Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
HNP-09-067, Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.7.5a, Ultimate Heat Sink Main Reservoir Minimum Level30 June 2009Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.7.5a, Ultimate Heat Sink Main Reservoir Minimum LevelSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Earthquake
ML09180045329 June 2009Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development WorkshopLicense Renewal
ML09176035925 June 2009NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, June 2009
ML09179000425 June 2009Public Letter - Dam Safety and Operation Inspection ReportSafe Shutdown
HNP-09-070, NRC Correspondence Distribution List Update25 June 2009NRC Correspondence Distribution List Update
ML09166050424 June 200904/21-22/2009 Summary of Category 2 Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition Shearon, Unit 1 and Oconee to NFPA 805Hot Short
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Continuous fire watch
Fire Watch
ML09174054523 June 2009Notification of Inspection and Request for Information for NRC Problem Identification and Resolution InspectionProbabilistic Risk Assessment
Operator Manual Action
Temporary Modification
Operability Determination
Maintenance Rule Program
IR 05000400/200940219 June 2009IR 05000400-09-402, on 05/21/2009, Shearon Harris Nuclear Power Plant - NRC Security InspectionAffidavit
ML09128009511 June 2009Additional Request for Additional Information Regarding Amendment to Lower the Minimum Allowed Level of the Ultimate Heat Sink Main ReservoirUltimate heat sink
ML09160028111 June 2009Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a HearingProbabilistic Risk Assessment
Fire Protection Program
ML0912702385 June 2009Request for Additional Information Regarding Amendment to Remove Credit for Boraflex in BWR Spent Fuel Pool Storage Racks
ML0915905555 June 2009Summary of Category 1 Public Meeting to Discuss Annual Assessment of Shearon Harris Nuclear Plant, Unit 1B.5.b
ML0916101893 June 2009NFPA 805 Transition Pilot Plant FAQ 07-0035, Revision 2, Bus Duct Counting Guidance for High Energy Arcing FaultsCoast down
ML12285A2042 June 2009FEMA Shearon Harris Nuclear Power Plant, Final Exercise Report, Exercise Date - March 3, 2009Boric Acid
Mission time
Siren
ML09215005431 May 2009ANP-2693(NP), Revision 0, Loss of Forced Reactor Coolant Flow Analysis for Harris Nuclear Plant, Unit 1, Enclosure 4 to Serial: HNP-09-068Fuel cladding
Coast down
TAC:ME173531 May 2009
ML09149031429 May 2009Carolina Power and Light, May 22, 2009, Public Meeting Summary Regarding Brunswick Steam Electric Plant Performance and Organizational Alignment within the CompanyLicense Renewal
Power change
ML09096043628 May 2009Lessons from Regulatory Audits of the Pilot Plants That Are Transitioning to a Fire Protection Licensing Basis Based on the National Fire Protection Association (NFPA) Standard NFPA 805 as Allowed by 10 CFR 5.48 (C)Safe Shutdown
Probabilistic Risk Assessment
Large early release frequency
Fire Protection Program
Press Release-II-09-031, NRC Schedules Meeting to Discuss 2008 Performance of Harris Nuclear Power Plant27 May 2009Press Release-II-09-031: NRC Schedules Meeting to Discuss 2008 Performance of Harris Nuclear Power PlantOpen House
HNP-09-056, Non-Security Sensitive Version of Original Request for License Amendment to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)22 May 2009Non-Security Sensitive Version of Original Request for License Amendment to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)Safe Shutdown
Fire Barrier
Time to boil
Emergency Lighting
Hemyc
Exemption Request
Earthquake
Power Operated Valves
Fire Protection Program
Fire Watch
ML09142012921 May 2009NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, May 2009
ML09127018819 May 2009Acceptance Review Regarding Relief Requests on Final Documentation for the Second 10-Year Inservice Inspection Program for Limited Coverage of Welds in Multiple Exam Categories
TAC:ME072815 May 2009
ML09127056915 May 2009Acceptance Review Re Amendment to Adopt Tech Spec Task Force (TSTF) Standard Tech Spec Change Traveler, TSTF-447, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors
