ML20043G32314 June 1990Application for Withholding Proprietary Suppl 3 to WCAP-12248, Supplementary Assessment of Leak-Before-Break for Pressurizer Surge Lines of Unit 1, from Public Disclosure,Per 10CFR2.790
ML20012D53919 March 1990Requests Withholding of Encl Proprietary Info Re Rod Control Cluster Assembly Repositioning from Public Disclosure,In Accordance w/10CFR2.790.Affidavit Supporting Request Also Encl
ML19325E75423 October 1989Requests That Proprietary Rept WCAP-12248,Suppl 2, Addl Info in Support of Evaluation of Thermal Stratification for Comanche Peak Unit 1 Pressurizer Surge Line Be Withheld from Public Disclosure (Ref 10CFR2.790)
ML19325E90019 October 1989Forwards Text of Info Communicated to All Util W/ Westinghouse NSSS Design on Pressurizer Safety Valve Set Pressure Deviation Info Request ResponseLoop seal
ML20011E44417 October 1989Responds to 891010 Request for Comments on Plant SALP Process.Words of SALP Rept,Section H,Consistent W/Author Limited Knowledge & Exposure to Plant Current Status
ML20247G97713 September 1989Requests Proprietary Suppl 1 to WCAP-12248, Addl Info in Support of Evaluation of Thermal Stratification for Comanche Peak Unit 1 Pressurizer Surge Line, Be Withheld (Ref 10CFR2.790(b)(4))
ML20245J8593 August 1989Requests Proprietary Suppl 2 to WCAP-12258, Evaluation of Thermal Stratification for Comanche Peak Unit 1 RHR Lines Be Withheld (Ref 10CFR2.790)
ML20248B13811 July 1989Requests That Proprietary Rept RXE-89-003-P, Steady State Reactor Physics Methodology, Be Withheld from Public Disclosure (Ref 10CFR2.790)
ML20246E7944 May 1989Requests Withholding of Proprietary WCAP-12258, Evaluation of Thermal Stratification for Comanche Peak Unit 1 & 2 RHR Lines, from Public Disclosure (Ref 10CFR2.790)
ML20246K1644 May 1989Requests That Proprietary Rept WCAP-12267, Technical Bases for Eliminating Rupture of Accumulator Injection Nozzles... Comanche Peak Unit 1, Be Withheld from Public Disclosure (Ref 10CFR2.790).Ltr Is Reissuance
ML20245G08127 April 1989Requests That Proprietary WCAP-12248, Evaluation of Thermal Line Stratification for Comanche Peak Unit 1 Pressurizer Surge Line, Be Withheld,Per 10CFR2.790(b)(4)
ML20247A43724 April 1989Requests That Proprietary Rev 2 to WCAP-12123 Westinghouse Setpoint Methodology for Protection Sys,Comanche Peak Unit 1,Rev 1, Be Withheld from Public Disclosure (Ref 10CFR2.790)
ML20247L28027 March 1989Requests Withholding of Proprietary Rev 1 to WCAP-12123, Westinghouse Setpoint Methodology for Protection Sys, from Public Disclosure (Ref 10CFR2.790)
ML20247G40122 March 1989Application for Withholding Proprietary WCAP-12228, Transit Time Flow Meter Calculation (Ref 10CFR2.790)
ML20236E2267 March 1989Requests That Proprietary WCAP-12171, Evaluation of Thermal Stratification of Surge Line & RHR Lines for Comanche Peak Unit 1,Presentation Overheads for 890221 Util/Nrc Meeting, Be Withheld from Public Disclosure (Ref 10CFR2.790)
ML20207M68726 September 1988Requests That Proprietary WCAP-11987, Surge Line Stratification Presentation Overheads - 880907 Texas Util Electric/Nrc Meeting Be Withheld from Public Disclosure (Ref 10CFR2.790)
ML20148E63814 March 1988Requests for Withholding of Rept RXE-88-101-P, Design Basis Analysis of Postulated Steam Generator Tube Rupture Event for Comanche Peak Steam Electric Station Unit 1, from Public Disclosure
ML20245B77628 May 1987Requests That Rept Re Reported Failures of Model 3S-130-300 Class 1E Battery Chargers at Plant Be Sent to Author.Company Has Received Little or No Info Re Reported Failures
ML20214K04924 September 1986Requests Withholding of Proprietary WCAP-11127, Shotpeening Licensing Rept for Comanche Peak Unit 1, Per 10CFR2.790
ML20237L18731 August 1986Forwards marked-up Corrected Transcript of Cj Haughney 860617 Investigative Interview.Two Comments,Including Evident Transcription Error on Page 20,Line 12 Discussed
ML20214K0701 August 1986Requests Withholding of Proprietary WCAP-11175, Row 1 & Row 2 Heat Treatment for Comanche Peak Unit 1, Per 10CFR2.790
ML20197E2898 April 1986Discusses Energy Technology Engineering Ctr Review of Rev 3 to Comanche Peak Review Team Issue-Specific Action Plan V.D Re Unauthorized Plug Welds in ASME Pipe Supports & Base Plates & in Cable Tray Supports.Review Encl
