Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML08154028530 June 2008Technical Specifications, Measurement Uncertainty Recapture Power Uprate
ML08154028030 June 2008Issuance of Amendment Measurement Uncertainty Recapture Power UprateSafe Shutdown
Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Hydrostatic
Nondestructive Examination
Operator Manual Action
Abnormal operational transient
Earthquake
Turbine Missile
Fuel cladding
Fire Protection Program
Power change
Flow Induced Vibration
TAC:MD758830 June 2008
ML08178038330 June 2008Request for Additional Information Response to NRC Bulletin 2007-01, Security Officer Attentiveness
NLS2008047, Reply to Preliminary White Finding Regarding NRC Inspection Report 05000298-08-00219 June 2008Reply to Preliminary White Finding Regarding NRC Inspection Report 05000298-08-002Fitness for Duty
Emergency Lighting
Significance Determination Process
Large early release frequency
Preliminary White Finding
Press Release-IV-08-028, NRC to Provide Additional Oversight to Cooper Nuclear Station16 June 2008Press Release-IV-08-028: NRC to Provide Additional Oversight to Cooper Nuclear StationSafe Shutdown
IR 05000298/200800813 June 2008IR 05000298-08-008, on 03/19/2008 - 06/13/2008, for Cooper, Triennial Fire Protection Follow-up InspectionSafe Shutdown
Enforcement Discretion
Probabilistic Risk Assessment
Significance Determination Process
Fire Protection Program
Fire Watch
ML08165009013 June 2008IR 05000298-08-008, on 03/19/2008 - 06/13/2008, for Cooper, Triennial Fire Protection Follow-up InspectionSafe Shutdown
Enforcement Discretion
Probabilistic Risk Assessment
Significance Determination Process
Fire Protection Program
Fire Watch
ML08142005810 June 2008Correction to Amendment No. 230 Control Room Envelope Habitability License Pages 4 & 5 and SE Pages 3, 4, 8, and 9Safe Shutdown
Earthquake
ML08162015310 June 2008End-of-Cycle Meeting Summary 6/2/08
ML08162047210 June 2008EN-08-036, Issuance of Final Significance Determination and Notice of ViolationEnforcement Discretion
Significance Determination Process
NLS2008050, Transmittal of Annual Financial Report for Cy 20075 June 2008Transmittal of Annual Financial Report for Cy 2007Decommissioning Funding Plan
Fire Protection Program
IR 05000298/200840229 May 2008IR 05000298-08-402, on 05/12/2008 - 05/15/2008, for CooperAffidavit
ML08155010228 May 2008Meeting Summary for Regulatory Conference with Nebraska Public Power District to Discuss the Significance of an Inspection Finding Associated with Two Procedures That Were Not Adequate
Press Release-IV-08-023, NRC to Discuss 2007 Performance Assessment for Cooper Nuclear Plant20 May 2008Press Release-IV-08-023: NRC to Discuss 2007 Performance Assessment for Cooper Nuclear Plant
NLS2008040, Annual Radiological Environmental Report for the Period of January 1, 2007 Through December 31, 200715 May 2008Annual Radiological Environmental Report for the Period of January 1, 2007 Through December 31, 2007Chernobyl
TAC:MD777812 May 2008
ML08122028112 May 2008Issuance of Amendment No. 230 Control Room Habitability, TSTF-448Safe Shutdown
Functionality Assessment
Earthquake
ML08122028912 May 2008Technical Specification Pages for Issuance of Amendment No. 230 Control Room Habitability, TSTF-448Safe Shutdown
Fire Protection Program
ML08162042612 May 2008End of Cycle Public Invitational Letter 5-12-08
NLS2008046, Response to Request for Additional Information for License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate9 May 2008Response to Request for Additional Information for License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power UprateReactor Vessel Water Level
Fuel cladding
ML0815403778 May 2008Enclosure 1 - PRA 08004, Human Error Probability for Recoveries Associated with the Fire Protection Triennial Inspection Finding Related to RHR-MO-25BSafe Shutdown
Fitness for Duty
Emergency Lighting
