Forwards Revision 1 of Table 1,providing Scheduled Documentation Submittal Dates to NRC for Equipment Qualification Data Packages Included in Vendor Equipment Qualification Program.Table 2 Re Facility Equipment Encl
ML19345D493
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/26/1980
From: Anderson T
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NS-TMA-2346, NUDOCS 8012150230
Download: ML19345D493 (6)


Text

-f h Westinghouse Water Reactor m3r N'mir:e Electric Corporation Divisions e, a

esx;, errse.r.pt:20 NS-TMA-2346 November 26,1980 Darrell G. Else. hut Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regalatory Commission Phillips Building 7920 Norfolk Avenue Bethesda, Maryland 20014

Dear Mr. Eisenhut:

The attached Table 1 (Revision 1) provides the scheduled documentation submittal dates to the NRC for the Equipment Qualification Data Packages (EQDP's) which are included in the V/estinghouse Equipment Qualification Program as defined in WCAP 8587. As agreed by Mr. Zoltan Rosztoczy and his Staff in a meeting on November 7, 1980, this information is being supplied in parallel to Mr. G. Holt of Oak Ridge National Laboratory.

Also included in this transmittal, Table 2, is the listing of equipment and EQDP's which are applicable as part of the qualification program for the Comanche Peak project.

Ifgou hav$any fuger questions concerning this information, please contact me.

y f

Sincerely yours, g.,

pc e, mf

.N

?

sh, 2 -_ _

Jej g

T. M. Anderson, Manager c

Nuclear Safety Department n.~

A. Ball / keg Attachment 8012150.2 O A

_m 1

t

~

i IABLE 1(Sheet I of 4) Revision I 11/17/80 i

L l-5(heduled Scheduled festin9 Dm umentation Test Sutait t a l i

W-E40P, System Location Thermal Aging Ragation Seismic HILB to th_e NRC_ _

l Equipnent, Reference Manufacturer Safety Related HE-l & 4 Limitorque CVCS Limitorque Start 9 29-80 10-28-80 12-01-80 12-16-80 3-23-81 l

Valve Electric SIS Isomedix Complete 10-07-80 12-01-80 12-16-80 2-08-81 Motor Operator s CCS Acton RHRS Safety Related HE-2 & 5 ASCO-CVCS ASCO Start 10-22-80 11-28-80 32-20-80 2-08-81 5-01-81

[

Solenoid valves SIS Isomedia Complete 11-14-80 12-20-80 02-08-81 3-21-81 RCS Acton 4

WPS 55 SGBP

[

RHR Safety Relate 3 HE-3 NAMCO CVCS NAMCO Start 10-06-80 10-27-80 11-21-80 12-08-80 3-31-81 Externally 515 ACDC Complete 10-21-80 11-21-80 12-05-80 1-31-81 Limit Switches CSS Georgia 1

RHR Tech RCS j

HE-6 NAMCO WPS Start 10-06-80 10-27-80 11-21-81 12-08-80 3-31-81 SS Ccaplete 10-21-80 11-21-81 12-05-80 1-31-81 SGBP Pressure ESE-1 Barton RPS Barton Start 7-22-80 12-01-80 1-10-81 2-10-81 3-31-81 fransmitters PAM W-rorest Hills.

Complete 11-15-80 12-31-80 2-01-81 3-01-81 i

Group A-W-AESD 150MEDIX Pressure ESE-2 8arton RPS Barton Start 6-16-80 i

l Iransmitters PAM W-Forest Hills Cumplete Completed NS-lMA-2258 Gonup B W-AESD ISOMEDIX Dif f erent ial ESE-3 Bar ton RPS W-Forest Hills Start 7-22-80 12-01-80 1-10-81 2-10-81 3-31-81 Pressure PAM W-AESD Complete 11-15-80 12-31-80 2-01-81 3-01-81

. Group A ISOMEDIX 4

t Dif f erent ial ESE-4 Barton PAM W-rorest Hills Start 6-16-81 Pressure RPS W-AESD Complete Cunpleted NS-lMA-2259 i

Iransmitter

.ISOMEDIX-Group B Resistence ESE-5 Rdf RPS W-Forst Hills Start 5-19-80 6-27-80 9-24-80 11-01-80 12-31-80 l

lempes atur e W-AISD Complete 6-13-80 7-23-80 10-22-80 11-20-80 I

Detector ISOM(UlX (BC-Bypass)

StPRGICOI

[

Univ. of Buffalo Resistence ESE-6 Rdf PAMS W-rorest 11611s Start.

