1 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications
ML22140A079
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/28/2022
From:
South Texas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22140A057 List:
References
NOC-AE-22003889
Download: ML22140A079 (24)


Text

STPEGS UFSAR TABLE OF CONTENTS CHAPTER 16 TECHNICAL SPECIFICATIONS Section Title Page 16.0 Technical Specifications 16.1-1 16.1 Technical Requirements Manual 16.1-1 TC 16-1 Revision 13

STPEGS UFSAR TABLE OF CONTENTS CHAPTER 16 TECHNICAL SPECIFICATIONS LIST OF TABLES Table Title Page 16.1-1 Containment Isolation Valves 16.1-2 16.1-2 Reactor Vessel Material Surveillance 16.1-15 Program - Withdrawal Schedule 16.1-3 Reactor Trip System Instrumentation Response Times 16.1-16 16.1-4 Engineered Safety Features Response Times 16.1-18 TC 16-2 Revision 13

STPEGS UFSAR 16.0 TECHNICAL SPECIFICATIONS 16.1 TECHNICAL REQUIREMENTS MANUAL The Technical Requirements Manual is a document containing in part information that has been relocated from the Technical Specifications. Relocation of information from the Technical Specifications to the Technical Requirements Manual is based on the requirements of the Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors issued by the NRC in 1993. The Technical Requirements Manual is considered a licensing basis document and as such overall control of the document is governed by applicable station requirements for control of licensing basis documents.

Changes made to the Technical Requirements Manual are governed by the criteria of 10CFR50.59 to determine if changes require approval by the NRC prior to implementation.

16.1-1 Revision 21

STPEGS UFSAR TABLE 16.1-1 CONTAINMENT ISOLATION VALVES Maximum Isolation Time Penetration Valve No. Function (seconds)

CONTAINMENT ISOLATION PHASE A M-51 CV0033A* CVCS Seal Water Injection 10 M-51 CV0033B* CVCS Seal Water Injection 10 M-52 CV0033C* CVCS Seal Water Injection 10 M-52 CV0033D* CVCS Seal Water Injection 10 M-46 XCV0023 CVCS Letdown 15 M-46 XCV0024 CVCS Letdown 15 M-48 XCV0025 CVCS Charging 15 M-47 CV0077 RCP Seal Water Leakoff Return 10 M-47 CV0079 RCP Seal Water Leakoff Return 10 M-72 ED0064 Containment Normal Sump 10 Discharge M-72 FV-7800 Containment Normal Sump 10 Discharge M-77 FP0756 Containment Fire Protection 10 HISTORIC INFORMATION M-72(1) FV-2453 Containment Sump Post Accident 5 HISTORIC INFORMATION Sample M-86(1) FV-2454 RHR Post Accident Sample 5 CN-3309 and CN-3301 M-85(1) FV-2455 RCS Post Accident Sample 5 M-85(1) FV-2455A RCS Post Accident Sample 5 16.1-2 Revision 21

STPEGS UFSAR TABLE 16.1-1 (Continued)

CONTAINMENT ISOLATION VALVES Maximum Isolation Time Penetration Valve No. Function (seconds)

CONTAINMENT ISOLATION PHASE A (Continued)

HISTORIC INFORMATION HISTORIC INFORMATION M-82(1) FV-2456 Containment Atmosphere Post 5 Accident Sample M-82(1) FV-2457 Containment Atmosphere Post 5 CN-3309 and CN-3301 Accident Sample M-45(1) FV-2458 Liquid Post Accident Sample 5 Discharge M-45 FV-3651 Pressurizer Relief Tank Makeup 10 M-68 FV-3652 Pressurizer Relief Tank Vent 10 M-68 FV-3653 Pressurizer Relief Tank Vent 5 M-68 FV-3970 SIS Check Valve Test 10 M-68 FV-3971 SIS Check Valve Test 10 M-68 FV-3983 Accumulator Nitrogen Supply 10 M-80(1) FV-4135 Containment Hydrogen 5 Monitoring M-80(1) FV-4101 Containment Hydrogen 5 Monitoring M-82(1) FV-4104 Containment Hydrogen 5 Monitoring M-80(1) FV-4127 Containment Hydrogen 5 Monitoring M-80(1) FV-4128 Containment Hydrogen 5 Monitoring M-82(1) FV-4136 Containment Hydrogen 5 Monitoring 16.1-3 Revision 21

