Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22138A20228 April 2022Submittal of Revision 21 to Updated Final Safety Analysis ReportShutdown Margin
ML22140A08128 April 20221 to Updated Final Safety Analysis Report, Chapter 8, Electric PowerSafe Shutdown
Boric Acid
Fire Barrier
Open Phase Condition
Earthquake
ML22140A07928 April 20221 to Updated Final Safety Analysis Report, Chapter 16, Technical SpecificationsStroke time
ML22140A06928 April 20221 to Updated Final Safety Analysis Report, Chapter 14, Initial Test ProgramSafe Shutdown
Boric Acid
Shutdown Margin
Hydrostatic
Emergency Lighting
Power-Operated Valves
Pressure Boundary Leakage
Power change
ML22140A07128 April 20221 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste ManagementBoric Acid
Packing leak
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Safe Shutdown Earthquake
Process Control Program
Fuel cladding
Scaffolding
Unidentified leakage
ML22140A07728 April 20221 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (Redacted)Safe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Anticipated operational occurrence
Water Inventory Control
Safe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Incorporated by reference
Design basis earthquake
Earthquake
Fuel cladding
Pressure boundary leak
ML22140A06728 April 20221 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (Redacted)Boric Acid
Shutdown Margin
Loop seal
Stroke time
Hydrostatic
Coatings
Earthquake
Deep Dose Equivalent
Fuel cladding
Coast down
Unidentified leakage
Power Uprate
ML22140A06128 April 20221 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (Redacted)Safe Shutdown
Boric Acid
Health Physics Network
Shutdown Margin
Loop seal
Ultimate heat sink
Grab sample
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Coatings
Operating Basis Earthquake
Emergency Lighting
Tornado-Generated Missile
Spent Fuel Pool Instrumentation
Earthquake
Control of Heavy Loads
Power-Operated Valves
Through Wall Leak
Fire Protection Program
ML22140A05628 April 20221 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
ML22140A06428 April 20221 to Updated Final Safety Analysis Report, Chapter 1, Responses to NRC QuestionsHot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Loop seal
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Tornado-Generated Missile
Design basis earthquake
Earthquake
Turbine Missile
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Fire Protection Program
Scaffolding
Power change
Flow Induced Vibration
ML22140A06828 April 20221 to Updated Final Safety Analysis Report, Chapter 13, Conduct of OperationsSafe Shutdown
Fitness for Duty
Probabilistic Risk Assessment
Temporary Modification
Cyber Security
Safeguards Contingency Plan
Earthquake
Maintenance Rule Program
Fire Protection Program
Fire Watch
ML22140A07528 April 20221 to Updated Final Safety Analysis Report, Controlled Drawings, Part 4 of 4 (Redacted)Boric Acid
ML22140A06528 April 20221 to Updated Final Safety Analysis Report, Chapter 12, Radiation ProtectionHigh Radiation Area
Anticipated operational occurrence
Coatings
Annual Radioactive Effluent Release Report
Deep Dose Equivalent
Fuel cladding
Scaffolding
Overexposure
ML22140A06228 April 20221 to Updated Final Safety Analysis Report, Controlled Drawings, Part 3 of 4
ML22140A07328 April 20221 to Updated Final Safety Analysis Report, Controlled Drawing Manual Cross-ReferenceBoric Acid
ML22140A07828 April 20221 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemSafe Shutdown
Loop seal
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Stroke time
Tornado Missile
Internal Flooding
Hydrostatic
Operating Basis Earthquake
Process Control Program
Earthquake
ML22140A08028 April 20221 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected SystemsSafe Shutdown
Boric Acid
Loop seal
Grab sample
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
Power change
Unidentified leakage
ML22140A07628 April 20221 to Updated Final Safety Analysis Report, Chapter 19A, License RenewalBoric Acid
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Past operability
Coatings
Nondestructive Examination
Aging Management
License Renewal
Control of Heavy Loads
Biofouling
EVT-1
Through-Wall Leakage
Fire Protection Program
Power Uprate
ML22140A05828 April 20221 to Updated Final Safety Analysis Report, Controlled Drawings, Part 2 of 4 (Redacted)