5-19-80 6-??-80 9-24-80 11-01-80 12-31-80 lemperature W-AESD Complete 6-13-80 7-13-80 10-22-80 11-20-80 Octector ISOMEDIX (well-mounted)

SURGlCUT j

Univ. of Ruffalo

~

IABLE I (5heet 2 of 4) Revision 1 11/11/80 5ctieduled Schedaled lestIng Dor innent a t inn W-E Qup lest Sutien i t t a l f igu ipment Reference Manufacturer Systein Location thermal Aglsyg Radiation Seismic ift t H to the NRC R es i s t ence (SE-1 Rdf RPS W-forest 198115 Start 5-19-80 6-27-ft) 9-71-80 11-01-89 17-11-80 l eingerat ur e W-AESD Casnplet e 6-13-ft0 7-13-80 10-77-80 11-70-80 Detectors ISOME DI X (f ast response)

StHGICUI folv. of Duffalo

[ncore ESE-9**

W-lGID RPS W-f ores tillis Start 4th Quarter 1981 ist you t er Neutron W-AESD Crunplete 19H7 Detertors W-lGID (Source)

Nuclear ESE-ID*

~W-ID RPS W-AESD Start 6-16-80 I nst rwnent at ion W-lO Crunplete Carnplet ed N5-lMA-77S1 Syste*n (NIS)

Source Range ESE-ll**

W-lO RPS W-Eorest lillis Start 4th Quarter 19111 ist you ter Prewnplifler W-AESD C(unplete 1987 (Outside Cnn-W-ID t a i renent )

Hain Cnntrol ESE-12 Electroswitch RPS W-AE50 Start ist Quarter 1981 4-10 81 Bnard Switch E SF Complete Modules Prin.es s ESE-13 W-ISD RPS L AE SD Start N/A N/A 11-30-80 N/A 17-10 -H4 Protection

~

Couplete 17-05-80 System Indicators ESE-14 W-R I D PAM W-AESD Start N/A N/A 5-01-80 N/A 17-10-80 Crunplete 8-01-80 R ec or der s E SE -15 W-CID PAM W-AESD Start N/A N/A 8-01-/9 N/A 6-16-80 Couplete 10-10-79 NS-lMA-7760 Pr ot er t inn

-W-ID RPS W-AESD Start Sulid State ESE-16 ESF W-ID Conplete Cunpleted 17-30-80 Systesu 8, Safespsasd lest Cabinet (7 Irain)

Snlid State Penter.tinn System ESE-17 W-ID RPS W-AESD Start R. SNfeguard lest

~

E SI W-lu Cisnpl et e Conple t ed 1-10-81 Cabinet (l Trains Ins tr unent Hus E SE -Ifl W-PE D

[ lec ti i-W-AESD Start 1-31-80 Power Supply cal Power C unplet e Canpleted NS-IMA-7780 (Stat ic Inverter)

Supply 1.5 KVA Distribution

~W Pf D Electri-W-AESD Start instruw nt Rus E SE -19 cal Power Conplete C onp le t ed 1-30-81 Pane l /,5 l'VA Supply

IAhli I (Sheet 3 of 4) Revlon i 11/11/H0 5 hettaled Sdiodislest Yesting Deerinnent a t ion W-E f}DP Iest Subm i t t a l