STPEGS UFSAR TABLE 16.1-1 (Continued)

CONTAINMENT ISOLATION VALVES Maximum Isolation Time Penetration Valve No. Function (seconds)

CONTAINMENT ISOLATION PHASE A (Continued)

M-82(1) FV-4133 Containment Hydrogen 5 Monitoring M-82(1) FV-4134 Containment Hydrogen 5 Monitoring M-85(1) FV-4450 Pressurizer Vapor Sample 5 M-85(1) FV-4451 Pressurizer Liquid Sample 5 M-85(1) FV-4452 Pressurizer Vapor Sample 10 M-85(1) FV-4451B Pressurizer Liquid Sample 10 M-85(1) FV-4454 RCS Hot Leg Sample 5 M-85(1) FV-4455 RCS Hot Leg Sample 5 M-85(1) FV-4456 RCS Hot Leg Sample 10 N.A. FV-1025 Personnel Air Lock Air Supply 10 N.A. FV-1026 Personnel Air Lock Air Supply 10 N.A. FV-1027 Personnel Air Lock Auto Leak 10 Rate Monitoring N.A. FV-1028 Personnel Air Lock Auto Leak 10 Rate Monitoring M-86(1) FV-4823 RHR Sample 5 M-86(1) FV-4461 RHR Sample 10 M-29(1) FV-4824 SI Accumulator Sample 5 M-29(1) FV-4466 SI Accumulator Sample 10 M-58 FV-8565 Containment Instrument Air 10 M-56 WL0312 RCDT Discharge 10 16.1-4 Revision 21

STPEGS UFSAR TABLE 16.1-1 (Continued)

CONTAINMENT ISOLATION VALVES Maximum Isolation Time Penetration Valve No. Function (seconds)

CONTAINMENT ISOLATION PHASE A (Continued)

M-56 FV-4913 RCDT Discharge 10 M-30 FV-4919 RCDT Vent 10 M-30 FV-4920 RCDT Vent 5 CONTAINMENT VENTILATION ISOLATION M-43(2) FV-9776 Containment Supplementary Purge 5 Supply M-43(2) HC0003 Containment Supplementary Purge 10 Supply M-44(2) HC0005 Containment Supplementary Purge 10 Exhaust M-44(2) FV-9777 Containment Supplementary Purge 5 Exhaust M-42 HC0007 Containment Normal Purge 60 Supply M-42 HC0008 Containment Normal Purge 60 Supply M-41 HC0009 Containment Normal Purge 60 Exhaust M-41 HC0010 Containment Normal Purge 60 Exhaust M-80 RA0001 Containment Atmosphere 10 Radiation Monitor M-80 RA0003 Containment Atmosphere 10 Radiation Monitor 16.1-5 Revision 21

STPEGS UFSAR TABLE 16.1-1 (Continued)

CONTAINMENT ISOLATION VALVES Maximum Isolation Time Penetration Valve No. Function (seconds)

CONTAINMENT VENTILATION ISOLATION (Continued)

M-80 RA0004 Containment Atmosphere 10 Radiation Monitor M-80 RA0006 Containment Atmosphere 10 Radiation Monitor CONTAINMENT ISOLATION PHASE B M-39 CC0291 CCW to RCPs 10 M-39 CC0318 CCW to RCPs 10 M-40 CC0403 CCW from RCPs 10 M-40 CC0404 CCW from RCPs 10 M-40 CC0542 CCW from RCPs 10 M-40 FV-4493 CCW from RCPs 10 REMOTE MANUAL M-83(3) AF0019 AFW Supply N.A M-94(3) AF0048 AFW Supply N.A.

M-95(3) AF0065 AFW Supply N.A.

M-84(3) AF0085 AFW Supply N.A.

M-33 CC0012 CCW to RHR HX and RHR Pump N.A.

