Issue date | Title | Topic | |
---|---|---|---|
ML22138A202 | 28 April 2022 | Submittal of Revision 21 to Updated Final Safety Analysis Report | Shutdown Margin |
ML22140A081 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | Safe Shutdown Boric Acid Fire Barrier Open Phase Condition Earthquake |
ML22140A079 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications | Stroke time |
ML22140A069 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program | Safe Shutdown Boric Acid Shutdown Margin Hydrostatic Emergency Lighting Power-Operated Valves Pressure Boundary Leakage Power change |
ML22140A071 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Boric Acid Packing leak High Radiation Area Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Safe Shutdown Earthquake Process Control Program Fuel cladding Scaffolding Unidentified leakage |
ML22140A077 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (Redacted) | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Anticipated operational occurrence Water Inventory Control Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Incorporated by reference Design basis earthquake Earthquake Fuel cladding Pressure boundary leak |
ML22140A067 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (Redacted) | Boric Acid Shutdown Margin Loop seal Stroke time Hydrostatic Coatings Earthquake Deep Dose Equivalent Fuel cladding Coast down Unidentified leakage Power Uprate |
ML22140A061 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (Redacted) | Safe Shutdown Boric Acid Health Physics Network Shutdown Margin Loop seal Ultimate heat sink Grab sample Fire Barrier Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Operating Basis Earthquake Emergency Lighting Tornado-Generated Missile Spent Fuel Pool Instrumentation Earthquake Control of Heavy Loads Power-Operated Valves Through Wall Leak Fire Protection Program |
ML22140A056 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance | |
ML22140A064 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 1, Responses to NRC Questions | Hot Short Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Loop seal Ultimate heat sink Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Emergency Lighting Tornado-Generated Missile Design basis earthquake Earthquake Turbine Missile Fuel cladding Liquid penetrant Pressure Boundary Leakage Fire Protection Program Scaffolding Power change Flow Induced Vibration |
ML22140A068 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations | Safe Shutdown Fitness for Duty Probabilistic Risk Assessment Temporary Modification Cyber Security Safeguards Contingency Plan Earthquake Maintenance Rule Program Fire Protection Program Fire Watch |
ML22140A075 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 4 of 4 (Redacted) | Boric Acid |
ML22140A065 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | High Radiation Area Anticipated operational occurrence Coatings Annual Radioactive Effluent Release Report Deep Dose Equivalent Fuel cladding Scaffolding Overexposure |
ML22140A062 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 3 of 4 | |
ML22140A073 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Controlled Drawing Manual Cross-Reference | Boric Acid |
ML22140A078 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Safe Shutdown Loop seal Ultimate heat sink Grab sample Offsite Dose Calculation Manual Stroke time Tornado Missile Internal Flooding Hydrostatic Operating Basis Earthquake Process Control Program Earthquake |
ML22140A080 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | Safe Shutdown Boric Acid Loop seal Grab sample Safe Shutdown Earthquake Weld Overlay Hydrostatic Operating Basis Earthquake Nondestructive Examination Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld Power change Unidentified leakage |
ML22140A076 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 19A, License Renewal | Boric Acid Ultimate heat sink Non-Destructive Examination Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Weld Overlay Hydrostatic Past operability Coatings Nondestructive Examination Aging Management License Renewal Control of Heavy Loads Biofouling EVT-1 Through-Wall Leakage Fire Protection Program Power Uprate |
ML22140A058 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 2 of 4 (Redacted) | |
ML22140A074 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 1 of 4 | |
