ML21231A013

From kanterella
Jump to navigation Jump to search

2 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (EPID L-2020-LRO-0076)- Redacted
ML21231A013
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/30/2020
From:
Virginia Electric & Power Co (VEPCO)
To:
Office of Nuclear Reactor Regulation
Thomas V, NRR/DORL/LPL2-1, 415-5897
References
EPID L-2020-LRO-0076
Download: ML21231A013 (4)


Text

Surry Power Station Updated Final Safety Analysis Report Chapter 17

Intentionally Blank Intentionally Blank

Revision 52Updated Online 09/30/20 SPS UFSAR 17-1 CHAPTER 17 QUALITY ASSURANCE The Quality Assurance Program is described in Topical Report DOM-QA-1, Dominion Nuclear Facility Quality Assurance Program Description (QAPD). This topical report provides the QAPD for Dominions nuclear power stations and independent spent fuel storage installations.

The Dominion QAPD conforms to applicable regulatory requirements, such as 10 CFR 50, Appendix B, and approved industry standards, including equivalent alternatives, where identified.

This program applies to activities during design, construction, operation, and decommissioning as well as siting.

Revision 52Updated Online 09/30/20 SPS UFSAR 17-2 Intentionally Blank