Issue date | Title | Topic | |
---|---|---|---|
ML23341A017 | 12 January 2024 | Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures | |
ML23136B139 | 29 June 2023 | Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications | Internal Flooding Probabilistic Risk Assessment Reserve Station Service Transformer Surveillance Frequency Control Program Pressure Boundary Leakage |
ML23072A089 | 1 May 2023 | (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements | Shutdown Margin Packing leak Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage |
ML22300A188 | 27 October 2022 | License Amendment Request 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect Capability Response to Request for Additional Information | High winds Internal Flooding Probabilistic Risk Assessment FLEX Large early release frequency Power change GOTHIC |
ML21253A063 | 19 November 2021 | Issuance of Amendment Nos. 306 and 306 to Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis | Fire Protection Program |
ML21232A217 | 19 October 2021 | Issuance of Amendment Nos. 288 and 271 to Revise Technical Specifications Battery Surveillance Testing | Anticipated operational occurrence Emergency Lighting Surveillance Frequency Control Program |
ML21280A328 | 7 October 2021 | Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions | |
ML21277A065 | 30 September 2021 | Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer | Boric Acid Surveillance Frequency Control Program Design basis earthquake |
ML21175A185 | 20 August 2021 | Issuance of Amendment Nos. 304 and 304 Leak-Before-Break for Pressurizer Surge, Residual Heat Removal, Safety Injection Accumulator, Reactor Coolant System Bypass and Safety Injection Lines | Boric Acid Safe Shutdown Earthquake Aging Management Surveillance Frequency Control Program Earthquake Fuel cladding Pressure Boundary Leakage Fire Protection Program Dissimilar Metal Weld |
ML21106A279 | 4 May 2021 | Technical Specifications | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin High Radiation Area Non-Destructive Examination Grab sample Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Tornado Missile Hydrostatic Reserve Station Service Transformer Nondestructive Examination VT-2 Incorporated by reference Missed surveillance Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Open Phase Condition Annual Radiological Environmental Operating Report Process Control Program License Renewal Subsequent License Renewal Earthquake Fuel cladding Liquid penetrant Pressure Boundary Leakage Offsite Circuit Fire Protection Program Power change Unidentified leakage |
ML20325A095 | 19 March 2021 | Issuance of Amendment to Revise Technical Specifications to Allow Usage of a Small Break Loss of Coolant Accident Methodology (Non-Proprietary) | Shutdown Margin Loop seal Fuel cladding |
ML20302A179 | 29 October 2020 | Non-Proprietary, Issuance of Amendment Nos. 286 and 269 to Revise Technical Specifications to Allow Usage of a Full Spectrum Loss of Coolant Accident Methodology | Coatings |
ML20301A452 | 28 October 2020 | Non-Proprietary, Issuance of Amendment Nos. 300 and 300 to Revise Technical Specifications 6.2.C, Core Operating Limits Report | Shutdown Margin Coatings Fire Protection Program |
ML20275A000 | 14 October 2020 | Issuance of Amendment No. 277 to Revise Technical Specification 6.8.4.g to Allow a One-Time Deferral of the Steam Generator Inspections | Nondestructive Examination Foreign Material Exclusion Coronavirus COVID-19 |
ML20237H995 | 29 September 2020 | Issuance of Amendment No. 341 Revision to Technical Specification 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program | Incorporated by reference |
ML20261H598 | 17 September 2020 | Response to Request for Additional Information for License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation | Anticipated operational occurrence |
ML20191A004 | 7 August 2020 | Issuance of Amendment No. 340 Revised Technical Specification Limits for Primary and Secondary Coolant Activity | Surveillance Frequency Control Program Fuel cladding Power change |
ML20115E237 | 7 May 2020 | Issuance of Exigent Amendments Nos. 299 and 299, to Revise TS 6.4.Q, Steam Generator (SG) Program, to Allow a One-Time Deferral of the Inspection of Surry Unit 2 Sg B Spring 2020 Refueling Outage | Anticipated operational occurrence Nondestructive Examination Foreign Material Exclusion Pandemic Coronavirus COVID-19 Fire Protection Program |
ML19238A127 | 12 September 2019 | Issuance of Amendment Nos. 282 and 265 to Revise Technical Specifications Regarding Open Phase Protection | Anticipated operational occurrence Reserve Station Service Transformer Surveillance Frequency Control Program Open Phase Condition |
ML19196A110 | 9 July 2019 | Attachments 2, 3 & 4 - Response to NRC Request for Additional Information and Correction of SBLOCA Analysis Error and Revised Marked-Up/Typed NAPS and SPS Technical Specifications Pages | |
ML19126A000 | 28 May 2019 | Issuance of Amendment No. 273 Regarding Technical Specification Changes for Spent Fuel Storage and New Fuel Storage | Surveillance Frequency Control Program |
ML19156A207 | 24 May 2019 | Response to Request for Additional Information on Proposed License Amendment Request Open Phase Protection Per NRC Bulletin 2012-01 | Reserve Station Service Transformer Tornado Missile Protection Surveillance Frequency Control Program Open Phase Condition |
ML19042A277 | 21 March 2019 | Issuance of Amendment No. 272 Regarding Revision to Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels | Recently irradiated fuel |