NLS2008044, Additional Information for Consideration in Addressing Inspection Finding Cooper Nuclear Station8 May 2008Additional Information for Consideration in Addressing Inspection Finding Cooper Nuclear Station
ML0815403808 May 2008Enclosure 2, Design Calculation Cover Sheet, EPM Calculation 1906-07-06 Task 7.6 NFPA 805 Fire Ignition Fire Ignition Frequencies.Safe Shutdown
Loop seal
Fire Protection Program
Fire Watch
ML0812706396 May 2008IR 05000298-08-002; on 01/01/2008 - 03/22/2008; Cooper Nuclear Station. Plant Modifications and Postmaintenance TestingHot Short
Safe Shutdown
Mission time
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Scram Discharge Volume
Large early release frequency
Earthquake
Scaffolding
Uranium Hexafluoride
NLS2008038, Core Operating Limits Report, Cycle 25, Revision 06 May 2008Core Operating Limits Report, Cycle 25, Revision 0
ML0812705746 May 2008Notice of Public Meeting with Nebraska Public Power District to Present and Discuss Performance Results of Cooper Nuclear Station for 01/01/2007 Through 12/31/2007
ML0812200422 May 2008Request for Additional Information, Measurement Uncertainty Recapture Power Uprate
NLS2008039, Annual Radioactive Effluent Release Report, ODAM Submittal, and Summary of Changes to the Process Control Program1 May 2008Annual Radioactive Effluent Release Report, ODAM Submittal, and Summary of Changes to the Process Control ProgramAnnual Radioactive Effluent Release Report
Process Control Program
Press Release-IV-08-016, NRC to Hold Regulatory Conference with Nebraska Public Power District on Cooper Nuclear Station28 April 2008Press Release-IV-08-016: NRC to Hold Regulatory Conference with Nebraska Public Power District on Cooper Nuclear StationSafe Shutdown
ML08116039725 April 2008Notice of Public Meeting with Nebraska Public Power District, to Discuss an Inspection Finding Associated with Two Procedures That Were Not Adequate to Be Used by Operators to Bring the Plant to a Safe Shutdown Condition in the Event..Safe Shutdown
Fire Protection Program
ML08109000222 April 2008Summary of Telephone Conference Verbal Authorization for Cooper Relief Request RI-35Weld Overlay
Nondestructive Examination
ML08107026016 April 2008Closure of Investigation (OI 4-2007-047), Cooper Nuclear Station
ML08120088214 April 2008Notification of Potential Part 21 on Safety Related Noncompliance DeviationCoatings
NLS2008042, Response to Request for Additional Information 10 CFR 50.55a, Request RI-35, Revision 111 April 2008Response to Request for Additional Information 10 CFR 50.55a, Request RI-35, Revision 1Weld Overlay
Nondestructive Examination
Liquid penetrant
Dissimilar Metal Weld
ML0810701729 April 2008Notification of Potential Part 21 Regarding Torus Immersion/Vapor Phase CoatingsCoatings
NLS2008035, Discontinuance of Relief Request RI-13 for Fourth 10-Year Interval Inservice Inspection Program9 April 2008Discontinuance of Relief Request RI-13 for Fourth 10-Year Interval Inservice Inspection Program
ML0809503607 April 2008Request for Additional Information, Relief Request RI-35, Proposed Alternative to Repair Requirements for Dissimilar Metal Welds for Fourth 10-Year Inservice Inspection Program IntervalWeld Overlay
Liquid penetrant
Dissimilar Metal Weld
IR 05000298/20083017 April 2008Er 05000298/2008301; March 17-27, 2008; Cooper Nuclear Station; Initial Operator Licensing Examination ReportRecently irradiated fuel
ML0809906344 April 2008Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade Items
NLS2008034, Response to Request for Additional Information for License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate4 April 2008Response to Request for Additional Information for License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power UprateReactor Vessel Water Level
Grace period
Power change
ML0917606544 April 2008CNS Lr - Air Pollutants and Control Techniques - Particulate Matter, Control Techniques, EPA