M-34 CC0049 CCW from RHR HX and RHR N.A Pump M-34 CC0050 CCW from RHR HX and RHR N.A.

Pump M-25 CC0057 CCW to RCFC N.A.

M-26 CC0068 Cooling Water from RCFC N.A 16.1-6 Revision 21

STPEGS UFSAR TABLE 16.1-1 (Continued)

CONTAINMENT ISOLATION VALVES Maximum Isolation Time (seconds)

Penetration Valve No. Function REMOTE MANUAL (Continued)

M-26 CC0069 CCW from RCFC N.A.

M-35 CC0122 CCW to RHR HX and RHR Pump N.A.

M-36 CC0129 CCW from RHR HX and RHR Pump N.A.

M-36 CC0130 CCW from RHR HX and RHR Pump N.A.

M-27 CC0136 CCW to RCFC N.A.

M-28 CC0147 Cooling Water from RCFC N.A.

M-28 CC0148 CCW from RCFC N.A.

M-37 CC0182 CCW to RHR HX and RHR Pump N.A.

M-38 CC0189 CCW from RHR HX and RHR Pump N.A.

M-38 CC0190 CCW from RHR HX and RHR Pump N.A.

M-24 CC0197 CCW to RCFC N.A.

M-23 CC0208 Cooling Water from RCFC N.A.

M-23 CC0210 CCW From RCFC N.A.

M-1(3) MS0143 Main Steam Supply to AFW Turbine N.A.

M-1(3) FV-0143 Bypass for MS Supply to AFW N.A.

Turbine M-18 XSI0004A High Head SI Discharge N.A.

M-14 XSI0004B High Head SI Discharge N.A.

M-10 XSI0004C High Head SI Discharge N.A.

M-22 XSI0016A Emergency Sump Recirculation N.A.

M-21 XSI0016B Emergency Sump Recirculation N.A.

M-20 XSI0016C Emergency Sump Recirculation N.A.

16.1-7 Revision 21

STPEGS UFSAR TABLE 16.1-1 (Continued)

CONTAINMENT ISOLATION VALVES Maximum Isolation Time Penetration Valve No. Function (seconds)

REMOTE MANUAL (Continued)

M-19 XSI0018A Low Head SI Discharge N.A.

M-15 XSI0018B Low Head SI Discharge N.A.

M-11 XSI0018C Low Head SI Discharge N.A.

M-17(6) XCS0001A Containment Spray to Ring N.A.

Header M-13(6) XCS0001B Containment Spray to Ring N.A.

Header M-9(6) XCS0001C Containment Spray to Ring N.A.

Header MANUAL AND CHECK VALVES M-82(4) BA0004 Breathing Air to Containment N.A.

M-82 BA0006 Breathing Air to Containment N.A.

M-33 CC0013 CCW to RHR HX and RHR Pump N.A.

M-25 CC0058 Cooling Water to RCFC N.A.

M-35 CC0123 CCW to RHR HX and RHR Pump N.A.

M-27 CC0138 Cooling Water to RCFC N.A.

M-37 CC0183 CCW to RHR HX and RHR Pump N.A.

M-24 CC0198 Cooling Water to RCFC N.A.

M-39 CC0319 CCW to RCPs N.A.

M-40 CC0446 CCW from RCPs N.A.

M-46 CV0022 CVCS Letdown N.A.

M-51 CV0034A CVCS Seal Water Injection N.A.

M-51 CV0034B CVCS Seal Water Injection N.A.

16.1-8 Revision 21

STPEGS UFSAR TABLE 16.1-1 (Continued)

CONTAINMENT ISOLATION VALVES Maximum Isolation Time Penetration Valve No. Function (seconds)

MANUAL AND CHECK VALVES (Continued)

M-52 CV0034C CVCS Seal Water Injection N.A.

M-52 CV0034D CVCS Seal Water Injection N.A.

M-47 CV0078 CVCS Seal Water Leakoff Return N.A.

M-48 XCV0026 CVCS Charging N.A.

M-53 XCV0157 CVCS to RHR N.A.

M-53 XCV0158 CVCS to RHR N.A.

