ML21210A133 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operations (EPID L-2020-LRO-0076) - Redacted | Boric Acid Hydrostatic |
ML21210A138 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards (EPID L-2020-LRO-0076) - Redacted | Boric Acid Shutdown Margin Mission time Stroke time Hydrostatic Coatings Operating Basis Earthquake Aging Management Design basis earthquake Fuel cladding Liquid penetrant GOTHIC |
ML21231A013 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (EPID L-2020-LRO-0076)- Redacted | |
ML21208A367 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis (EPID L-2020-LRO-0076) - Redacted | Safe Shutdown Boric Acid Shutdown Margin Loop seal Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Finite Element Analysis Earthquake Turbine Missile Fuel cladding Power change GOTHIC |
ML21208A409 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control (EPID L-2020-LRO-0076) - Redacted | Safe Shutdown Boric Acid Shutdown Margin Fire Barrier Anticipated operational occurrence Emergency Lighting Aging Management Earthquake Fuel cladding Power change Power Uprate Measurement Uncertainty Recapture |
ML21208A418 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics - (EPID L-2020-LRO-0076) - Redacted | Grab sample Met Tower Design basis earthquake B.5.b Mitigating Strategies Earthquake |
ML21208A424 | 30 September 2020 | ML20308A515_003 SPS UFSAR Chapter 3 - Redacted | Boric Acid Shutdown Margin Nondestructive Examination Aging Management Exemption Request Earthquake Fuel cladding Flow Induced Vibration |
ML21208A429 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System (Epids L-2020-LRO-0076) - Redacted | Boric Acid Loop seal Non-Destructive Examination Stroke time Hydrostatic Coatings Finite Element Analysis Aging Management License Renewal Exemption Request Earthquake Liquid penetrant Power change Flow Induced Vibration Power Uprate Measurement Uncertainty Recapture |
ML21210A126 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency Systems (Epids L-2020-LRO-0076) - Redacted | Safe Shutdown Boric Acid High winds Shutdown Margin Loop seal Grab sample Fire Barrier Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Nondestructive Examination Emergency Lighting Aging Management Design basis earthquake Code Reconciliation Exemption Request Earthquake Control of Heavy Loads Fuel cladding Biofouling Fire Protection Program Scaffolding Power change Power Uprate Exclusive Use |
ML21210A125 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 18, Programs and Activities That Manage the Effects of Aging (EPID L-2020-LRO-0076) - Redacted | Boric Acid Non-Destructive Examination Fire Barrier Safe Shutdown Earthquake Coatings Aging Management License Renewal Earthquake Maintenance Rule Program Control of Heavy Loads Biofouling Fire Protection Program |
ML21210A127 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Frontmatter (EPID L-2020-LRO-0076) - Redacted | Hot Short Non-Destructive Examination Offsite Dose Calculation Manual Stroke time Tornado Missile Internal Flooding Met Tower Emergency Lighting FLEX Aging Management Open Phase Condition Spent Fuel Pool Instrumentation Tornado Missile Risk Evaluator Earthquake Fuel cladding |
ML21210A128 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion (EPID L-2020-LRO-0076) - Redacted | Safe Shutdown Boric Acid Loop seal Tornado Missile Emergency Lighting Aging Management Design basis earthquake Earthquake Turbine Missile Power Uprate |
ML21210A129 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems (EPID L-2020-LRO-0076) - Redacted | Safe Shutdown High winds Reserve Station Service Transformer Emergency Lighting Aging Management Open Phase Condition Earthquake |
ML21210A134 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations(Epid L-2020-LRO-0076) - Redacted | Backfit |
ML21210A135 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 15, Structures and Construction (EPID L-2020-LRO-0076) - Redacted | Safe Shutdown Boric Acid Tornado Missile Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Tornado-Generated Missile Design basis earthquake Tornado Missile Risk Evaluator Exemption Request Earthquake Liquid penetrant |
ML21210A136 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Wastes and Radiation Protection (EPID L-2020-LRO-0076) - Redacted | Boric Acid High Radiation Area Grab sample Offsite Dose Calculation Manual Hydrostatic Aging Management Tornado Missile Protection Earthquake Environment Report |
ML21210A137 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 5, Containment System (EPID L-2020-LRO-0076) - Redacted | Ultimate heat sink Aging Management Earthquake Fuel cladding GOTHIC |
ML21210A139 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary (EPID L-2020-LRO-0076) - Redacted | Boric Acid Shutdown Margin Hydrostatic Reserve Station Service Transformer Aging Management Earthquake Fuel cladding Power change |
ML21210A140 | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Technical Requirements (EPID L-2020-LRO-0076) - Redacted | |
ML19058A442 | 27 September 2018 | Updated Final Safety Analysis Report, Chapter 9 | Safe Shutdown Boric Acid High winds Shutdown Margin Loop seal Grab sample Fire Barrier Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Nondestructive Examination Emergency Lighting Aging Management Design basis earthquake Code Reconciliation Exemption Request Earthquake Control of Heavy Loads Fuel cladding Biofouling Fire Protection Program Scaffolding Power change Power Uprate Exclusive Use |
ML19058A583 | 27 September 2018 | UFSAR Chapter 14-18 | Safe Shutdown Boric Acid Shutdown Margin Loop seal Non-Destructive Examination Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Aging Management Design basis earthquake License Renewal Exemption Request Earthquake Maintenance Rule Program Control of Heavy Loads Turbine Missile Fuel cladding Biofouling Liquid penetrant Fire Protection Program Power change GOTHIC Power Uprate Measurement Uncertainty Recapture |
ML14233A514 | 30 June 2014 | Redacted - Surry Power Station Units 1 & 2, Independent Spent Fuel Storage Installation (ISFSI) - Safety Analysis Report - Revision 20 | Safe Shutdown Offsite Dose Calculation Manual Tornado Missile Safe Shutdown Earthquake Coatings Met Tower Incorporated by reference Decommissioning Funding Plan Aging Management Safeguards Contingency Plan License Renewal Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Loctite |
ML19094A134 | 13 February 1970 | Final Safety Analysis Report | |
ML19094A132 | 21 January 1970 | Surry Station Units 1 & 2, Final Safety Analysis Report | |
ML19094A133 | 21 January 1970 | Final Safety Analysis Report | |