Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23181A15230 June 2023Attachment 2 - LaSalle County Station Units 1 and 2, Pressure and Temperature Limits Report (PTLR) Up to 54 Effective Full-Power Years (Efpy), Revision 3Hydrostatic
Pressure and Temperature Limits Report
RS-23-066, Containment Post-Tensioning System Inservice Inspection Basis for Proposed Extension of Examination Interval Technical Report3 May 2023Containment Post-Tensioning System Inservice Inspection Basis for Proposed Extension of Examination Interval Technical ReportIncorporated by reference
Fuel cladding
ML22332A45410 November 2022Attachment 6 - LaSalle County Generating Station Units 1 and 2 Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (EFPY) (Non-Proprietary)Hydrostatic
Pressure and Temperature Limits Report
ML22332A45510 November 2022Attachment 7 - BWRVIP-135, Revision 4: BWR Vessel Internals Project Integrated Surveillance Program (ISP) Data Source Book and Plant Evaluations (Non-Proprietary Version)
NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits30 June 2022Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air SuitsMururoa
RS-22-018, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station22 February 2022Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station
RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.54 November 2021Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5Earthquake
Affidavit
GNF3
Water rod
RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping4 January 2021Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel PipingNondestructive Examination
RS-20-133, Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.6916 October 2020Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.69Safe Shutdown
Mission time
Probabilistic Risk Assessment
Squib
Incorporated by reference
Seismically rugged
Large early release frequency
Earthquake
Failure to Scram
ML20085F86124 March 2020Corrected Drawing for One-Line Electric Power Supply for Lasalle Hardened Containment Vent System (HCVS) Final Integrated Plan (FIP)
ML19228A02315 August 2019Proposed Alternative to Utilize Code Case N-879Affidavit
RS-18-131, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions14 December 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsHigh winds
Ultimate heat sink
Tornado Missile
Hydrostatic
FLEX
Design basis earthquake
Severe Accident Management Guideline
Hardened vent
ML16167A4466 September 2016MF7633 and MF7634, UFSAR, Las Fpr Rev._Redacted
ML16167A5026 September 2016UFSAR, Rev 22, Chap 09 Figures Part 12 of 14 - Redacted
ML15107A15421 April 2015Final Accident Sequence Precursor Analysis for the April 17, 2013, Dual Unit Loss of Offsite PowerMission time
Anticipated operational occurrence
Significance Determination Process
Pressure Boundary Leakage
Through-Wall Leak
RS-15-004, County Station Introduction of Lead Use Assemblies20 January 2015County Station Introduction of Lead Use AssembliesShutdown Margin
Anticipated operational occurrence
Channel-control blade interference
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 124 September 2014Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1Through-Wall Leak
ML14176A96124 June 2014Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014Fire Barrier
Coatings
Foreign Material Exclusion
ML14057A54926 February 2014Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) CurvesLicense Renewal
Power Uprate
RS-14-054, LaSalle, Unit 1, Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves26 February 2014LaSalle, Unit 1, Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) CurvesLicense Renewal
Power Uprate
ML14030A22321 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
B.5.b
Fukushima Dai-Ichi
Frazil ice
Battery sizing
Earthquake
Hardened vent
GOTHIC
ML14042A32519 February 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for LaSalle County Station, Units 1 and 2, TAC Nos.: MF1121 and MF1122Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
B.5.b
Fukushima Dai-Ichi
Frazil ice
Battery sizing
Earthquake
Hardened vent
GOTHIC
ML13358A36520 December 2013Attachment 5: LaSalle County Station, Unit 1, Pressure/Temperature Limits ReportHydrostatic
ML13282A3504 October 2013Final Report, Assessment of Wind Speeds Over the LaSalle County Station Ultimate Heat Sink.Ultimate heat sink
ML13192A44621 May 2013Enclosure 1, Updated Transmittal # 1 (Annex a) Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 2, Report No. RSafe Shutdown
Unanalyzed Condition
Ultimate heat sink
Safe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
ML13199A04117 January 2013Attachment 11 - Netco Report NET-300054-01, Revision 0, Inspection and Testing of Fast Start Surveillance Coupons F22-F1 1 from the LaSalle County Unit 2 Station
RS-11-067, Response to Request for Additional Information Regarding Unit 2 Spent Fuel Pool Storage Racks18 April 2011Response to Request for Additional Information Regarding Unit 2 Spent Fuel Pool Storage RacksExclusive Use
Affidavit
Water rod
RS-10-007, 375636, Revision 0, Dewatered Resin Flammable Gas Generation Assessment, Appendix B28 September 2009375636, Revision 0, Dewatered Resin Flammable Gas Generation Assessment, Appendix BFire Barrier
Coatings
Process Control Program
RS-10-007, LaSalle Station, Units 1 and 2 - Irsf LAR Support Technical Report Supporting Engineering Change (EC) No. 375636 Type: Document Change Request (DCR) Subtype: Dsgn28 September 2009LaSalle Station, Units 1 and 2 - Irsf LAR Support Technical Report Supporting Engineering Change (EC) No. 375636 Type: Document Change Request (DCR) Subtype: DsgnPacking leak