M-17 XCS0002 Containment Spray Header N.A.

M-13 XCS0004 Containment Spray Header N.A.

M-13 XCS0005 Containment Spray Header N.A.

M-9 XCS0006 Containment Spray Header N.A.

M-61(4) DW0501 Demineralized Water Supply N.A.

M-61 DW0502 Demineralized Water Supply N.A.

M-58 IA0541 Instrument Air to Containment N.A.

M-70 XFC0006C In Containment Spent Fuel Storage N.A.

to SFP Pump M-70 XFC0007C In Containment Spent Fuel Storage N.A.

to SFP Pump M-69 XFC0013E SFP HX Return to Containment N.A.

M-69 XFC0013F SFP HX Return to Containment N.A.

M-69 XFC0050 SFP HX Return to Containment N.A.

M-77 FP0943 Containment Fire Protection N.A.

M-2(4) MS-0543 Main Steam Line Drain N.A.

M-3(4) MS-0544 Main Steam Line Drain N.A.

M-4(4) MS-0545 Main Steam Line Drain N.A.

M-1(4) MS-0546 Main Steam Line Drain N.A.

M-45 XRC0046 Makeup to Pressurizer Relief Tank N.A.

16.1-9 Revision 21

STPEGS UFSAR TABLE 16.1-1 (Continued)

CONTAINMENT ISOLATION VALVES Maximum Isolation Time Penetration Valve No. Function (seconds)

MANUAL AND CHECK VALVES (Continued)

M-88 RD0008 Reactor Coolant Vacuum N.A.

Degassing M-88 RD0010 Reactor Coolant Vacuum N.A.

Degassing M-55 XRH0063B Refueling Cavity to RWST N.A.

M-76 XRH0063C Refueling Cavity to RWST N.A.

M-55 XRH0064B Refueling Cavity to RWST N.A.

M-76 XRH0064C Refueling Cavity to RWST N.A.

M-57(4) SA0504 Service Air N.A.

M-57 SA0505 Service Air N.A.

M-16 SL0002 Sludge Lancing High Pressure N.A.

M-16 SL0004 Sludge Lancing High Pressure N.A.

M-79 SL0012 Sludge Lancing Low Pressure N.A.

M-79 SL0014 Sludge Lancing Low Pressure N.A.

M-12 SL0027 Chemical Cleaning Return N.A.

M-12 SL0029 Chemical Cleaning Return N.A.

M-81 Penetration has been capped M-75 P00217 RCP Oil Return N.A.

M-75 P00218 RCP Oil Return N.A.

M-18 XSI0005A High Head SI Discharge N.A.

M-14 XSI0005B High Head SI Dishcharge N.A.

M-10 XSI0005C High Head SI Discharge N.A.

16.1-10 Revision 21

STPEGS UFSAR TABLE 16.1-1 (Continued)

CONTAINMENT ISOLATION VALVES Maximum Isolation Time Penetration Valve No. Function (seconds)

MANUAL AND CHECK VALVES (Continued)

M-19 XSI0030A Low Head SI Discharge N.A.

M-15 XSI0030B Low Head SI Discharge N.A.

M-11 XSI0030C Low Head SI Discharge N.A.

M-68 SI0058 Accumulator Nitrogen Supply N.A.

OTHER AUTOMATIC VALVES (SI Actuated Valves)

M-25 CC0059 RCFC Chilled Water Supply 10 M-26 CC0070 RCFC Chilled Water Return 10 M-26 FV-0862 RCFC Chilled Water Return 10 M-27 CC0137 RCFC Chilled Water Supply 10 M-28 CC0149 RCFC Chilled Water Return 10 M-28 FV-0863 RCFC Chilled Water Return 10 M-24 CC0199 RCFC Chilled Water Supply 10 M-23 CC0209 RCFC Chilled Water Return 10 M-23 FV-0864 RCFC Chilled Water Return 10 OTHER AUTOMATIC VALVES (Steam Line Isolation Actuated Valves)

