Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
HNP-09-067, Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.7.5a, Ultimate Heat Sink Main Reservoir Minimum Level | 30 June 2009 | Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.7.5a, Ultimate Heat Sink Main Reservoir Minimum Level | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Earthquake |
ML091800453 | 29 June 2009 | Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development Workshop | License Renewal |
ML091760359 | 25 June 2009 | NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, June 2009 | |
ML091790004 | 25 June 2009 | Public Letter - Dam Safety and Operation Inspection Report | Safe Shutdown |
HNP-09-070, NRC Correspondence Distribution List Update | 25 June 2009 | NRC Correspondence Distribution List Update | |
ML091660504 | 24 June 2009 | 04/21-22/2009 Summary of Category 2 Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition Shearon, Unit 1 and Oconee to NFPA 805 | Hot Short Probabilistic Risk Assessment Operator Manual Action Multiple Spurious Operation Continuous fire watch Fire Watch |
ML091740545 | 23 June 2009 | Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection | Probabilistic Risk Assessment Operator Manual Action Temporary Modification Operability Determination Maintenance Rule Program |
IR 05000400/2009402 | 19 June 2009 | IR 05000400-09-402, on 05/21/2009, Shearon Harris Nuclear Power Plant - NRC Security Inspection | Affidavit |
ML091280095 | 11 June 2009 | Additional Request for Additional Information Regarding Amendment to Lower the Minimum Allowed Level of the Ultimate Heat Sink Main Reservoir | Ultimate heat sink |
ML091600281 | 11 June 2009 | Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing | Probabilistic Risk Assessment Fire Protection Program |
ML091270238 | 5 June 2009 | Request for Additional Information Regarding Amendment to Remove Credit for Boraflex in BWR Spent Fuel Pool Storage Racks | |
ML091590555 | 5 June 2009 | Summary of Category 1 Public Meeting to Discuss Annual Assessment of Shearon Harris Nuclear Plant, Unit 1 | B.5.b |
ML091610189 | 3 June 2009 | NFPA 805 Transition Pilot Plant FAQ 07-0035, Revision 2, Bus Duct Counting Guidance for High Energy Arcing Faults | Coast down |
ML12285A204 | 2 June 2009 | FEMA Shearon Harris Nuclear Power Plant, Final Exercise Report, Exercise Date - March 3, 2009 | Boric Acid Mission time Siren |
ML092150054 | 31 May 2009 | ANP-2693(NP), Revision 0, Loss of Forced Reactor Coolant Flow Analysis for Harris Nuclear Plant, Unit 1, Enclosure 4 to Serial: HNP-09-068 | Fuel cladding Coast down |
TAC:ME1735 | 31 May 2009 | ||
ML091490314 | 29 May 2009 | Carolina Power and Light, May 22, 2009, Public Meeting Summary Regarding Brunswick Steam Electric Plant Performance and Organizational Alignment within the Company | License Renewal Power change |
ML090960436 | 28 May 2009 | Lessons from Regulatory Audits of the Pilot Plants That Are Transitioning to a Fire Protection Licensing Basis Based on the National Fire Protection Association (NFPA) Standard NFPA 805 as Allowed by 10 CFR 5.48 (C) | Safe Shutdown Probabilistic Risk Assessment Large early release frequency Fire Protection Program |
Press Release-II-09-031, NRC Schedules Meeting to Discuss 2008 Performance of Harris Nuclear Power Plant | 27 May 2009 | Press Release-II-09-031: NRC Schedules Meeting to Discuss 2008 Performance of Harris Nuclear Power Plant | Open House |
HNP-09-056, Non-Security Sensitive Version of Original Request for License Amendment to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) | 22 May 2009 | Non-Security Sensitive Version of Original Request for License Amendment to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) | Safe Shutdown Fire Barrier Time to boil Emergency Lighting Hemyc Exemption Request Earthquake Power Operated Valves Fire Protection Program Fire Watch |
ML091420129 | 21 May 2009 | NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, May 2009 | |
ML091270188 | 19 May 2009 | Acceptance Review Regarding Relief Requests on Final Documentation for the Second 10-Year Inservice Inspection Program for Limited Coverage of Welds in Multiple Exam Categories | |
TAC:ME0728 | 15 May 2009 | ||
ML091270569 | 15 May 2009 | Acceptance Review Re Amendment to Adopt Tech Spec Task Force (TSTF) Standard Tech Spec Change Traveler, TSTF-447, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors | |
