Issue date | Title | Topic | |
---|---|---|---|
ML20059L010 | 19 September 1990 | Provides Addl Response to Violations Noted in Insp Repts 50-369/90-11 & 50-370/90-11,per .Corrective Action:Operations & Compliance Mgt Further Examined Event & Concluded That Trains Vc/Yc Inoperable Per Special Order | |
ML20059L009 | 18 September 1990 | Informs of Delay in Response to Violations Noted in Insp Repts 50-369/90-14 & 50-370/90-14.Delay Due to Ongoing Review | |
ML20059J712 | 14 September 1990 | Forwards Monthly Operating Rept for Aug 1990 for McGuire Nuclear Station Units 1 & 2 & Monthly Operating Status Rept for Jul 1990 | |
ML20059L549 | 14 September 1990 | Forwards Proprietary Response to Question Re Scope of Review of Topical Rept, Safety Analysis Physics Parameter & Multidimensional Reactor Transients Methodology, Per & 900723 Meeting.Response Withheld | |
ML20059L552 | 14 September 1990 | Forwards Response to 18 Questions Re Topical Rept DPC-NE-2004,per NRC 900802 Request for Addl Info.Encl Withheld (Ref 10CFR2.790) | Affidavit |
ML20065D467 | 11 September 1990 | Informs of Delay in Response to Violation Noted in Insp Repts 50-369/90-11 & 50-370/90-11,per Commitment in | |
ML20064A803 | 10 September 1990 | Responds to NRC Ltr Re Violations Noted in Insp Repts 50-369/90-13 & 50-370/90-13.Corrective Actions:Procedures Dealing W/Fuel Handling Will Be Enhanced by Adding Sign Off to Sections Which Ref Fuel Handling in Tech Specs | |
ML20059G301 | 4 September 1990 | Forwards Response to NRC 900327 Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire | |
ML20064A574 | 4 September 1990 | Discusses Re Info to Support Util Position Relative to Resolving Issue of Main Steam Line Breaks Inside Ice Condenser Containments & Requests That Info Be Withheld (Ref 10CFR2.790) | |
ML20064A567 | 1 September 1990 | Advises That Corrective Actions Re Violation of Insp Rept 50-369/89-01 & 50-370/89-01 Will Be Completed by 910101 | |
ML20059D346 | 30 August 1990 | Forwards Semiannual Effluent Release Rept for First Half of CY90 & Revs to Process Control Program | Process Control Program |
ML20059D190 | 22 August 1990 | Responds to Violations Noted in Insp Repts 50-369/90-11 & 50-370/90-11.Corrective Actions:Valves VC-1,VC-2,VC-3,VC-4, VC-9,VC-10,VC-11 & VC-12 Reopened Upon Discovery of VC-1 - VC-4 Being Closed & Procedure IP/0/13/3006/09 Revised | |
ML20059G914 | 22 August 1990 | Forwards Public Version of Revised Epips,Including Change 0 to RP/O/A/5700/01,Change 0 to RP/O/A/5700/02 & Change 0 to RP/O/A/5700/03 | |
ML16259A239 | 22 August 1990 | Forwards Public Version of Rev 27 to Company Crisis Mgt Implementing Procedure CMIP-2, News Group Plan. W/ Dh Grimsley 900906 Release Memo | |
ML20059B445 | 20 August 1990 | Requests That NRC Approval of Original Relief Request 89-02 Be Extended to Include Changes to Mods MG-22233 & MG-22243 as Described.Hydrostatic Testing Impractical Due to Inadequacy of Test Boundaries | Hydrostatic |
ML20059C120 | 20 August 1990 | Forwards Rept Summarizing Util Findings Re Three False Negative Blind Performance Urine Drug Screens Which Occurred During Jan & Feb 1990.Recommends That NRC Consider Generic Communication to Clearly State Reporting Requirement | |
ML20059C159 | 17 August 1990 | Suppls by Providing Addl Info to Support Util Position Re Anl Confirmatory Analysis of Main Steamline Breaks in Ice Condenser Plants.Encl Withheld | |
ML20063Q090 | 15 August 1990 | Forwards Monthly Operating Repts for Jul 1990 for McGuire Nuclear Station Units 1 & 2 & Revised Rept for June 1990 | |
ML20063Q267 | 14 August 1990 | Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 36 to CMIP-1,Rev 32 to CMIP-4,Rev 36 to CMIP-5,Rev 41 to CMIP-6,Rev 40 to CMIP-7,Rev 27 to CMIP-8 & Rev 35 to CMIP-9.W/DH Grimsley 900821 Release Memo | |
ML20058N018 | 8 August 1990 | Forwards Response to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire | |
ML20063Q018 | 7 August 1990 | Confirms That Planned Corrective Actions Listed in Paragraph 3 of Insp Repts 50-369/90-10 & 50-370/90-10,appropriately Described | |
ML20058L181 | 1 August 1990 | Forwards Safety Evaluation of Large Break LOCA Event Reanalysis Per 10CFR50.46 Re Peak Clad Temp Increases | Stroke time |
ML20058L406 | 1 August 1990 | Forwards Rev 0 to Inservice Insp Rept Unit 1 McGuire 1990 Refueling Outage 6 | |
ML20059K029 | 1 August 1990 | Forwards Comments on Reactor Operator & Senior Reactor Operator Written Exams Administered on 900730 | |
ML20056A954 | 1 August 1990 | Provides Final Response to NUREG-0737,Item II.D.1, Performance Testing of Safety Relief Valves. Util Will Change Seal Configuration for Existing Valves to Seal on Steam Medium & Install Continuous Drain for Loop Piping | |