M-2(3) FV-7412 Main Steam Isolation Bypass 5 M-3(3) FV-7422 Main Steam Isolation Bypass 5 M-4(3) FV-7432 Main Steam Isolation Bypass 5 M-1(3) FV-7442 Main Steam Isolation Bypass 5 M-2(3, 5) FSV-7414 Main Steam Isolation 5 16.1-11 Revision 21

STPEGS UFSAR TABLE 16.1-1 (Continued)

CONTAINMENT ISOLATION VALVES Maximum Isolation Time Penetration Valve No. Function (seconds)

OTHER AUTOMATIC VALVES B (Steam Line Isolation Actuated Valves) (Continued)

M-3(3, 5) FSV-7424 Main Steam Isolation 5 M-4(3, 5) FSV-7434 Main Steam Isolation 5 M-1(3, 5) FSV-7444 Main Steam Isolation 5 OTHER AUTOMATIC VALVES (Feedwater Isolation Actuated Valves)

M-6(3, 7) FV-7141 Feedwater Isolation 10 M-83(3) FV-7192 Feedwater Isolation - SG 10 Preheater Bypass M-7 (3, 7)- FV-7142 Feedwater Isolation 10 M-84(3) FV-7191 Feedwater Isolation - SG 10 Preheater Bypass M-8(3, 7) FV-7143 Feedwater Isolation 10 M-94(3) FV-7189 Feedwater Isolation - SG 10 Preheater Bypass M-5(3, 7) FV-7144 Feedwater Isolation 10 M-95(3) FV-7190 Feedwater Isolation - SG 10 Preheater Bypass M-5(3) FV-7145A Feedwater Isolation Valve Bypass 10 16.1-12 Revision 21

STPEGS UFSAR TABLE 16.1-1 (Continued)

CONTAINMENT ISOLATION VALVES Maximum Isolation Time Penetration Valve No. Function (seconds)

OTHER AUTOMATIC VALVES (Feedwater Isolation Actuated Valves) (Continued)

M-8(3) FV-7146A Feedwater Isolation Valve Bypass 10 M-7(3) FV-7147A Feedwater Isolation Valve Bypass 10 M-6(3) FV-7148A Feedwater Isolation Valve Bypass 10 OTHER AUTOMATIC VALVES (Auxiliary Feedwater Initiation Actuated Valves)

M-62(3) FV-4150 Steam Generator Blowdown 35 M-65(3) FV-4151 Steam Generator Blowdown 35 M-64(3) FV-4152 Steam Generator Blowdown 35 M-63(3) FV-4153 Steam Generator Blowdown 35 M-86(3) FV-4186 Steam Generator Sample 5 M-86(3) FV-4187 Steam Generator Sample 5 M-86(3) FV-4188 Steam Generator Sample 5 M-86(3) FV-4189 Steam Generator Sample 5 16.1-13 Revision 21

STPEGS UFSAR Notes to Table 16.1-1

  • Valves isolate on concurrent Containment Phase A isolation and low charging header pressure signals.
1. Valves opened only when sample needed.
2. Valve could be opened during normal operation, as needed.
3. Not subject to Type C Leakage Tests.
4. May be opened on an intermittent basis under administrative control.
5. These valves are included for table completeness. The requirements of Technical Specification 3/4.6.3 do not apply; instead, the requirements of Technical Specification 3/4.7.1.5 apply to the main steam isolation valves.
6. These valves are included for table completeness. The requirements of Technical Specification 3/4.6.3 do not apply; instead, the requirements of Technical Specification 4.6.2.1 apply. Valve stroke times, where specified, will be tested pursuant to Technical Specification 4.0.5.
7. These valves are included for table completeness. The requirements of Technical Specification 3/4.6.3 do not apply; instead, the requirements of Technical Specification 3/4.7.1.7 apply to the feedwater isolation valves.