ML22140A059 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls | Safe Shutdown Boric Acid Fitness for Duty Health Physics Network High winds Shutdown Margin Reactor Vessel Water Level Grab sample Anticipated operational occurrence Safe Shutdown Earthquake Post Accident Monitoring Operator Manual Action Earthquake Fuel cladding Pressure Boundary Leakage Power change |
ML22140A070 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 4, Reactor | Boric Acid Shutdown Margin Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Earthquake Fuel cladding Power change |
ML22140A066 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Redacted) | |
ML22140A060 | 28 April 2022 | 1 to Updated Final Safety Analysis Report, List of Effective Pages | |
ML20133J940 | 29 April 2020 | Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing List | Boric Acid |
ML20133J933 | 29 April 2020 | Submittal of Updated Final Safety Analysis Report, Revision 20 | Cyber Security |
ML20133J939 | 29 April 2020 | Updated Final Safety Analysis Report, Revision 20, List of Effective Pages | |
ML20133J943 | 29 April 2020 | Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 3 of 4) | |
ML20133J938 | 29 April 2020 | Updated Final Safety Analysis Report, Revision 20. (Part 5 of 5, Response to NRC Questions) | Hot Short Safe Shutdown Boric Acid Shutdown Margin Loop seal Ultimate heat sink Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Emergency Lighting Tornado-Generated Missile Design basis earthquake Earthquake Turbine Missile Fuel cladding Liquid penetrant Pressure Boundary Leakage Fire Protection Program Scaffolding Power change Flow Induced Vibration |
ML20133J942 | 29 April 2020 | Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 2 of 4) (Redacted) | |
ML20133J944 | 29 April 2020 | Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 4 of 4) (Redacted) | Loop seal FLEX |
ML20133J941 | 29 April 2020 | Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 1 of 4) | |
ML18130A034 | 30 April 2018 | Project, Units 1 and 2, Submittal of Updated Final Safety Analysis Report, Revision 19 | Open Phase Condition License Renewal Dissimilar Metal Weld |
ML18130A047 | 30 April 2018 | Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 19, Controlled Drawing, Part 2 | |
NOC-AE-18003568, Updated Final Safety Analysis Report, Revision 19, Controlled Drawing, Part 4 | 30 April 2018 | Updated Final Safety Analysis Report, Revision 19, Controlled Drawing, Part 4 | |
ML18130A048 | 30 April 2018 | Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 19, Controlled Drawing, Part 3 | |
ML18130A045 | 30 April 2018 | Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 19, Controlled Drawing Manual Cross-Reference | Boric Acid |
ML18130A046 | 30 April 2018 | Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 19, Controlled Drawing, Part 1 | |
ML16207A665 | 28 April 2016 | Revision 18 to Updated Final Safety Analysis Report, Section 3.6.2, Figure 3.6.2-1 to Figure 3.6.2-8 | |
ML16207A639 | 28 April 2016 | Revision 18 to Updated Final Safety Analysis Report, Section 15.B, Figure 15.B-2 to 15.B-3 | |
ML16207A624 | 28 April 2016 | Revision 18 to Updated Final Safety Analysis Report, Section 11.4, Figure 11.4-1 to 11.4-3 | |
ML16207A647 | 28 April 2016 | Revision 18 to Updated Safety Analysis Report, Section 2.1, Figure 2.1-1 Through Figure 2.1-13 | |
ML16207A618 | 28 April 2016 | Revision 18 to Updated Final Safety Analysis Report, Section 10.3, Figure 10.3-1 to Figure 10.3-5 | |
ML16207A630 | 28 April 2016 | Revision 18 to Updated Final Safety Analysis Report, Section 15.0-1, Figure 15.0-1A to 15.0-31 | |
ML16207A689 | 28 April 2016 | Revision 18 to Updated Final Safety Analysis Report, Section 7.3, Figure 7.3-1 to Figure 7.3-29 | |
ML16207A633 | 28 April 2016 | Revision 18 to Updated Final Safety Analysis Report, Section 15.3, Figure 15.3-1 to 15.3-20 | |
ML16207A649 | 28 April 2016 | Revision 18 to Updated Safety Analysis Report, Section 2.3, Figure 2.3-1 Through Figure 2.3-18 | |
ML16207A561 | 28 April 2016 | Revision 18 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | High Radiation Area Anticipated operational occurrence Coatings Annual Radioactive Effluent Release Report Deep Dose Equivalent Fuel cladding Scaffolding |
ML16207A690 | 28 April 2016 | Revision 18 to Updated Final Safety Analysis Report, Section 7.4, Figure 7.4-1 to Figure 7.4-13 | |
ML16207A699 | 28 April 2016 | Revision 18 to Updated Final Safety Analysis Report, Section 8.3, Figure 8.3-1 to Figure 8.3-14 |