Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23192A44731 July 2023Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards InformationProbabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML22363A39228 December 2022Cycle 14 Mellla+ Eigenvalue Tracking Data
CNL-22-100, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)9 December 2022to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Abnormal operational transient
Feedwater Controller Failure
MELLLA
ML22269A3887 September 202202-Gamma Spectroscopy of Concrete Pucks
CNL-22-066, Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information18 July 2022Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional InformationStroke time
Anticipated operational occurrence
Abnormal operational transient
ML22154A4043 June 2022Unit 3 Cycle 20 Mellla+ Eigenvalue Tracking Data
CNL-22-057, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use27 May 2022to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use
ML21277A1234 October 2021Submittal of Browns Ferry Unit 2 Reactor Pressure Vessel Vertical Weld Flaw EvaluationFinite Element Analysis
CNL-20-102, 10 CFR 71.95 Report for 3-60B Casks User16 December 202010 CFR 71.95 Report for 3-60B Casks User
ML20255A00024 September 2020Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: SeismicInternal Flooding
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Large early release frequency
Earthquake
Backfit
RA-20-0280, Submittal of IWB-3640 Analytical Evaluation Performed to Accept an ASME Section XI Code Rejected Sub-Surface Flaw14 September 2020Submittal of IWB-3640 Analytical Evaluation Performed to Accept an ASME Section XI Code Rejected Sub-Surface FlawSafe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
ML20112F4856 May 2020Staff Assessment of Flooding Focused EvaluationSafe Shutdown
Internal Flooding
Hydrostatic
FLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
CNL-19-074, Extended Power Uprate - Flow Induced Vibration Summary Report4 September 2019Extended Power Uprate - Flow Induced Vibration Summary ReportFlow Induced Vibration
CNL-19-004, Tennessee Valley Authority, Browns Ferry Nuclear Plant, Unit 2, Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions7 June 2019Tennessee Valley Authority, Browns Ferry Nuclear Plant, Unit 2, Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsFLEX
Design basis earthquake
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Hardened vent
CNL-19-041, Extended Power Uprate - Unit 1 Flow Induced Vibration Summary Report16 April 2019Extended Power Uprate - Unit 1 Flow Induced Vibration Summary ReportFlow Induced Vibration
Power Uprate
CNL-19-032, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 8, Additional Operator Training Information13 March 2019Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 8, Additional Operator Training Information
CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report29 November 2018Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report
ML18283B54710 October 2018Responding to Letter of 11/18/1977 from E. G. Case to G. Williams, Providing Environmental Qualification Information for Electrical Connectors in Reference of IE Bulletins 77-05 & 77-05A
CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report13 September 2018Extended Power Uprate - Flow Induced Vibration Summary ReportFlow Induced Vibration
ML18079B14023 February 2018Browns Ferry Nuclear Plant, Units 1, 2, and 3: Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus
ML17222A3285 September 2017Flood Hazard Mitigation Strategies AssessmentFLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Flood Hazard Mitigation Strategies Assessment
ML17114A37120 April 2017Errata for BWRVIP-271NP: BWR Vessel and Internals Project, Testing and Evaluation of the Browns Ferry, Unit 2, 120 Degree Capsule
CNL-16-169, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision28 October 2016Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision
ML16230A28217 August 2016Duke Power Company Oconee Nuclear Station Unit 2 Integrated Leak Rate Test of the Reactor Containment BuildingBoric Acid
Power Operated Valves
ML16196A0885 August 2016Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism ReevaluationUltimate heat sink
FLEX
Fukushima Dai-Ichi
Earthquake
ML16027A05927 January 2016Snubbers Added to Lnservice Testing Program
ML16034A32531 December 2015Revision 0 to Summary of Methodology Used for Seismic Capacity Evaluation of GMRS Mitigation ComponentsSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
CNL-15-056, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506)25 September 2015Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506)Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
MELLLA
ML15282A18121 September 2015Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7
ML15282A24021 September 2015Startup Test PlanSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Anticipated operational occurrence
Probabilistic Risk Assessment
Water level shrink
MELLLA
Flow Induced Vibration
ML15282A23921 September 2015Flow Induced Vibration Analysis and Monitoring ProgramFlow Induced Vibration
NL-15-169, Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 721 September 2015Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7
NL-15-169, Browns Ferry Units 1, 2 and 3, Flow Induced Vibration Analysis and Monitoring Program21 September 2015Browns Ferry Units 1, 2 and 3, Flow Induced Vibration Analysis and Monitoring ProgramFlow Induced Vibration
NL-15-169, Browns Ferry, Units 1, 2, and 3, Startup Test Plan21 September 2015Browns Ferry, Units 1, 2, and 3, Startup Test PlanSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Anticipated operational occurrence
Probabilistic Risk Assessment
Water level shrink
MELLLA
Flow Induced Vibration
ML15282A18231 August 2015ANP-3403NP, Revision 2, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3, Attachment 9
NL-15-169, ANP-3403NP, Revision 2, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3, Attachment 931 August 2015ANP-3403NP, Revision 2, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3, Attachment 9
NL-15-169, ANP-3377NP, Browns Ferry Units 1, 2 and 3 LOCA Break Spectrum Analysis Atrium 10XM Fuel (Epu).31 August 2015ANP-3377NP, Browns Ferry Units 1, 2 and 3 LOCA Break Spectrum Analysis Atrium 10XM Fuel (Epu).