ML101940218 | 14 May 2009 | Monitoring Well Map and Results | |
ML091270887 | 7 May 2009 | Notice of Category 1 Public Meeting with Carolina Power & Light Co., to Discuss the NRC Reactor Oversight Process Annual Assessment of Harris Nuclear Plant | Open House |
ML091270861 | 7 May 2009 | Notice of Category 1 Public Meeting with Carolina Power & Light and Florida Power Corp., Regarding Brunswick Performance and Organizational Alignment within the Company | License Renewal |
ML091030173 | 7 May 2009 | Issuance of Amendments Regarding Elimination of Work Hour Controls to Support Compliance with Revised Part 26 of Title 10 of Code of Federal Regulations | |
TAC:MD9815 | 7 May 2009 | ||
IR 05000400/2009301 | 1 May 2009 | Er 05000400-09-301, on March 9-18, 2009 & March 20, Shearon Harris Nuclear Power Plant, Operator License Examinations | Shutdown Margin |
ML102030160 | 30 April 2009 | Cooling Tower Blowdown Line Assessment Report, Shearon Harris Nuclear Power Plant | |
ML091110301 | 30 April 2009 | Request for Relief No.13R-02 for the Third 10-Year Inservice Inspection Interval Regarding the Continued Use of a Risk-Informed Inservice Inspection Program | Probabilistic Risk Assessment Large early release frequency Stress corrosion cracking Dissimilar Metal Weld |
ML090990505 | 29 April 2009 | 03/20/09 Summary of Site Audit to Support the Review of a License Amendment Request for Shearon Harris to Transition to the National Fire Protection Association Standard 805 Fire Protection Licensing Basis | Probabilistic Risk Assessment |
TAC:MD0390 | 29 April 2009 | ||
ML090990511 | 29 April 2009 | Enclosure 1: Shearon Harris Regulatory Audit Participants | |
ML101940221 | 29 April 2009 | Email from Wade Loo to Brian Bonser and Randy Musser; Cc: Ruben Hamilton, George Kuzo, Donald Forbes, Patrick Lessard, Joseph Austin and Jannette Worosilo Subject: Update on Groundwater Monitoring/Blowdon Line at Harris | |
ML090990523 | 29 April 2009 | Enclosure 2: Shearon Harris Regulatory Audit - Documents Reviewed | Safe Shutdown Fire Protection Program |
HNP-09-038, Annual Environmental (Nonradiological) Operating Report | 29 April 2009 | Annual Environmental (Nonradiological) Operating Report | License Renewal Biofouling |
IR 05000400/2009002 | 28 April 2009 | IR 05000400-09-002; January 1, 2009 - March 31, 2009; Shearon Harris Nuclear Power Plant, Unit 1; Routine Integrated Report | Boric Acid Probabilistic Risk Assessment Temporary Modification Significance Determination Process Job Performance Measure Fire Protection Program Power change Operability Assessment |
HNP-09-040, Annual Radiological Environmental Operating Report for 2008 | 28 April 2009 | Annual Radiological Environmental Operating Report for 2008 | Grab sample Offsite Dose Calculation Manual Missed surveillance Annual Radiological Environmental Operating Report Chernobyl |
HNP-09-049, Submittal of Cycle 16 Core Operating Limits Report | 27 April 2009 | Submittal of Cycle 16 Core Operating Limits Report | Shutdown Margin |
HNP-09-039, Annual Radioactive Effluent Release Report for 2008 | 26 April 2009 | Annual Radioactive Effluent Release Report for 2008 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Fuel cladding Tritium |
RA-09-004, Submittal of Evidence of Guarantee of Payment of Deferred Premiums | 23 April 2009 | Submittal of Evidence of Guarantee of Payment of Deferred Premiums | Affidavit |
HNP-09-048, Submittal of Emergency Core Cooling System Evaluation Changes Annual and 30 Day Reports | 17 April 2009 | Submittal of Emergency Core Cooling System Evaluation Changes Annual and 30 Day Reports | |
HNP-09-044, Submittal of Cycle 15 Core Operating Limits Report - Revision 1 | 15 April 2009 | Submittal of Cycle 15 Core Operating Limits Report - Revision 1 | Shutdown Margin |
ML101940216 | 12 April 2009 | Offsite Notification to State/Local Agencies Regarding Tritium Release Onsite - EN 44951 | |
ML102030161 | 12 April 2009 | Tritium Concern Talking Points | |
ML090990018 | 10 April 2009 | 04/21-22/2009, Notice of Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition the Shearon, Unit 1 and the Oconee, Units 1, 2 and 3 | Probabilistic Risk Assessment Operator Manual Action |
ML090930500 | 3 April 2009 | Afpb Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0035, Revision 1 | Coast down |
ML102030172 | 1 April 2009 | Tritium Questions and Answers | Exit Sign |