Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML12256A995 | 30 June 2011 | Report of Independent Auditors and Combined Financial Statements for Southern California Public Power Authority | Earthquake |
ML12256A996 | 30 June 2011 | Los Angeles Department of Water and Power, Power System, Financial Statements and Required Supplementary Information, June 30, 2011 and 2010, (with Independent Auditors' Report Thereon) | |
ML13081A102 | 30 June 2011 | Updated Final Safety Analysis Report, Revision 16. Chapter 15, Accident Analyses. | Safe Shutdown Boric Acid Shutdown Margin Anticipated operational occurrence Fuel cladding Power change Coast down Power Uprate |
ML13081A098 | 30 June 2011 | Updated Final Safety Analysis Report, Revision 16. Chapter 10, Steam & Power Conversion System. | Safe Shutdown Boric Acid Offsite Dose Calculation Manual Safe Shutdown Earthquake Hydrostatic Tornado Generated Missile Tornado Missile Protection Earthquake Power-Operated Valves |
ML13081A097 | 30 June 2011 | Updated Final Safety Analysis Report, Revision 16. Chapter/Section 9.3, Process Auxiliaries. | Safe Shutdown Boric Acid Shutdown Margin Loop seal High Radiation Area Grab sample Offsite Dose Calculation Manual Hydrostatic Excess Flow Check Valve Earthquake Fuel cladding Power change |
ML13081A096 | 30 June 2011 | Updated Final Safety Analysis Report, Revision 16. Chapter 7, Instrumentation & Controls. | Safe Shutdown Boric Acid Shutdown Margin Fire Barrier Anticipated operational occurrence Post Accident Monitoring Design basis earthquake Fuel cladding Power change |
ML111801096 | 29 June 2011 | Diablo, Units 1 and 2, Canyon, Palo Verde, Units 1,2, and 3, Generic Fundamentals Examination Results | Generic Fundamentals Examination |
ML111801200 | 29 June 2011 | E-mail, Request for Additional Information Steam Generator Tube Inspection Report During Refueling Outage 15 | |
ML11180A241 | 29 June 2011 | Letter - OI Closure of Investigation OI-4-2010-019 | |
ML11189A095 | 29 June 2011 | Independent Spent Fuel Storage Installation (ISFSI) - Submittal of 10 CFR 50.59, 10 CFR 72.48, and Commitment Change Reports (January 2010 - December 2010) | |
ML11189A036 | 29 June 2011 | Submittal of Revised Request for Approval of the PVNGS Cyber Security Plan | Safe Shutdown Cyber Security Safeguards Contingency Plan License Renewal Fire Protection Program |
TAC:ME7805 | 27 June 2011 | ||
ML11188A196 | 24 June 2011 | Response to Regulatory Issues Summary (RIS) 2011-04, Preparation and Scheduling of Operator Licensing Examinations. | Generic Fundamentals Examination |
ML11182A908 | 22 June 2011 | Request for Amendment to Technical Specification 3.7.4, Atmospheric Dump Valves (Advs). | Safe Shutdown Boric Acid Safe Shutdown Earthquake Probabilistic Risk Assessment Earthquake |
ML111720743 | 21 June 2011 | Individual Notice of Consideration of Issuance of Amendment, Revise Updated Final Safety Analysis Report, Feedwater Line Break Analysis with LOOP and Single Failure Analysis | Exemption Request |
NRC-2011-0142, Individual Notice of Consideration of Issuance of Amendment, Revise Updated Final Safety Analysis Report, Feedwater Line Break Analysis with LOOP and Single Failure Analysis (TAC Nos. ME4596, ME4597, ME4598) | 21 June 2011 | Individual Notice of Consideration of Issuance of Amendment, Revise Updated Final Safety Analysis Report, Feedwater Line Break Analysis with LOOP and Single Failure Analysis (TAC Nos. ME4596, ME4597, ME4598) | Exemption Request |
ML111720673 | 21 June 2011 | Letter, Individual Notice of Consideration of Issuance of Amendment, Revise Updated Final Safety Analysis Report, Feedwater Line Break Analysis with LOOP and Single Failure Analysis | Exemption Request |
ML11151A195 | 20 June 2011 | Notice of Issuance of Renewed Facility Operating License for an Additional 20-Year Period, Record of Decision | License Renewal |
ML111680042 | 20 June 2011 | Review of the 2010 Steam Generator Tube Inspections During Refueling Outage 15 | |
ML111672185 | 16 June 2011 | Email Regarding Extension on Response Time for Request for Additional Information on Decommissioning Funds Status Report | |
ML11173A060 | 10 June 2011 | 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies | B.5.b Mitigating Strategies |
ML111530214 | 2 June 2011 | Request for Additional Information, Review of Biennial Decommissioning Funding Status Report | |
ML111570491 | 2 June 2011 | Meeting Summary for Public Meeting with Arizona Public Service to Discuss the Performance Results for Palo Verde, Units 1, 2 and 3 for the Period of January 1 Through December 31, 2010 | Open House |
ML111530199 | 2 June 2011 | Email, Request for Additional Information, Review of Biennial Decommissioning Funding Status Report | |