CN-3309 and CN-3301 16.1-14 Revision 21

STPEGS UFSAR TABLE 16.1-2 REACTOR VESSEL MATERIAL SURVEILLANCE PROGRAM -

WITHDRAWAL SCHEDULE Unit 1 VESSEL LEAD ACTUAL/RECOMMENDED CAPSULE LOCATION FACTOR WITHDRAWAL NUMBER (degrees) (Capsule) TIME (EFPY)

U 58.5o 3.59(1) 0.78 (Removed)(4)

Y 241.0o 3.28(1) 4.9 (Removed)(4)

V 61.0o 3.04(2) 11.13 (Removed)(4)

X 238.5o 3.28(3) N/A W 121.5o 3.24(3) 18(5)

Z 301.5o 3.24(3) N/A Unit 2 VESSEL LEAD ACTUAL/RECOMMENDED CAPSULE LOCATION FACTOR WITHDRAWAL NUMBER (degrees) (Capsule) TIME (EFPY)(c)

V 61.0o 3.09(1) 0.87 (Removed)(4)

Y 241.0o 3.11(1) 5.13 (Removed)(4)

U 58.5o 3.20(2) 10.31 (Removed)(4)

X 238.5o 3.22(3) N/A W 121.5o 3.19(3) 18(5)

Z 301.5o 3.19(3) N/A

1. Lead factor derived from reanalysis of sensor sets from previously withdrawn capsules
2. Lead factor calculated based on actual end of cycle fluence
3. Lead factor based on cycle specific exposure calculations for current fluence
4. Actual Effective Full Power Years (EFPY) at removal
5. Recommended removal time in EFPY. These values are approximate and are selected to ensure that excessive exposure is not attained.

16.1-15 Revision 21

STPEGS UFSAR TABLE 16.1-3 REACTOR TRIP SYSTEM INSTRUMENTATION RESPONSE TIMES FUNCTIONAL UNIT RESPONSE TIME

1. Manual Reactor Trip N.A.
2. Power Range, Neutron Flux 0.5 second*
3. Power Range, Neutron Flux, High Positive Rate 0.5 second*
4. Intermediate Range, Neutron Flux N.A.
5. Source Range, Neutron Flux 0.5 second*
6. Extended Range, Neutron Flux N.A.
7. Overtemperature T 10.0 seconds*
8. Overpower T 10.0 seconds*
9. Pressurizer Pressure - - Low 2 seconds
10. Pressurizer Pressure - - High 2 seconds
11. Pressurizer Water Level - - High 2 seconds 16.1-16 Revision 21

STPEGS UFSAR TABLE 16.1-3 (Continued)

REACTOR TRIP SYSTEM INSTRUMENTATION RESPONSE TIMES FUNCTIONAL UNIT RESPONSE TIME

12. Reactor Coolant Flow - - Low
a. Single Loop (Above P-8) 1 second
b. Two Loops (Above P-7 and below P-8) 1 second
13. Steam Generator Water Level - - Low - Low 2 seconds
14. Undervoltage - Reactor Coolant Pumps 1.5 seconds
15. Underfrequency - Reactor Coolant Pumps 0.6 second
16. Turbine Trip
a. Low Emergency Trip Fluid Pressure N.A.
b. Turbine Stop Valve Closure N.A.
17. Safety Injection Input from ESFAS N.A.
18. Reactor Trip System Interlocks N.A.
19. Reactor Trip Breakers N.A.
20. Automatic Trip and Interlock Logic N.A.
  • Neutron detectors are exempt from response time testing. Response time of the neutron flux signal portion of the channel shall be measured from detector output or input of first electronic component in channel.

16.1-17 Revision 21

STPEGS UFSAR TABLE 16.1-4 ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATION SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS

1. Manual Initiation
a. Safety Injection (ECCS) N.A.
b. Containment Spray N.A.
c. Phase A Isolation N.A.
d. Phase B Isolation N.A.
e. Containment Ventilation Isolation N.A.
f. Steam Line Isolation N.A.
g. Feedwater Isolation N.A.
h. Auxiliary Feedwater N.A.
i. Essential Cooling Water N.A.
j. Reactor Containment Fan Coolers N.A.
k. Control Room Ventilation N.A.
l. Reactor Trip N.A.
m. Start Diesel Generator N.A.
2. Containment Pressure - - High - 1
a. Safety Injection (ECCS) 27(1)/12(5) 1).Reactor Trip 2 (3) 2).Feedwater Isolation 12(3) 3).Phase A Isolation 33(1) / 23(2) 4).Containment Ventilation Isolation 23(1) / 13(2)

(18-inch lines) 5).Auxiliary Feedwater 60 6).Essential Cooling Water 62(1) / 52(2) 7).Reactor Containment Fan Coolers 38(1) / 28(2) 8).Control Room Ventilation N.A.