ML18100A055 | 4 April 2018 | License Amendment Request to Revise Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels | Surveillance Frequency Control Program Recently irradiated fuel |
ML17326A225 | 9 February 2018 | Issuance of Amendments Regarding License Amendment Request to Revise Residual Heat Removal and Component Cooling System Technical Specifications Requirements (CAC Nos. MF9124 and MF9125; EPID L-2017-LLA-0166) | Fire Protection Program |
ML17187A132 | 28 June 2017 | Submittal of Topical Report VEP-NE-1, Revision 0.2-A, Relaxed Power Distribution Control Methodology and Associated Fq Surveillance Technical Specifications for Information Only | Exemption Request |
ML17038A006 | 1 February 2017 | Technical Specifications 2016 Annual Report | |
ML17025A218 | 24 January 2017 | Issuance of Amendment Realistic Large Break Loss-of-Coolant Accident Analysis | Shutdown Margin Fuel cladding |
ML16354A424 | 14 December 2016 | License Amendment Request to Revise Technical Specification Surveillance Requirement 4.1.3.1.2 for Control Element Assembly 39 for the Remainder of Cycle 24 | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Power change Downpower |
ML16252A478 | 17 October 2016 | Issuance of Amendments Revising Technical Specifications to Address the Issue Identified in Westinghouse NSAL-09-5, Revision 1, and NSAL-15-1, Revision 0 | Surveillance Frequency Control Program |
ML16208A051 | 26 July 2016 | Clean Technical Specifications (TS) Pages for Millstone Power Station 1 (Docket No. 05000245), Administrative Changes for TS (L53121) | Offsite Dose Calculation Manual Fire Protection Program |
ML16068A312 | 31 March 2016 | Issuance of Amendment No. 326 to Revise Technical Specifications for Containment Leak Rate Testing | |
ML16013A444 | 22 February 2016 | (NAPS) - Issuance of Amendment for Changes to Technical Specification (TS) 3.8.1 - AC Sources, Operating Revised Surveillance Requirement | Safe Shutdown Surveillance Frequency Control Program Offsite Circuit |
ML15307A300 | 2 February 2016 | (NAPS) - Issuance of Amendments for Changes to the Emergency Action Level Revisions - Correction of Equipment Mark Number | Earthquake |
ML16011A400 | 29 January 2016 | Issuance of Amendments Nos. 325 and 267 to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation | Functionality Assessment Surveillance Frequency Control Program |
ML15288A004 | 30 November 2015 | Issuance of Amendment No. 266: Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times | High winds Probabilistic Risk Assessment Large early release frequency Recently irradiated fuel |
ML15280A242 | 29 October 2015 | Issuance of Amendment No. 324 Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program, Adoption of TSTF-425,Rev 3 | |
ML15245A482 | 7 October 2015 | Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses | Safe Shutdown Enforcement Discretion Cyber Security Fire Protection Program |
ML15225A010 | 28 August 2015 | Issuance of Amendment No. 264 Surveillance Requirement 4.4.4.2, Reactor Coolant System Relief Valves | Surveillance Frequency Control Program |
ML15225A008 | 26 August 2015 | Issuance of Amendment No. 322 Revision to the Final Safety Analysis Report - Examination Requirements for ANSI B31.1.0 Piping Welds | |
ML15187A326 | 29 July 2015 | Issuance of Amendment No. 321, Adoption of TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C | Anticipated operational occurrence Probabilistic Risk Assessment Large early release frequency Recently irradiated fuel |
ML15187A186 | 28 July 2015 | Issuance of Amendment No. 263, Regarding Technical Specification Changes to Auxiliary Feedwater System (MF4692) | Safe Shutdown Surveillance Frequency Control Program |
ML15187A011 | 27 July 2015 | Issuance of Amendment No. 262, Refueling Water Storage Tank Allowable Temperatures | Probabilistic Risk Assessment Surveillance Frequency Control Program |
ML15209A729 | 21 July 2015 | Response to Second Request for Additional Information Regarding Proposed Technical Specification Change for Spent Fuel Storage | Unanalyzed Condition Fuel cladding |
ML15133A381 | 16 June 2015 | Issuance of Amendments to Extended Type a Test Frequency to 15 Years | High winds Probabilistic Risk Assessment Large early release frequency Moisture barrier |
ML15147A029 | 22 May 2015 | Proposed License Amendment Request (Lar), TS 3.8.1 - AC Sources - Operating, Revised Surveillance Requirement | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment Reserve Station Service Transformer Qualified Offsite Circuit Surveillance Frequency Control Program Fuel cladding Recently irradiated fuel Offsite Circuit |
ML15093A002 | 20 May 2015 | Issuance of Amendment No. 320, Delete Technical Specification Index and Make Other Editorial and Administrative Changes | Shutdown Margin Offsite Dose Calculation Manual Nondestructive Examination |
ML15098A034 | 20 May 2015 | Issuance of Amendment No. 261, Delete Technical Specification Index and Make Other Editorial and Administrative Changes | Offsite Dose Calculation Manual Process Control Program |
ML15093A441 | 18 May 2015 | Issuance of Amendment No. 319, Use of Areva M5 Alloy Clad Fuel Assemblies | Shutdown Margin Anticipated operational occurrence Exemption Request Fuel cladding |
ML15083A436 | 14 May 2015 | Issuance of Amendments Regarding Alternate Control Rod Position Monitoring | Shutdown Margin Anticipated operational occurrence Surveillance Frequency Control Program |