Revision to the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02)
CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions11 April 2023Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
ML23072A0655 April 2023Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12Anticipated operational occurrence
Cyber Security
Pressure and Temperature Limits Report
Fire Protection Program
ML23093A0244 April 2023Nuclear Plant, Units 1 and 2 - Notification of Inspection and Request for Information for NRC Problem Identification and Resolution InspectionProbabilistic Risk Assessment
Operator Manual Action
Maintenance Rule Program