ML24032A466 | 16 January 2024 | Response to Comments on Draft Vpdes Permit No. VA0052451 | |
ML23214A194 | 5 September 2023 | Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information - Report | Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
ML23167B007 | 31 May 2023 | Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary | Subsequent License Renewal |
ML23103A228 | 12 April 2023 | Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code | Shutdown Margin Anticipated operational occurrence Post Accident Monitoring B.5.b Exemption Request Fuel cladding Fire Protection Program |
ML22263A285 | 23 May 2022 | Alert and Notification System Evaluation Report_Ans Evaluation_Redacted Page 1-65 | |
ML22263A364 | 23 May 2022 | Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 1 - 95 | |
ML22263A369 | 1 May 2022 | Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 96-190 | |
ML22119A172 | 13 April 2022 | Post-Accident Monitoring (PAM) Report | Post Accident Monitoring |
ML21175A247 | 24 June 2021 | 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- | |
ML21042B321 | 11 February 2021 | Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code | |
ML20296A680 | 22 October 2020 | ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative S1-I5-ISL-05 and S2-15-ISL-06 | Finite Element Analysis Weak link |
ML20246G706 | 24 August 2020 | Enclosure 4: Attachment 1 - PWROG-18005-NP, Revision 2, Determination of Unirradiated Rt and Upper-Shelf Values of the North Anna Units 1 and 2 Reactor Vessel Materials | |
ML20203M160 | 20 July 2020 | VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status | Anchor Darling |
ML20149K671 | 31 May 2020 | PWROG-19047-NP, Revision 0, North Anna, Units 1 and 2, Reactor Vessels Low Upper-Shelf Fracture Toughness Equivalent Margin Analysis | Incorporated by reference Finite Element Analysis |
ML20140A239 | 18 May 2020 | ASME Section XI Inservicee Inspection Program Proposed Inservice Inspection Alternative N1-15-NDE-002 | Boric Acid High Radiation Area Non-Destructive Examination Finite Element Analysis EVT-1 Pressure Boundary Leakage |
ML20246G701 | 31 March 2020 | Enclosure 4: Attachment 3 - WCAP-18364-NP, Rev. 1, North Anna Units 1 and 2 Time-Limited Aging Analysis on Reactor Vessel Integrity for Subsequent License Renewal (SLR) | Incorporated by reference Exemption Request |
ML20090B397 | 26 March 2020 | Revised License Renewal Commitment Pressurizer Surge Line Weld Inspection Frequency | Weld Overlay Operating Basis Earthquake Finite Element Analysis License Renewal Subsequent License Renewal |
ML20246G707 | 31 January 2020 | Enclosure 4: Attachment 4 - WCAP-11164-NP, Rev. 2, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for North Anna Units 1 and 2 Nuclear Power Plants for the Subsequent License Renewal | Safe Shutdown Earthquake Weld Overlay Hydrostatic Pressure Boundary Leakage Pressure boundary leak Dissimilar Metal Weld |
ML19249B768 | 29 August 2019 | Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) | Safe Shutdown Boric Acid Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Reserve Station Service Transformer Operating Basis Earthquake Operator Manual Action Emergency Lighting FLEX Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML19249B772 | 29 August 2019 | Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) | Safe Shutdown Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Internal Flooding Reserve Station Service Transformer Operating Basis Earthquake Operator Manual Action FLEX Design basis earthquake Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML19249B774 | 29 August 2019 | Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) | Safe Shutdown Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Internal Flooding Reserve Station Service Transformer Operating Basis Earthquake Operator Manual Action FLEX Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML19249B778 | 29 August 2019 | Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1 | |
ML19235A068 | 19 August 2019 | 3M Interam Website | Fire Barrier Coatings Earthquake |
