Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML14135A34923 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant AccidentUnanalyzed Condition
Fukushima Dai-Ichi
Earthquake
Press Release-IV-14-013, NRC Names Senior Resident Inspector at Waterford 3 Nuclear Plant20 June 2014Press Release-IV-14-013: NRC Names Senior Resident Inspector at Waterford 3 Nuclear PlantNew Resident Inspector
ML14177A76019 June 2014FOIA 2014-0264 - Billed Inspection Hours Disaggregated by Both Plant and Year FY1994-2014
ML14171A35612 June 2014Masoneilan Actuators Discovered to Fail-Closed Instead of the Required Fail-Open ConfigurationUnanalyzed Condition
Fitness for Duty
W3F1-2014-0025, Updated Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR)11 June 2014Updated Responses to Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR)Hot Short
Safe Shutdown
High winds
Ultimate heat sink
Mission time
Fire Barrier
Safe Shutdown Earthquake
Enforcement Discretion
Probabilistic Risk Assessment
Fire impairment
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Thermoset
Large early release frequency
Severe Accident Management Guideline
Hemyc
Earthquake
Maintenance Rule Program
Power Operated Valves
Fire Protection Program
Fire Watch
TAC:MF427810 June 2014
CNRO-2014-00007, ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments10 June 2014ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments
ML14170A0139 June 2014Part 21 (Event 50025) - Barton Model 288A and 289A Differential Pressure Switch Defect
ML14141A43521 May 2014NRR E-mail Capture - NRC Acceptance Review for LAR W3F1-2013-0043
IR 05000382/201430115 May 2014Er 05000382-14-301; 04/02/2014 - 04/22/2014; Waterford Steam Electric Station, Unit 3; Initial Operator Licensing Examination Report
W3F1-2014-0033, Core Operating Limits Report Cycle 20 Revision 0, Waterford Steam Electric Station, Unit 312 May 2014Core Operating Limits Report Cycle 20 Revision 0, Waterford Steam Electric Station, Unit 3Shutdown Margin
Coatings
ML14111A1479 May 2014Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of InsightsSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Earthquake
Backfit
IR 05000382/20140028 May 2014IR 05000382-14-002, 01/01/2014 - 03/31/2014, Waterford, Unit 3, Integrated Inspection of Equipment Alignment, Maintenance Effectiveness, Operability Determinations and Functionality Assessments, and Problem Identification and ResolutionSafe Shutdown
Unanalyzed Condition
Ultimate heat sink
Mission time
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Significance Determination Process
Large early release frequency
Operability Determination
Fire Protection Program
Fire Watch
Hourly Fire Watch
Power change
ML14049A2908 May 2014Withdrawal of Relief Request W3-ISI-022, from ASME Code, Section XI Based on Code Case N-805 System Leakage Testing of Rv Head Flange O-Ring Leak Detection System, for the Third 10-year ISI Interval
ML14087A1818 May 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML14129A35029 April 2014Report of Facility Changes, Tests and Experiments and Commitment Changes for Two Year Period Ending April 25, 2014Safe Shutdown
Shutdown Margin
Ultimate heat sink
Mission time
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Temporary Modification
Emergency Lighting
Functionality Assessment
B.5.b
Operability Determination
Time Critical Operator Action
Fuel cladding
Scaffolding
Unidentified leakage
Unidentified leak
Power Uprate
W3F1-2014-0031, Submittal of Annual Radiological Effluent Release Report-201329 April 2014Submittal of Annual Radiological Effluent Release Report-2013Boric Acid
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
TAC:MF272629 April 2014
TAC:MF406428 April 2014
W3F1-2014-0030, Annual Radiological Environmental Operating Report 201328 April 2014Annual Radiological Environmental Operating Report 2013Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Earthquake
Chernobyl
TAC:MF407125 April 2014
CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G25 April 2014Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
ML14119A01125 April 2014NRR E-mail Capture - NRC Acceptance Review for LAR to Address Multiple Administrative Issues with the Technical Specifications
ML14119A01025 April 2014NRR E-mail Capture - NRC Acceptance Review for Reactor Vessel Internals Aging Management Program Consistent with MRP-227-AAging Management
ML14140A15914 April 20142014-04 Public Forms
ML14101A46711 April 2014(Waterford 3)- Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation
W3F1-2014-0026, Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation11 April 2014Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation
TAC:MF388810 April 2014
ML14099A11210 April 2014Discussion Points for Telephone Conference on 4/21/14 for Upcoming Steam Generator Tube Inservice Inspection
ML14107A1619 April 2014Qualtech Np Response to 10CFR Part 21 Notification on Allen Bradley Timing Relays, Event # 49911, Docket No. 99901414
ML14140A1537 April 20142014-04 Final Operating TestBoric Acid
Shutdown Margin
Met Tower
Emergency Lighting
Job Performance Measure
Power change
Downpower
ML14119A3767 April 20142014-04- Post Exam Comments
CNRO-2014-00004, Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/20143 April 2014Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/2014
ML14119A3662 April 20142014/04 Final Written ExamBoric Acid
Shutdown Margin
Ultimate heat sink
Time to boil
ML14140A1272 April 201404- Draft Operating TestBoric Acid
Shutdown Margin
Emergency Lighting
Job Performance Measure
Power change
ML14140A1442 April 201404-FINAL OutlinesBoric Acid
Shutdown Margin
Emergency Lighting
Severe Accident Management Guideline
Offsite Circuit
Power change
ML14140A1352 April 20142014-04 - Draft Operating Test Comments
ML14093A0932 April 2014Follow-Up Assessment Letter for Waterford Steam Electric Station, Unit 3
ML14140A1112 April 201404- Draft OutlinesBoric Acid
Shutdown Margin
Severe Accident Management Guideline
Power change
ML14140A1152 April 201404 Draft Outline Comments
ML14140A1192 April 20142014/04-Draft Written Exam
ML14140A1232 April 201404 Draft Written Exam Comments