9).Start Standby Diesel Generators 12 16.1-18 Revision 21

STPEGS UFSAR TABLE 16.1-4 (Continued)

ENGINEERED SAFETY FEATURES RESPONSE TIME INITIATION SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS

3. Pressurizer Pressure - - Low
a. Safety Injection (ECCS) 27(1)/12(5)
1) Reactor Trip 2 (3)
2) Feedwater Isolation 12(3)
3) Phase A Isolation 33(1) / 23(2)
4) Containment Ventilation Isolation N.A
5) Auxiliary Feedwater 60
6) Essential Cooling Water 62(1) / 52(2)
7) Reactor Containment Fan Coolers 38(1) / 28(2)
8) Control Room Ventilation N.A.
9) Start Standby Diesel Generators 12
4. Deleted
5. Compensated Steam Line Pressure -- Low
a. Safety Injection (ECCS) 22(4)/12(5)
1) Reactor Trip 2 (3)
2) Feedwater Isolation 12(3)
3) Phase A Isolation 33(1) / 23(2)
4) Containment Ventilation Isolation N.A.
5) Auxiliary Feedwater 60
6) Essential Cooling Water 62(1) / 52(2)
7) Reactor Containment Fan Coolers 38(1) / 28(2)
8) Control Room Ventilation N.A.
9) Start Diesel Generators 12
b. Steam Line Isolation 8(3) 16.1-19 Revision 21

STPEGS UFSAR TABLE 16.1-4 (Continued)

ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATION SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS

6. Containment Pressure - - High - 3
a. Containment Spray 30(1) / 20(2)
b. Phase B Isolation 28(1) / 18(2)
7. Containment Pressure - - High - 2 Steam Line Isolation 7(3)
8. Steam Line Pressure - Negative Rate - - High N.A Steam Line Isolation
9. Steam Generator Water Level - - High - High
a. Turbine Trip 2.5(3) (N/A in MODES 2 & 3)
b. Feedwater Isolation 12(3)
10. Steam Generator Water Level - - Low - Low
a. Motor-Driven Auxiliary Feedwater Pumps 60
b. Turbine-Driven Auxiliary Feedwater Pump 60
11. RWST Level - - Low-Low Coincident with Safety Injection Automatic Switchover to Containment Sump 32(2)
12. Loss of Power
a. 4.16 kV ESF Bus Undervoltage 12(7)

(Loss of Voltage)

b. 4.16 kV ESF Bus Undervoltage 49(7)

(Tolerable Degraded Voltage Coincident with Safety Injection)

c. 4.16 kV ESF Bus Undervoltage 65(7)

(Sustained Degraded Voltage) 16.1-20 Revision 21

STPEGS UFSAR TABLE 16.1-4 (Continued)

ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATION SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS

13. Deleted
14. Deleted
15. Deleted N.A.
16. Tavg - Low Coincident with Reactor Trip Feedwater Isolation
17. Control Room Intake Air Radioactivity--High N.A.

Control Room Ventilation

18. Deleted
19. Charging Header Pressure - Low N.A.

16.1-21 Revision 21

STPEGS UFSAR TABLE 16.1-4 (Continued)

TABLE NOTATIONS (1) Diesel generator starting and sequence loading delays included.

(2) Diesel generator starting delay not included, sequence loading delay is included. Offsite power available.

(3) Not dependent upon diesel generator starting or sequence loading delays.

(4) Diesel generator starting and sequence loading delay included. Low Head Safety Injection pumps not included.

(5) Diesel generator starting delays not included, sequence loading delay is included. Low Head Safety Injection pumps not included.

(6) Actuation times for Control Room Ventilation do not include the opening times for the modulating damper.

(7) Diesel generator starting delay is included, sequence loading delay is not included.

16.1-22 Revision 21