ML19235A069 | 19 August 2019 | Bio K-10 Website | |
ML19235A070 | 19 August 2019 | Cera Blanket Website | |
ML19235A071 | 19 August 2019 | Cerafiber Website | |
ML19235A072 | 19 August 2019 | Duxseal Website | |
ML19235A073 | 19 August 2019 | Gypsum Website | |
ML19235A074 | 19 August 2019 | Kbs Sealbags Website | |
ML19235A080 | 19 August 2019 | Thermo-Lag Website | Coatings |
ML19235A079 | 19 August 2019 | Pyrocrete Website | |
ML19235A078 | 19 August 2019 | Mineral Wool Website | |
ML19235A077 | 19 August 2019 | Micarta Website | |
ML19235A076 | 19 August 2019 | Marinite Website | Coatings |
ML19235A075 | 19 August 2019 | Marinite Slide Plates Products - Piping Tech | |
ML19204A358 | 30 June 2019 | WCAP-18258-NP, Revision 1, Flaw Tolerance Evaluation for Susceptible Reactor Coolant Loop Cast Austenitic Stainless Steel Elbow Components for Surry Units 1 and 2. | Safe Shutdown Earthquake Aging Management Earthquake |
ML19106A356 | 23 April 2019 | Review of Steam Generator Tube Inspection Report for the Cycle 26 Spring 2018 Refueling Outage | |
ML19095A602 | 2 April 2019 | Enclosure 2 - SLRA Mark-Ups Change Notice 2 | Boric Acid Ultimate heat sink Non-Destructive Examination Fire Barrier Coatings Temporary Modification Aging Management Foreign Material Exclusion Moisture barrier License Renewal Subsequent License Renewal Earthquake Control of Heavy Loads Biofouling EVT-1 Liquid penetrant Pressure Boundary Leakage Through Wall Leak Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld Power Uprate Measurement Uncertainty Recapture |
ML19011A174 | 4 January 2019 | Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents | Safe Shutdown Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Reserve Station Service Transformer Operating Basis Earthquake FLEX Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML19011A173 | 4 January 2019 | Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents | Safe Shutdown Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Reserve Station Service Transformer Operating Basis Earthquake FLEX Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML19011A172 | 4 January 2019 | Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) | Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Time to boil Reserve Station Service Transformer Operating Basis Earthquake FLEX Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML20246G709 | 31 October 2018 | Enclosure 4: Attachment 2 - WCAP-18353-NP, Rev. 0, Reactor Internals Fluence Evaluation for a Westinghouse 3-Loop Plant with Two Units - Subsequent License Renewal | Aging Management |
ML18218A171 | 31 July 2018 | Attachment 5, ANP-3676NP, Revision 0, Surry Fuel-Vendor Independent Small Break LOCA Analysis, Licensing Report | Loop seal Hydrostatic |
ML18198A119 | 31 May 2018 | Attachment 5 to 18-233, ANP-3467NP, Rev. 0, North Anna Fuel-Vendor Independent Small Break LOCA Analysis Licensing Report | Loop seal Hydrostatic Exclusive Use Affidavit |
ML17339A175 | 7 September 2017 | Structural Integrity Associates Report No. 1601007.401, September 2017, Flaw Tolerance Evaluation of the Hot Leg Surge Line Nozzles Using ASME Code Section XI, Appendix L. | Operating Basis Earthquake Finite Element Analysis Design basis earthquake |
ML17241A046 | 24 August 2017 | Submittal of Cycle 28 Startup Physics Tests Report | |
ML17251A900 | 5 June 2017 | Enclosure 2, Attachment E to 17-296, WEKO-SEAL - Recommended Installation Procedures for Water and Waste-Water Piping, Miller Pipeline, Revised 03/05/17 | |
ML16355A172 | 20 December 2016 | Storm Surge Technical Evaluation Report Surry Power Station Hazard Reevaluation Review | High winds Hydrostatic |
ML15244B205 | 24 August 2015 | Virginia Electric and Power Company (Dominion) Surry Power Station Unit 1, Cycle 27 Startup Physics Tests Report | |
ML14133A011 | 7 May 2014 | March 12, 2012 Information Request Phase 2 Staffing Assessment Report | Safe Shutdown Health Physics Network High Radiation Area Ultimate heat sink Emergency Lighting FLEX Fukushima Dai-Ichi Severe Accident Management Guideline |