!'l4 I "'!!t R,_ef_eyggce Marpff,x t_ur er Sptgn Loc at i on Iher ma l_A_gi n,g R a416 a t i on Seism 6c Di t 8 t o t_ he fMC _ _

t Reat. t or Irip ISE-20 W-tVSD RPS W-AESD Start 9 - 10.[p)

Switch gear Conplete

- E unplet ed

~- -

NS-lMA-/HW Pr essur e FSE-21 Ilarton RPS Ilarton Start 1-F1-80 I?-01-80 1-10-111

?-10-81 Sensor PAMS W-Forest Hills Conpl et e,

11

-80

!?-31-80 2-01-H1 3-01-81 1-11-H1 W-AESD ISOME DI X 4 Sect ion ESE-22 W-lGID RPS W-lGID Start 8-20-80 9-20-110 12-01-H0 t. G '!!

F uov e Neutron W-AESD Conplete 9-15-80 10-05-80 I?-31-80 2-01-81

?-16-81 Det er t <>r inop stop ESE-23

-W-lO RPS Analysis Start Not Scheduled V alue Cabinet Only Cunplete RCP ESE-24 W-ISD RPS W-ISD Start Not Scheduled speed Sensur Electso Corp.

Conplete Msin Control E SE -25 W-CID RPS W-AESU Start floa d ESF Conplete 3rd (Juarter 1980 6-17 81 PAN Reac tor Trip E5E-26

-W-t V SD RPS W-AESD Start Not Schedirled Switch year Conplete N i t r mje n-16 ESE-27 W-lGID Det ei: t or RPS W-IGID Start 9-15-80 10-05-80 10-??-80 11-10-80 1-10-H1 W-AESO C<=np l e t e 10-01-80 10-18-80 11-05-80 17-01-Ho Rod Posit ion ESE-28 Productos RPS W AESD Start Not S(heduled Detector Electronicos, W-Rf.D Conplete Inc.

Puerto Rico Rod Position ESE-29

-W-ID RPS W-AESD Start Not Schedule.f Dat.n Cabinet Curepl e t e Integrated ESE-30 W-ISD Pr otet tion Cabinet RPS W-AlSD Start 3rd (Juarter 1981

!?-to n!

W-ISD Conplete integiated I SE -31 W-ISD 1 ogic Cabinet RPS W-AISD Start Ird (Juar t er 1981 17-10-01 W -I SD Conplete f irld leeminal ion ESE-12 W-ISD RPS W-AE SD Start Not S(beiluted Cabinet

~

Conpl ete Ins t r umm.t Hus LSt-33 W-AfSD Distribution

~

Electri-W-AFSU Start Not Scheduled - -

cal P u er Cunple t e Pane 1 Supply Ins t r ument flos ISE-H W-AF SH D is t r ib s t ion

~

flectri-W-AISD Start dit irhedulmf -

c a l Power Cewmlet*

Panet Supply

/11%

IABLE I (Sheet 4 of 4) Revision i 11/11/30 Scheduled Scheduled Testing Dt<umentation W.EQOP Iest.

Sutnni t t a l Equienent, Reference Manufacturer System location Thermal Aginj Radiation Seismic infl0 to the NRC Instr unent Power ESE-35 W-AESD Electri-W-AESD Start not Scheduled Supply cal Power Complete Supply Source P~.nge ESE-36 W-ID RPS W-Forest tillis Start 4th Quarter 1981 3-30-82 Pr e.unp l i f ier W-AESD Complete (In Contalmucnt)

Demultiplemer

~

PAM W-AESD Start Not Scheduled PAMS ESE-31 W-ISD Complete Multiplexer

-W-ISD RPS W-AESD Star t Not Scheduled Control Board ESE-3P ESF Complete fiber Optic ESE-39 W-ISD RPS W-ISD Start Not Scheduled Cable Siemens complete Amphenol Safety Related AE-1(Hedium) W-Pt1&G W-AESD Start 4th Quarter 1980 Punp Motors ISOMEDIX Complete 2nd Quarter 1981 5-3D-81 W-R&D AE-2(Large) -W-tHD Buffalo CVCS W-AESD Start 3rd Quarter 1980

[BS ISOMEDIX Complete 1st Quarter 1981 3-30 81 SIS RiiRS CCWS CSS AE-3 (Canned), Chempwnp W-AESD Start 1918 Lock heed Complete 1st Quarter 1981 3-30-81 Permagrain AE-4(EBS)

WEIR Start Not Scheduled Complete liydrogen SP-1 W-Sturtevant W-AESD Start Accepted Reconbiner.