ML20056A157 | 23 July 1990 | Forwards Public Version of Change 0 to RP/0/A/5700/10 & Rev 25 to Section 18.2 of Radiation Protection Manual.W/ Dh Grimsley 900730 Release Memo | |
NLS9000259, Responds to Violations Noted in Insp Repts 50-369/90-09 & 50-370/90-09.Corrective actions:in-house Training Will Be Provided on Correct Method for Determining Proper Response to Problem Investigation Processes | 16 July 1990 | Responds to Violations Noted in Insp Repts 50-369/90-09 & 50-370/90-09.Corrective actions:in-house Training Will Be Provided on Correct Method for Determining Proper Response to Problem Investigation Processes | |
ML20055F772 | 13 July 1990 | Forwards Monthly Operating Repts June 1990 for McGuire Nuclear Station Units 1 & 2 & Status Rept for May 1990 | |
ML20044B056 | 3 July 1990 | Forwards Public Version of Epips,Consisting of RP/0/A/5700/02 & RP/0/A/5700/03 & RP/0/A/5700/04.W/ Dh Grimsley 900716 Release Memo | |
ML20055C985 | 25 June 1990 | Forwards Rev 9 to Training & Qualification Plan.Rev Withheld | |
ML16152A984 | 19 June 1990 | Forwards Revised Public Version of Rev 90-03 to Vol B of Epips,Including CP/2/A/2002/04C, Operating Procedure for Post-Accident Liquid Sampling, & Maint Directive 8.1 | |
ML20044A794 | 19 June 1990 | Forwards Public Version of Epips,Including HP/0/B/1009/06, HP/0/B/1009/10 & HP/0/B/1009/20 | |
ML20043H554 | 18 June 1990 | Forwards Supplemental Info to Tech Spec Rev Request Re Auxiliary Bldg Filtered Ventilation Sys | |
ML20043G153 | 15 June 1990 | Forwards Monthly Operating Repts for May 1990 & Corrected Unit Shutdowns & Power Reductions for Apr 1990 | |
ML16152A982 | 14 June 1990 | Forwards Public Version of Rev 90-02 to Vol B to Oconee Nuclear Station Epips. W/Dh Grimsley 900627 Release Memo | |
ML20044A449 | 14 June 1990 | Forwards Public Version of Rev 90-05 to Vol C to EPIP Manual. W/Dh Grimsley 900627 Release Memo | |
ML20043G174 | 7 June 1990 | Responds to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire. Correct RCS Operating Pressure Would Be 2,250 Psia as Identified in Table 3-1 | |
ML20043G345 | 7 June 1990 | Forwards Proprietary Response to Request for Addl Info Re Topical Rept BAW-10174, Mark-BW Reload Safety Analysis for Catawba & Mcguire. Response Withheld | Affidavit |
ML20043G717 | 6 June 1990 | Forwards Population Dose Analysis Summary for Plant Liquid Release Pathways Based on 1986 Release Estimates | |
ML20043G632 | 5 June 1990 | Responds to Violations Noted in Insp Repts 50-369/90-01 & 50-370/90-01.Corrective Actions:Memo Issued Reemphasizing Importance of Frisking & Outlining Frisking Requirement & Personnel Counseled Re Completing Required Documentation | |
ML20043G628 | 4 June 1990 | Advises That Corrective Actions Re Departmental Interface Issues to Resolve & Train on Revised Directive Will Be Completed by 900901,per Insp Repts 50-369/89-01 & 50-370/89-01 | |
ML20043E257 | 31 May 1990 | Forwards Request for Relief 90-01 from Requirements of Section XI of ASME Boiler & Pressure Vessel Code Re Inservice Insp During Second 10-yr Interval | |
ML20043F476 | 30 May 1990 | Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Consisting of Rev 20 to CMIP-13 & Deletion of CMIP-15 & CMIP-17.W/900612 Release Memo | |
ML20043B569 | 23 May 1990 | Advises That Responses to Violations Noted in Insp Repts 50-369/90-01 & 50-370/90-01 Will Be Delayed Until 900601 | |
ML20043C078 | 22 May 1990 | Responds to Violations Noted in Insp Repts 50-369/90-04 & 50-370/90-04.Corrective Actions:Correct Procedure Adherence Reemphasized to Job Supervisor & Engineering Group Involved in Authorization for Torque Change | Fire Barrier Continuous fire watch Fire Watch Hourly Fire Watch |
ML20043A544 | 16 May 1990 | Discusses Status of Safety & Performance Improvement Program Portion of B&W Owners Group EOP Review Project | |
ML20043B935 | 16 May 1990 | Forwards Public Version of Epips,Including HP/1/B/1009/15 & HP/2/B/1009/15.W/DH Grimsley 900529 Release Memo | |
ML20043A104 | 15 May 1990 | Forwards Monthly Operating Rept for Apr 1990 & Corrected Mar 1990 for McGuire Nuclear Station Units 1 & 2 | |
ML20042G822 | 10 May 1990 | Forwards Addl Info Re Events Leading to 900509 Emergency Tech Spec (TS) Request Re TS 4.6.1.8,per Ds Hood 900510 Telcon & Requests That Changes Also Be Made to Unit 2 Ts. Proposed TS Encl | |
ML20043A862 | 10 May 1990 | Forwards Info for Facility 1990 Refueling Outage Re Steam Generator F* Tubes & Tubes Removed from Svc or Repaired |