ML11188A196
| ML11188A196 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/24/2011 |
| From: | Weber T Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 102-06371-TNW/DFH, RIS 2011-04, RIS-11-004 | |
| Download: ML11188A196 (2) | |
Text
RIS 2011-04 Palo Verde Nuclear Generating Station Thomas N. Weber Department Leader Regulatory Affairs Tel. 623-393-5764 Fax 623-393-5442 Mail Station 7636 PO Box 52034 Phoenix, Arizona 85072-2034 102-06371-TNW/DFH June 24, 2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, & 3 Docket Nos. STN 50-528/529/530 Response to Regulatory Issues Summary (RIS) 2011-04, "Preparation and Scheduling of Operator Licensing Examinations" This letter is Arizona Public Service Company's (APS) voluntary response to RIS 2011-04, "Preparation and Scheduling of Operator Licensing Examinations."
Attached to this letter is NRC Form 536 which provides Palo Verde's proposed schedule of examinations estimated for calendar years 2013 through 2016.
There are no commitments made to the NRC by this letter.
Please contact Ms. Marianne Webb (623) 393-5730 if you have any questions or would like additional information regarding this matter.
Sincerely, TNW/MNW/DFH/gt Attachment - NRC Form 536 cc:
E. E. Collins Jr.
M. S. Haire L. A. Hurley L. K. Gibson J. R. Hall M. A. Brown NRC Region IV, Regional Administrator NRC Region IV, Chief, Operations Branch NRC Region IV, Licensing Assistant, Operations Branch NRC NRR Project Manager for PVNGS (electronic / paper)
NRC NRR Senior Project Manager (electronic / paper)
NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde ° San Onofre ° South Texas ° Wolf Creek ci"
ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Response to RIS 2011-04 Pg. 2 Attachment NRC FORM 536 lO-?'Ool)
U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO-3150-0131 EXPIRES: 1013112011 Estimated burden per response to comply with this voluntary information collection request: I hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOItAPrivacy Services Branch (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemel e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202. (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC maý not conduct or sponsor, and a person is not required to respond to. the information collection.
i Palo Verde Nuclear Generating Station 50-528, 50-529, 50-530 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 Cy 20 14 Cy 2015 Cy 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 1
EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 Cy 201 4 CY 2 0 1 5 CY 2 0 16 NUMBER OF REACTOR 14 0
14 14 OPERATORS NUMBER OF SENIOR REACTOR 0
OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 09/16/2013 03116/2015 09/19/2016 ALTERNATE DATE 03/23/2015 09/26/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I
NRC FORM 536 (113-21308)
PRINTED ON RECYCLED PAPER