NL-15-169, ANP-3378NP, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for Atrium 10XM Fuel (Epu).31 August 2015ANP-3378NP, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for Atrium 10XM Fuel (Epu).
NL-15-169, NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis.31 August 2015NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis.Anticipated operational occurrence
Safe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
Earthquake
Flow Induced Vibration
ML15282A23631 August 2015NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis.Anticipated operational occurrence
Safe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
Earthquake
Flow Induced Vibration
ML15282A18431 August 2015ANP-3377NP, Browns Ferry Units 1, 2 and 3 LOCA Break Spectrum Analysis Atrium 10XM Fuel (Epu).
ML15282A18531 August 2015ANP-3378NP, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for Atrium 10XM Fuel (Epu).
CNL-15-143, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report31 July 2015the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure ReportCommercial Grade Dedication
CNL-15-085, Response to NRC Request for Additional Information Regarding Proposed Technical Specification Change to Modify Technical Proposed Technical Specification Change to Modify Technical3 June 2015Response to NRC Request for Additional Information Regarding Proposed Technical Specification Change to Modify Technical Proposed Technical Specification Change to Modify TechnicalStroke time
Fuel cladding
ONS-2015-065, TIA 2014-04, Request for Technical Assistance Regarding the Adequacy of the Station Design and Licensing Bases for the Degraded Voltage Relay22 May 2015TIA 2014-04, Request for Technical Assistance Regarding the Adequacy of the Station Design and Licensing Bases for the Degraded Voltage RelayOffsite Circuit
Backfit
Manual Operator Action
ML16272A2176 March 2015Revision 1 to Flood Hazard Reevaluation Report on Oconee Nuclear Station, Pp. 1-70, Dated March 6, 2015 (Redacted)Safe Shutdown
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
ML16272A2186 March 2015Revision 1 to Flood Hazard Reevaluation Report on Oconee Nuclear Station, Appendices, Dated March 6, 2015 (Redacted)Safe Shutdown
CNL-14-208, Response to NRC Request for Additional Information Regarding the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Pl17 December 2014Response to NRC Request for Additional Information Regarding the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear PlanHot Short
Safe Shutdown
High Radiation Area
Mission time
Fire Barrier
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Multiple Spurious Operation
Incorporated by reference
FLEX
Thermoset
Large early release frequency
Severe Accident Management Guideline
Fire Protection Program
Fire Watch
Very Early Warning Fire Detection
CNL-14-089, (Bfn), Units 1, 2, and 3 - Application to Modify Technical Specification 2.1.1, Reactor Core Safety Limits (BFN-TS-492)11 December 2014(Bfn), Units 1, 2, and 3 - Application to Modify Technical Specification 2.1.1, Reactor Core Safety Limits (BFN-TS-492)Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Minimum Critical Power Ratio
Fuel cladding
Power change
ML14176A96124 June 2014Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014Fire Barrier
Coatings
Foreign Material Exclusion