~

W-Canada Inc.

Complete Completed NRC LIR 6-22-Id Aging Progr.un - Phase I Res alts 3-30-81

-* Boron dilution fix requires qualification of the source range drawer. Testing will be cunpleted by the 4th quarter 1981. Qualif ication Report will will be revised the 1st quarter 1982.

    • Ihis' ef fwt addresses the Boron dilution fim.

NOlES:

j CVCS = Chemical Volume Control System RPS = Reactor Protection System

' SIS = Safety Injectio System ESF = Engineered Saf eguard resture WPS = Waste Processing System RCS = Reactor Coolant System SGBP Steam Generator Blowdowo (Waste) Processing (System) 55

= Sampling System RilR = Residual lleat Removal (System)

CSS = Contalmnent Spray System

+

f mer oenr y Horation Systrwn ram - rw r a c c i. inn e M.m s e n. s on fRS e

I N TG a Equipment which is applicable on part of the E00P orogram for Comanche Peak

'af ety Related ME-1 L 4 Source Range ESE-11 Rod Position ESE-28 X

Paesmolifier Detector alve Electric tor Operators (Outsice Con-X taiment)

Rod Position ESE-29 Data Cabinet Main Control ESE-12 ESE-30 X

board Switen Integrated jafety Related HE-2 L 5 Modules Protection Cabinet folcnoid valves Process ESE-13 Integrated ESE-31 Protection X

Logic Cabinet System X

Field Termination ESE-32 Indicators ESE-14 Cabinet afety Related HE-3 xternally X

X imit Saitenes Recorders ESE-15 Instrument Sus ESE-33 Distribution Panel y

HE-6 Solid State ESE-16 Instru ent Bus ESE-34 Protection Distribution Panel System y

& Safeguard Test Cabinet (2 Train)

Instrunent Power ESE-35 ressure ESE-1 Supply rans:si tters x

Solid State ESE-17

.rovo A Protection System

& Safeguard Test Source Range -

ESE-36 Cabinet (3 Trains)

Preamp 11fier (In-Containment)

(ressure ESE-2 Instrument Bus ESE-18 x

pransaitters Power Supply PAMS ESE-37 troup B (Static Inverter)

X Denultiplexer 7.5 KVA

$1f f erenti al ESE-3

[ressure X

Instrunent Bus ESE-19 Control Board ESE-38 e cuo A Distribution Multiplexer eifferential ESE-4 Panel 7.5 KVA

-rtssure Cable ransmitter X

Reactor Trip ESE-20 X

roup B Switch gear Safety Related AE-I(Nedium)

'*"P " * #5 esistence ESE-5 s

emperature Pressure ESE-21 X

AE-2(Largo) -

(tetec t:r Sensor

$BC-Bypass)

AE-3(Canned) 4 Section ESE-22 h sistance ESE-6 e

Excore Neutron X

emo:rature X

Detector AE-4(EBS) getectcr PJell-mounted)

Loop Stop ESE-23 Value Cabinet de31stcnce ESE-7 I

RCP ESE-24 R co er femoerature Speed Sensor Betectors X

(Fast response)

Main Control ESE-25 Board Excore ESE-9 Zeutron X

Reactor Trip ESE-26

'Dettetors Switen gear (Source) hh a &Ugp

-1c x

.,t,og.n.1.

m.2, x

Instrunent ation Detector Systeat (NIS)