Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09176076424 June 2009Phase 3 Potential Loss of RHR Due to Inadequate Cooling of Suction Line During Mode 4 to Mode 3 Transition at Wolf CreekFitness for Duty
Time to boil
Probabilistic Risk Assessment
Significance Determination Process
IR 05000482/200940224 June 2009NRC Security Inspection Report 05000482-09-402, Investigation Report 4-2009-007Significance Determination Process
Affidavit
Press Release-IV-09-022, NRC Names New Resident Inspector at Wolf Creek Generating Station19 June 2009Press Release-IV-09-022: NRC Names New Resident Inspector at Wolf Creek Generating StationNew Resident Inspector
ML09168043617 June 2009Acknowledgement of Receipt of Letter 06/12/09 Response to Notice of Violation
ML09170002612 June 2009Comment (1) of T. A. Moser, on Behalf of Strategic Teaming & Resource Sharing (Stars) Alliance, on Draft Regulatory Guide DG-1211, Materials and Inspections for Reactor Vessel Closure Studs.
WM 09-0040, Reply to Notice of Violation EA-09-11012 June 2009Reply to Notice of Violation EA-09-110
ML11069113211 June 2009E-mail from B. Metzger, NRR to D. Frumkin, NRR on Distribution of OMAs
IR 05000482/20090029 June 2009NRC Integrated Inspection Report 05000482-09-002 ErrataSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Fire Barrier
Tornado-Generated Missile
Fire Protection Program
ML0915902218 June 2009Acceptance Review Email, License Amendment Request, Revise Technical Specifications 5.5.9, Steam Generator Program, and 5.6.10, Steam Generator Tube Inspection Report, for Permanent Alternate Repair Criteria
ML0915305782 June 2009Notice of Meeting with Wolf Creek Nuclear Operation Corporation, to Present Updates on Initiatives Implemented to Improve Problem Identification and Resolution and Human Performance
ET 09-0016, Revision to Technical Specifications 5.5.9, Steam Generator (SG) Program, and TS 5.6.10, Steam Generator Tube Inspection Report, for a Permanent Alternate Repair Criterion2 June 2009Revision to Technical Specifications 5.5.9, Steam Generator (SG) Program, and TS 5.6.10, Steam Generator Tube Inspection Report, for a Permanent Alternate Repair CriterionPost Accident Monitoring
Hydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
Coast down
TAC:ME03521 June 2009
ML0915205301 June 2009G20090007/OEDO-2009-0007 -Email Record of 6/1/09 Phone Call with Tom Lakosh, Informing of Prb'S Initial Recommendation to Reject Petition Request Pursuant 10 CFR 2.206 Reactors Near Yellowstone Caldera Eruptions Response Due by 6/8/09High winds
Probabilistic Risk Assessment
Earthquake
ML11069128522 May 2009E-mail from D. Frumkin, NRR to B. Metzger, NRR FW: Support for Manual Action Exemption Reviews
WO 09-0011, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 422 May 2009Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 4
ML09096073415 May 2009Issuance of Amendment No. 182, Revise Technical Specification 3.5.2, ECCS - Operating, in Accordance with TSTF-325A, ECCS Conditions and Required Actions with <100% Equivalent ECCS Flow
ML09134030914 May 2009Operating Corporation -Notification of Inspection 05-000482-09-004 and Request for InformationCommercial Grade Dedication
ML09134006113 May 2009IR 05000482-09-002, on 1/01 - 3/31/2009; Wolf Creek Generating Plant, Integrated Resident and Regional Report; Adverse Weather, Fire Protection, Maintenance Effectiveness, Surveillance Testing, Problem Identification and Resolution, Other ASafe Shutdown
Boric Acid
High winds
Shutdown Margin
Fire Barrier
Probabilistic Risk Assessment
Temporary Modification
Condition Adverse to Quality
Tornado Generated Missile
Significance Determination Process
Foreign Material Exclusion
Fire Protection Program
Power change
ML09133002313 May 2009Meeting Slides, Successful Licensing of the Als Fpga Based Safety Related I&C PlatformCyber Security
ML0913903427 May 2009Transmittal of 2008 Annual Financial ReportsIncorporated by reference
ML0912600696 May 2009Lessons Learned Using Digital I&C Interim Staff Guidance WorkshopCyber Security
ML0912600766 May 2009Lessons Learned Using Digital I&C Interim Staff Guidance Workshop Application of ISG-4 During Wolf Creek and Oconee Reviews
TAC:ME139330 April 2009
ML09128026630 April 2009Submittal of Annual Radioactive Effluent Release Report No. 32 for Period from January 1, 2008 Through December 31, 2008Boric Acid
Grab sample
Offsite Dose Calculation Manual
Missed surveillance
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML09159016730 April 2009Enclosure II - Westinghouse Electric Company LLC, WCAP-17071-NP, H*: Alternate Repair Criteria for the Resrad Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F)
ET 09-0014, Response to Request for Additional Information Regarding 10 CFR 50.55a Request I3R-0623 April 2009Response to Request for Additional Information Regarding 10 CFR 50.55a Request I3R-06VT-2
Dissimilar Metal Weld
ML09113004622 April 2009Ltr to Terry Garrett Re Participation in Public Commission Meeting on the Use of Digital Instrumentation and Control (I&C) in the Nuclear Power Industry Scheduled on 06/04/2009
ML09118057821 April 20092008 Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML09112052821 April 2009Summary of Annual Performance Assessment Meeting for Wolf Creek Generating Station