NRC-85-3061, Submits Internal Review Results Concluding That Safety Deficiencies,Intimidation & Retaliation Alleged by Ja Segletes Did Not Occur,Confirming 850712 Preliminary Assessment.Related Info Encl13 September 1985Submits Internal Review Results Concluding That Safety Deficiencies,Intimidation & Retaliation Alleged by Ja Segletes Did Not Occur,Confirming 850712 Preliminary Assessment.Related Info EnclShutdown Margin
ML20135C26430 August 1985Requests That Proprietary Responses Re Justification of Reduced Flow Meter Measurement Uncertainties Be Withheld (Ref 10CFR2.790)
NRC-84-2985, Advises That Addl Info Requested During 841008 Meeting Re WCAP-9172(P)/9264(NP), N-16 Transit Time Flow Measurement Sys (Ttfm) Description & Performance Will Be Provided to NRC by First Refueling Outage5 December 1984Advises That Addl Info Requested During 841008 Meeting Re WCAP-9172(P)/9264(NP), N-16 Transit Time Flow Measurement Sys (Ttfm) Description & Performance Will Be Provided to NRC by First Refueling Outage
ML20098C85914 August 1984Alleges That Unqualified Suppliers Awarded Contracts from Plants to Provide Flexible Conduits Unqualified Under IEEE Stds 323 & 344 Despite IEEE Bid Requirements.Meeting Re NRC Position on safety-related Installations Requested
ML20090A07014 June 1984Responds to Request for Info Re Westinghouse DS-416 Breaker Moving Secondary Contact Mounting Frame Welds.Separated Bracket Welds Not Indicative of Generic Issue
ML20092H4404 June 1984Requests Withholding of Proprietary Westinghouse Setpoint Methodology for Protection Sys,Comanche Peak Station, (Ref 10CFR2.790)
ML20101C43718 May 1984FOIA Request for Investigation Rept Re Flexible Metal Conduit & Associated Fittings Supplied to Facilities
ML20084A67715 April 1984Application for Withholding Proprietary Rept, Technical Bases for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for Comanche Peak,Units 1 & 2
ML20081E80628 October 1983Application for Withholding Proprietary Version of Technical Bases for Eliminating Large Primary Loop Pipe Ruptures as Structural Design Basis for Comanche Peak Units 1 & 2, Per 10CFR2.790.Affidavit Encl
ML20081A46126 August 1983Forwards Nonproprietary & Proprietary Versions of Counterflow Preheat Steam Generator Tube Expansion Rept & Counterflow Preheat Steam Generator Tube Vibration Summary Rept. Proprietary Version Withheld (Ref 10CFR2.790)
ML20081A46926 August 1983Application for Withholding Proprietary Versions of Counterflow Preheat Steam Generator Tube Expansion Rept & Counterflow Preheat Steam Generator Tube Vibration Summary Rept, Per 10CFR2.790.Affidavit Encl
ML20072G23221 June 1983Advises That Info Submitted by Util on 830610 Re Response to Open Items from Equipment Qualification Branch Sqrt Is Nonproprietary
ML20072J49621 June 1983Advises That Info Provided in Texas Utils Re Open Items from NRC Equipment Qualification Branch Sqrt Audit of Site Not Westinghouse Proprietary as Originally Marked
ML20069G10528 February 1983Forwards Rev 0 to Nonproprietary WCAP-8587,Suppl 1, Equipment Qualification Data Packages & Proprietary WCAP- 8687,Suppl 2 Equipment Qualification Test Repts. Proprietary Repts Withheld (Ref 10CFR2.790)
ML20010A76824 July 1981Forwards Application for Withholding & Proprietary Rept WCAP-8687 Suppl 2,E22A.Also Forwards Revision 2 to Nonproprietary Rept WCAP-8587 Suppl 1,EQDP-ESE-22. Proprietary Rept Withheld (Ref 10CFR2.790)
ML19345D49326 November 1980Forwards Revision 1 of Table 1,providing Scheduled Documentation Submittal Dates to NRC for Equipment Qualification Data Packages Included in Vendor Equipment Qualification Program.Table 2 Re Facility Equipment Encl
ML19340C4137 November 1980Forwards Proprietary & Nonproprietary Versions of Slides Used in Westinghouse Proposal for Addressing Inadvertent Boron Dilution Event at Facility.Application for Withholding & Affidavit Encl
ML19323H2993 June 1980Forwards Qualification Test Schedule & Status for Class IE Equipment to Be Supplied by Vendor.Submittal in Response to Action Item Per 800507 Meeting Re Qualification Programs & Review,Required to Ensure Timely Issuance of OL
ML19281A54516 February 1979Confirms Telcon of 790216 Re Defective Equipment Supplied to Texas Util Generating Co.Two AV Line Switchboards Were Shipped W/Incorrect Ammeters Installed.Incorrect Ammeters Were Removed & Correct Ammeters Installed