ML10194021814 May 2009Monitoring Well Map and Results
ML0912708877 May 2009Notice of Category 1 Public Meeting with Carolina Power & Light Co., to Discuss the NRC Reactor Oversight Process Annual Assessment of Harris Nuclear PlantOpen House
ML0912708617 May 2009Notice of Category 1 Public Meeting with Carolina Power & Light and Florida Power Corp., Regarding Brunswick Performance and Organizational Alignment within the CompanyLicense Renewal
ML0910301737 May 2009Issuance of Amendments Regarding Elimination of Work Hour Controls to Support Compliance with Revised Part 26 of Title 10 of Code of Federal Regulations
TAC:MD98157 May 2009
IR 05000400/20093011 May 2009Er 05000400-09-301, on March 9-18, 2009 & March 20, Shearon Harris Nuclear Power Plant, Operator License ExaminationsShutdown Margin
ML10203016030 April 2009Cooling Tower Blowdown Line Assessment Report, Shearon Harris Nuclear Power Plant
ML09111030130 April 2009Request for Relief No.13R-02 for the Third 10-Year Inservice Inspection Interval Regarding the Continued Use of a Risk-Informed Inservice Inspection ProgramProbabilistic Risk Assessment
Large early release frequency
Stress corrosion cracking
Dissimilar Metal Weld
ML09099050529 April 200903/20/09 Summary of Site Audit to Support the Review of a License Amendment Request for Shearon Harris to Transition to the National Fire Protection Association Standard 805 Fire Protection Licensing BasisProbabilistic Risk Assessment
TAC:MD039029 April 2009
ML09099051129 April 2009Enclosure 1: Shearon Harris Regulatory Audit Participants
ML10194022129 April 2009Email from Wade Loo to Brian Bonser and Randy Musser; Cc: Ruben Hamilton, George Kuzo, Donald Forbes, Patrick Lessard, Joseph Austin and Jannette Worosilo Subject: Update on Groundwater Monitoring/Blowdon Line at Harris
ML09099052329 April 2009Enclosure 2: Shearon Harris Regulatory Audit - Documents ReviewedSafe Shutdown
Fire Protection Program
HNP-09-038, Annual Environmental (Nonradiological) Operating Report29 April 2009Annual Environmental (Nonradiological) Operating ReportLicense Renewal
Biofouling
IR 05000400/200900228 April 2009IR 05000400-09-002; January 1, 2009 - March 31, 2009; Shearon Harris Nuclear Power Plant, Unit 1; Routine Integrated ReportBoric Acid
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Job Performance Measure
Fire Protection Program
Power change
Operability Assessment
HNP-09-040, Annual Radiological Environmental Operating Report for 200828 April 2009Annual Radiological Environmental Operating Report for 2008Grab sample
Offsite Dose Calculation Manual
Missed surveillance
Annual Radiological Environmental Operating Report
Chernobyl
HNP-09-049, Submittal of Cycle 16 Core Operating Limits Report27 April 2009Submittal of Cycle 16 Core Operating Limits ReportShutdown Margin
HNP-09-039, Annual Radioactive Effluent Release Report for 200826 April 2009Annual Radioactive Effluent Release Report for 2008Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Fuel cladding
Tritium
RA-09-004, Submittal of Evidence of Guarantee of Payment of Deferred Premiums23 April 2009Submittal of Evidence of Guarantee of Payment of Deferred PremiumsAffidavit
HNP-09-048, Submittal of Emergency Core Cooling System Evaluation Changes Annual and 30 Day Reports17 April 2009Submittal of Emergency Core Cooling System Evaluation Changes Annual and 30 Day Reports
HNP-09-044, Submittal of Cycle 15 Core Operating Limits Report - Revision 115 April 2009Submittal of Cycle 15 Core Operating Limits Report - Revision 1Shutdown Margin
ML10194021612 April 2009Offsite Notification to State/Local Agencies Regarding Tritium Release Onsite - EN 44951
ML10203016112 April 2009Tritium Concern Talking Points
ML09099001810 April 200904/21-22/2009, Notice of Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition the Shearon, Unit 1 and the Oconee, Units 1, 2 and 3Probabilistic Risk Assessment
Operator Manual Action
ML0909305003 April 2009Afpb Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0035, Revision 1Coast down
ML1020301721 April 2009Tritium Questions and AnswersExit Sign