ML21210A140

From kanterella
Jump to navigation Jump to search

2 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Technical Requirements (EPID L-2020-LRO-0076) - Redacted
ML21210A140
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/30/2020
From:
Virginia Electric & Power Co (VEPCO)
To:
Office of Nuclear Reactor Regulation
Thomas V
Shared Package
ML21208A006 List:
References
20-325, EPID L-2020-LRO-0076
Download: ML21210A140 (8)


Text

Surry Power Station Updated Final Safety Analysis Report Chapter 16

Intentionally Blank Revision 52Updated Online 09/30/20 SPS UFSAR 16-i Chapter 16: Technical Specifications and Technical Requirements Table of Contents Section Title Page 16.1 TECHNICAL SPECIFICATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16.1-1 16.2 TECHNICAL REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16.2-1

Revision 52Updated Online 09/30/20 SPS UFSAR 16-ii Intentionally Blank

Revision 52Updated Online 09/30/20 SPS UFSAR 16.1-1 CHAPTER 16 TECHNICAL SPECIFICATIONS AND TECHNICAL REQUIREMENTS 16.1 TECHNICAL SPECIFICATIONS Technical Specifications were proposed in accordance with 10 CFR 50.36 during the initial licensing of the plant. The Technical Specifications now reside in Appendix A of the Operating License for each unit.

Technical Specifications define plant variables, operating conditions, surveillance requirements, and administrative controls that are considered necessary to ensure the health and safety of the public.

Revision 52Updated Online 09/30/20 SPS UFSAR 16.1-2 Intentionally Blank

Revision 52Updated Online 09/30/20 SPS UFSAR 16.2-1 16.2 TECHNICAL REQUIREMENTS The Technical Requirements Manual (TRM) contains requirements for plant operation and surveillance of systems formerly contained in the Technical Specifications, along with other selected items. Some requirements were removed from the Technical Specifications as part of NRC and industry efforts to simplify Technical Specifications.

The TRM is controlled by station procedure, and a 10 CFR 50.59 review is required to change the TRM. Changes to the TRM may be made without prior NRC approval, provided that the changes do not involve a license amendment as defined in 10 CFR 50.59. Changes to the TRM that are implemented without prior NRC approval are reported to the NRC in accordance with 10 CFR 50.59. Proposed changes that involve a license amendment are reviewed and approved by the NRC prior to implementation.

Revision 52Updated Online 09/30/20 SPS UFSAR 16.2-2 Intentionally Blank