Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML15222A25128 July 2015Inservice Inspection Program Third Interval, Third Period, Refueling Outage 20 Owner'S Activity ReportHydrostatic
Through-Wall Leak
ML11263A14813 September 2011Inservice Inspection Program Third Interval, Second Period, Refueling Outage 18 Owner'S Activity ReportWeld Overlay
Through Wall Leak
IR 05000482/201000511 February 2011IR 05000482-10-005; Wolf Creek Nuclear Operating Corporation; 10/01/2010 - 12/31/2010; Wolf Creek Generating Station, NRC Integrated Inspection ReportUnanalyzed Condition
Boric Acid
Fitness for Duty
Ultimate heat sink
Offsite Dose Calculation Manual
Water Inventory Control
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Process Control Program
Operability Determination
Earthquake
Through-Wall Leak
Fire Protection Program
Operability Assessment
Unidentified leak
ML10256025813 September 2010IR 05000482-10-006; February 16, 2008, Through July 30, 2010: Wolf Creek Generating Station, Biennial Baseline Inspection of the Identification and Resolution of ProblemsUnanalyzed Condition
Ultimate heat sink
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Through Wall Leak
Fire Protection Program
Scaffolding
Grace period
WO 10-0013, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating6 April 2010Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - OperatingTime of Discovery
Functionality Assessment
Through Wall Leak
ML1004907529 February 2010Submittal of Inservice Inspection Program Third Interval, Second Period, Refueling Outage 17 Owner'S Activity ReportThrough Wall Leak
ML1003305742 February 2010IR 05000482-09-007 on 09/21/09 - 12/4/09 for Wolf Creek; Special Inspection in Response to Loss of Offsite Power and Essential Service Water Leak on August 19, 2009Safe Shutdown
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Hydrostatic
Significance Determination Process
Biofouling
Pressure Boundary Leakage
Through-Wall Leak
Through Wall Leak
Through-Wall Leakage
Fire Protection Program
Fire Watch
Hourly Fire Watch
WM 09-0065, Response to NRC Integrated Inspection Report 05000482/20090049 December 2009Response to NRC Integrated Inspection Report 05000482/2009004Safe Shutdown
Unanalyzed Condition
Ultimate heat sink
Mission time
Enforcement Discretion
Significance Determination Process
Through-Wall Leak
Through Wall Leak
Offsite Circuit