ML11154A127 | 1 June 2011 | Annual Report of Guarantee of Payment of Deferred Premium | |
NRC-2011-0058, Comment (9) of Thomas N. Weber on Behalf of Arizona Public Service Company, on Proposed Rule PR-26, Alternative to Minimum Days Off Requirements | 27 May 2011 | Comment (9) of Thomas N. Weber on Behalf of Arizona Public Service Company, on Proposed Rule PR-26, Alternative to Minimum Days Off Requirements | Enforcement Discretion |
ML11159A029 | 25 May 2011 | Response to the Second Request for Additional Information Regarding License Amendment Request to Revise the Feedwater Line Break with Loss of Offsite Power & Single Failure Analysis | |
ML11146A032 | 13 May 2011 | Annual Radiological Environmental Operating Report 2010 | Boric Acid Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
IR 05000528/2011006 | 13 May 2011 | on 03/23/11 - 04/29/11 Temporary Instruction 2515/183 Inspection Report 05000528/2011006, 05000529/2011006, and 05000530/2011006 | Safe Shutdown Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment B.5.b Severe Accident Management Guideline |
IR 05000528/2011002 | 12 May 2011 | IR 05000528-11-002, 05000529-11-002, 05000530-11-002, on 01/01/11 - 03/31/11; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Operability Evaluations, Radioactive Gaseous & Liquid Effluent Treatment, Event Followup | High Radiation Area Offsite Dose Calculation Manual Weld Overlay Internal Flooding Coatings Nondestructive Examination Significance Determination Process Process Control Program Operability Determination Code Reconciliation Fire Protection Program Substantial potential for an overexposure Power change Downpower Coast down Overexposure |
ML111310140 | 11 May 2011 | Acceptance Review Email, Adoption of Technical Specification Task Force (TSTF)-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b | Surveillance Frequency Control Program |
IR 05000528/2011403 | 9 May 2011 | IR 05000528-11-403, 05000529-11-403 & 05000530-11-403, on 04/15/2011, Palo Verde; NRC Security Inspection Report | Affidavit |
ML110980538 | 9 May 2011 | Cyber Security Plan Implementation Schedule | Cyber Security |
ML111290772 | 5 May 2011 | Notification of NRC Initial Operator Licensing Examination 05000528/2012301; 05000529/2012301; 05000530/2012301 | |
ML11136A106 | 5 May 2011 | Submittal of Steam Generator Tube Inspection Report | |
Press Release-IV-11-017, NRC to Hold Open House to Discuss 2010 Performance for Palo Verde Nuclear Generating Station | 3 May 2011 | Press Release-IV-11-017: NRC to Hold Open House to Discuss 2010 Performance for Palo Verde Nuclear Generating Station | Open House |
ML11095A011 | 30 April 2011 | NUREG-1961 Safety Evaluation Report Related to the License Renewal of Palo Verde Nuclear Generating Station, Units 1,2 and 3. | |
TAC:ME7751 | 30 April 2011 | ||
ML111190066 | 29 April 2011 | 3/27/11 Correction to Summary of Pre-Licensing Meeting with Arizona Public Service Company to Discuss Potential Submittal to Revise Technical Specification 3.7.4, Atmospheric Dump Valves, for Palo Verde, Units 1, 2, and 3 (TAC Nos. ME5233-M | |
ML11136A042 | 29 April 2011 | Submittal of Annual Radioactive Effluent Release Report 2010 | Boric Acid Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML11129A031 | 27 April 2011 | Unit 2 Core Operating Limits Report (Colr), Revision 17 | Shutdown Margin |
ML110890816 | 27 April 2011 | 3/29/2011 Summary of Pre-Licensing Meeting with Arizona Public Service Company to Discuss Potential Submittal to Revise Technical Specification 3.7.4, Atmospheric Dump Valves, for Palo Verde, Units 1, 2, and 3 | |
ML111160544 | 26 April 2011 | E-mail, Revised Draft Request for Additional Information on Revision of Feedwater Line Break with Loss of Offsite Power and Single Failure Analysis | |
ML111160554 | 26 April 2011 | E-mail, Revised Draft Request for Additional Information on Revision of Feedwater Line Break with Loss of Offsite Power and Single Failure Analysis | |
ML11129A030 | 26 April 2011 | 2010 Annual Environmental Operating Report | |
ML11129A029 | 26 April 2011 | Independent Spent Fuel Storage Installation (Isfsi), Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance | |
ML111160162 | 25 April 2011 | Notice of Public Meeting with Arizona Public Service Company, to Present and Discuss Performance Results of Palo Verde for Period of January 1 Through December 31, 2010 | |
ML111250573 | 22 April 2011 | Response to NRC Draft Request for Additional Information 2010 Steam Generator Tube Inspections | |
ML111250572 | 22 April 2011 | Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for Calendar Year 2010 | |
ML111250568 | 22 April 2011 | Individual Monitoring Reports for 2010 |