ML22140A07428 April 20221 to Updated Final Safety Analysis Report, Controlled Drawings, Part 1 of 4
ML22140A05928 April 20221 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and ControlsSafe Shutdown
Boric Acid
Fitness for Duty
Health Physics Network
High winds
Shutdown Margin
Reactor Vessel Water Level
Grab sample
Anticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Operator Manual Action
Earthquake
Fuel cladding
Pressure Boundary Leakage
Power change
ML22140A07028 April 20221 to Updated Final Safety Analysis Report, Chapter 4, ReactorBoric Acid
Shutdown Margin
Safe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Earthquake
Fuel cladding
Power change
ML22140A06628 April 20221 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Redacted)
ML22140A06028 April 20221 to Updated Final Safety Analysis Report, List of Effective Pages
ML20133J94029 April 2020Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing ListBoric Acid
ML20133J93329 April 2020Submittal of Updated Final Safety Analysis Report, Revision 20Cyber Security
ML20133J93929 April 2020Updated Final Safety Analysis Report, Revision 20, List of Effective Pages
ML20133J94329 April 2020Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 3 of 4)
ML20133J93829 April 2020Updated Final Safety Analysis Report, Revision 20. (Part 5 of 5, Response to NRC Questions)Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Tornado-Generated Missile
Design basis earthquake
Earthquake
Turbine Missile
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Fire Protection Program
Scaffolding
Power change
Flow Induced Vibration
ML20133J94229 April 2020Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 2 of 4) (Redacted)
ML20133J94429 April 2020Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 4 of 4) (Redacted)Loop seal
FLEX
ML20133J94129 April 2020Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 1 of 4)
ML18130A03430 April 2018Project, Units 1 and 2, Submittal of Updated Final Safety Analysis Report, Revision 19Open Phase Condition
License Renewal
Dissimilar Metal Weld
ML18130A04730 April 2018Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 19, Controlled Drawing, Part 2
NOC-AE-18003568, Updated Final Safety Analysis Report, Revision 19, Controlled Drawing, Part 430 April 2018Updated Final Safety Analysis Report, Revision 19, Controlled Drawing, Part 4
ML18130A04830 April 2018Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 19, Controlled Drawing, Part 3
ML18130A04530 April 2018Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 19, Controlled Drawing Manual Cross-ReferenceBoric Acid
ML18130A04630 April 2018Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 19, Controlled Drawing, Part 1
ML16207A66528 April 2016Revision 18 to Updated Final Safety Analysis Report, Section 3.6.2, Figure 3.6.2-1 to Figure 3.6.2-8
ML16207A63928 April 2016Revision 18 to Updated Final Safety Analysis Report, Section 15.B, Figure 15.B-2 to 15.B-3
ML16207A62428 April 2016Revision 18 to Updated Final Safety Analysis Report, Section 11.4, Figure 11.4-1 to 11.4-3
ML16207A64728 April 2016Revision 18 to Updated Safety Analysis Report, Section 2.1, Figure 2.1-1 Through Figure 2.1-13
ML16207A61828 April 2016Revision 18 to Updated Final Safety Analysis Report, Section 10.3, Figure 10.3-1 to Figure 10.3-5
ML16207A63028 April 2016Revision 18 to Updated Final Safety Analysis Report, Section 15.0-1, Figure 15.0-1A to 15.0-31
ML16207A68928 April 2016Revision 18 to Updated Final Safety Analysis Report, Section 7.3, Figure 7.3-1 to Figure 7.3-29
ML16207A63328 April 2016Revision 18 to Updated Final Safety Analysis Report, Section 15.3, Figure 15.3-1 to 15.3-20
ML16207A64928 April 2016Revision 18 to Updated Safety Analysis Report, Section 2.3, Figure 2.3-1 Through Figure 2.3-18
ML16207A56128 April 2016Revision 18 to Updated Final Safety Analysis Report, Chapter 12, Radiation ProtectionHigh Radiation Area
Anticipated operational occurrence
Coatings
Annual Radioactive Effluent Release Report
Deep Dose Equivalent
Fuel cladding
Scaffolding
ML16207A69028 April 2016Revision 18 to Updated Final Safety Analysis Report, Section 7.4, Figure 7.4-1 to Figure 7.4-13
ML16207A69928 April 2016Revision 18 to Updated Final Safety Analysis Report, Section 8.3, Figure 8.3-1 to Figure 8.3-14