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Coatings
Incorporated by reference
Process Control Program
Earthquake
Fire Protection Program
Fire Watch
Scaffolding
ML10007030128 September 2009Irsf LAR Support Technical Report Supporting Engineering Change (EC) No. 375636 Type: Document Change Request (DCR) Subtype: DsgnPacking leak
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Coatings
Incorporated by reference
Process Control Program
Earthquake
Fire Protection Program
Fire Watch
Scaffolding
ML13199A04010 September 2009Attachment 10 - Netco Report NET-332-01, Revision 1, Inspection and Testing of Boral and Fast Start Surveillance Coupons from the LaSalle County Units 1 & 2 Stations
RS-09-133, Attachment 6, LaSalle, Unit 2, Nuclear Power Station Spent Fuel Storage Pool Criticality Safety Analysis with Neutron Absorbing Inserts and Without Boraflex31 August 2009Attachment 6, LaSalle, Unit 2, Nuclear Power Station Spent Fuel Storage Pool Criticality Safety Analysis with Neutron Absorbing Inserts and Without BoraflexExclusive Use
Affidavit
Water rod
RS-09-100, Additional Information Supporting the Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency27 July 2009Additional Information Supporting the Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency
RA09-012, Evaluation of the Water Spray System in the Overlab Area Fire Zone 4F310 March 2009Evaluation of the Water Spray System in the Overlab Area Fire Zone 4F3Thermoset
RS-09-037, Supplemental Information Concerning License Amendment to Allow Ganged Rod Drive Capability of the Rod Control Management System5 March 2009Supplemental Information Concerning License Amendment to Allow Ganged Rod Drive Capability of the Rod Control Management System
ML09008038531 December 2008ANP-2789(NP), Revision 0, Atrium Tm 10XM Lead Test Assemblies for LaSalle Unit 2.Shutdown Margin
Anticipated operational occurrence
RS-09-133, Attachment 5, Northeast Technology Corp. Report No. NET-259-03, Material Qualification of Alcan Composite for Spent Fuel Storage, Revision 531 August 2008Attachment 5, Northeast Technology Corp. Report No. NET-259-03, Material Qualification of Alcan Composite for Spent Fuel Storage, Revision 5Boric Acid
Stress corrosion cracking
ML09281028031 August 2008Attachment 5, Northeast Technology Corp. Report No. NET-259-03, Material Qualification of Alcan Composite for Spent Fuel Storage, Revision 5Boric Acid
Stress corrosion cracking
ML0821900137 August 2008Monthly Operating Reports Second Quarter 2008Reserve Station Service Transformer
Feedwater Heater
Power change
Downpower
Power Uprate
Overspeed trip
RS-08-091, Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency25 July 2008Request for a License Amendment to Revise Local Power Range Monitor Calibration FrequencySafety Limit Minimum Critical Power Ratio
Power Uprate
Exclusive Use
Affidavit
RS-08-063, Supplemental Information Concerning License Amendment to Allow Ganged Rod Drive Capability of the Rod Control Management System13 May 2008Supplemental Information Concerning License Amendment to Allow Ganged Rod Drive Capability of the Rod Control Management SystemAnticipated operational occurrence
Cyber Security
Affidavit
ML0634601317 December 2006Attachment 11, Exelon/Amergen Response to the Request for Additional Information, EP-EAL-0611, Criteria for Choosing Containment Radiation Monitor Reading Indicative Loss of the RCS BarrierDeep Dose Equivalent
Fuel cladding
ML04195019731 May 2004GE-NE-0000-0003-5526-02R1a, Pressure-Temperature Curves for LaSalle Unit 1 and GE-NE-0000-0003-5526-01R1a, Pressure-Temperature Curves for LaSalle Unit 2, Non-proprietaryShutdown Margin
Anticipated operational occurrence
Hydrostatic
Finite Element Analysis
Feedwater Heater
ML10113037131 May 2004GE-NE-0000-0003-5526-02R1a, Rev, 1, Pressure-Temperature Curves for Exelon LaSalle Unit 1.Shutdown Margin
Anticipated operational occurrence
Hydrostatic
Finite Element Analysis
Feedwater Heater
ML0411400339 March 2004Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 Report
ML08029023112 February 2004Westinghouse Technical Bulletin: Information Regarding Recent Crossflow Ultrasonic Flow Measurement System Performance Observations, TB-04-4Power change
RS-03-236, Transmittal of Non-Proprietary Version of Information Supporting Request for Amendment to Technical Specifications Section 5.6.5, Core Operating Limiits Report (Colr).17 December 2003Transmittal of Non-Proprietary Version of Information Supporting Request for Amendment to Technical Specifications Section 5.6.5, Core Operating Limiits Report (Colr).
RS-03-123, Response to Request for Additional Information to Support Request for Amendment to TS Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation26 June 2003Response to Request for Additional Information to Support Request for Amendment to TS Table 3.3.5.1-1, Emergency Core Cooling System InstrumentationReactor Vessel Water Level
Hydrostatic
Operating Basis Earthquake
Operability Determination
Grace period
ML03177034617 June 2003Additional Information Regarding Notice of Proposed Amendments to Trust Agreement to Implement Assignment of Decommissioning Trust Funds for Exelon Generation Company, LLC
RS-03-010, Supporting Documentation for Amendment to Technical Specifications Section 3.4.11, RCS Pressure and Temperature (P/T) Limits. Attachment 4, Table of Contents - Appendix F31 January 2003Supporting Documentation for Amendment to Technical Specifications Section 3.4.11, RCS Pressure and Temperature (P/T) Limits. Attachment 4, Table of Contents - Appendix FShutdown Margin
Anticipated operational occurrence
Hydrostatic
Finite Element Analysis
Feedwater Heater