ML20127N75920 June 1985Transcript of Commission 850620 Affirmation/Discussion & Vote in Washington,Dc Concerning Denial of 2.206 Petition for Midland plant,SECY-85-60 Concerning Pressurized Thermal Shock Rule & Shoreham Order.Pp 1-4
ML20082D90421 November 1983Portions of Jl Donnell Deposition,Designated as Direct Testimony.Certificate of Svc Encl
ML20090H34615 October 1983Transcript of Jl Donnell 831015 Deposition in Las Vegas,Nv Re Alleged Violation of ASLB Order
ML20076L64711 July 1983Testimony of Ps Glass Re Cable & Conduit Installation for Underpinning Instrumentation of Auxiliary Bldg.Oversize Matrix Encl.Aperture Card Available in PDR
ML20076L63611 July 1983Testimony of R Black Re Events During Late Winter 1982 & Early Spring 1982 & Installation of Cable Related to Instrumentation for Underpinning Work on Auxiliary Bldg
ML20073H36213 April 1983Two Attachments to RA Wells Testimony,Inadvertently Omitted from Original Submittal.Certificate of Svc Encl
ML20069J06211 April 1983Testimony of RA Wells Re Recent Changes in Organization of QA Dept,Including Changes in Organizational Structure & Responsibility for & Direction of QC Function
ML20073D72911 April 1983Testimony of Ja Rutgers on Qa.Responds to Specific Items Addressed in Attachment to J Keppler 821029 QA Testimony
ML20069J07311 April 1983Testimony of Ja Mooney & RM Wheeler Re Alleged Violation of ASLB 820430 Order & Mar 1982 Cable Pulling Incident.Util Was Unaware NRC Required Explicit Review & Approval for Fireline Excavation & Excavation Below Deep Q-duct Bank
ML20069J07611 April 1983Testimony of WR Bird Re Qa.Installation of Trench Excavation Near Turbine Bldg W/Slope Layback Installed Incorrectly Due to Difficulty in Determining Ref Point for Horizontal Dimension
ML20069J08611 April 1983Testimony of Bh Peck.Const Completion Program Addresses All Identified NRC Concerns Resulting from Insp of Diesel Generator Bldg.Certificate of Svc EnclUltimate heat sink
ML20069J05711 April 1983Testimony of JW Cook Re Util Qa/Qc Plans for Plant Completion.Completed Plant Will Conform to NRC Regulatory Requirements Based on Measures Taken to Improve Project Status Assessment,Sys Const & QA ImplementationNondestructive Examination
Fire Protection Program
Scaffolding
ML20069J06611 April 1983Testimony of Ja Mooney Re Remedial Soils Work.Discusses Events Up to & Including Major Action Announced in Util ,Implementation of Commitments & Progress Rept on Completed Underpinning Work
ML20069J0824 April 1983Testimony of RM Wheeler Re Qa.Discusses Util Preparations to Drill Well Hole in safety-related Dirt Using Unauthorized Technique
ML20072S58830 March 1983Limited Appearance Statement of Bp Garde Re Lack of Third Party Independent Review of Actual Plant ConditionSystematic Assessment of Licensee Performance
Earthquake
ML20073H45428 March 1983Transcript of 830328 Deposition of AB Savage on Sinclair Contention 4 Re Steam Generator CorrosionGrab sample
ML20069F62018 March 1983Testimony of a Savage on Contention 4 Re Corrosion & Sludging of Condenser Tubes by Pond Water.Prof Qualifications Encl
ML20079N01628 February 1983P 4 of Dh Evans & D Sommers 830214 Testimony Re Sinclair Contention 14 on Cooling Pond,Inadvertently Omitted. Certificate of Svc Encl
ML20071A03214 February 1983Proposed Transcript Corrections for Nov & Dec 1982 HearingsSafe Shutdown
Safe Shutdown Earthquake
Hydrostatic
Finite Element Analysis
Earthquake
ML20071A07010 February 1983Testimony of Dh Evans & DA Sommers Re Sinclair OL Contention 14.Bechtel Thermal Performance Study & Plant Cooling Pond Operation Study Not Improperly Influenced by Data from Substantially Different Climatic Region
ML20071A0827 February 1983Testimony of J Bradley Re Sinclair OL Contention 14 on Dresden Fogging & Icing Studies.Conclusions in Plant Fes Re Fog & Ice Not Inconsistent W/Dresden Cooling Pond Experience.Certificate of Svc Encl
ML20028E86424 January 1983Testimony of P Shunmugavel Re Structural Evaluation of Auxiliary Bldg for Seismic Shakedown Settlement & Seismic Category I Duct Banks.Auxiliary Bldg Able to Withstand Effects of Shakedown SettlementSafe Shutdown
Earthquake
ML20070R04124 January 1983Testimony of Dr Anderson,Dt Perry & Gb Slade Re Sinclair Contention 3 on Potential for Water Hammer. Certificate of Svc EnclLoop seal
ML20028E14717 January 1983Testimony of C Hillman & T Postlewait on Sinclair Contention 4.Contention Has Faulty Premise.Administrative Procedures & Design Features of Plant Adequate to Meet B&W Specified Secondary Water Chemistry Limits.Related CorrespondenceGrab sample
ML20028E15614 January 1983Testimony of Rd Woods Re Seismic Shakedown Settlement at Site.Reasonable Assurance Exists That Plant Area Including Piping & Duct Banks Will Not Suffer Excessive Settlement Due to Seismic Shutdown.Related CorrespondenceEarthquake
ML20028E16313 January 1983Testimony of Bj Garrick & LS Gibson Re Analysis of Class 9 Accidents in Plant Fes.Conclusion in Fes That Risk to Public from Potential Accidents Is Small Not Invalidated by Precursor Study.W/Certificate of Svc.Related CorrespondenceProbabilistic Risk Assessment
Earthquake
ML20070A1936 December 1982Revised Testimony of RB Peck.Surcharge Program at Diesel Generator Bldg Eliminated Potential Future Settlement Problems Due to Compressibility of Plant Fill Matl & Lack of HomogeneitySafe Shutdown Earthquake
Earthquake
ML20069L96315 November 1982Testimony of W Bird & R Wheeler Providing Addl Info on Nonconformance Repts Per ASLB Request in 820707 Memorandum & Order.Procedures Outlined Provide Adequate Controls to Prevent Damage to Underground Utils.Certificate of Svc EnclNondestructive Examination
ML20069L9518 November 1982Testimony of Wg Corley Re Plant Concrete Wall Crack Repair Program.Rept Entitled, Effects of Cracks on Serviceability of Structures at Midland Plant, EnclCoatings
Earthquake
ML20069L9563 November 1982Testimony of RB Peck.Surcharge Program at Diesel Generator Bldg Eliminated Any Potential Future Settlement Problems Due to Compressibility of Plant Fill Matl & Due to Lack of Homogeneity
ML20065Q22025 October 1982Testimony of a Boos,Em Burke,Jp Gould & P Shunmugarel Re Svc Water Pump Structure.Aperture Cards Available in PDRSafe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Tornado Generated Missile
ML20065M91715 October 1982Testimony of Rd Woods Re Liquefaction of Saturated Sand During Earthquake.After Remedial Measures Taken,Plant Will Be Safe Re Liquefaction of Sands.Related Correspondence. Oversize Drawings Encl.Aperture Cards Available in PDREarthquake
ML20065M90315 October 1982Testimony of Wc Paris Re Permanent Dewatering Sys for Site. Sys Will Provide Acceptable Method for Removing Water from Granular Plant Fill Matl.Related Correspondence.Oversize Drawings Encl.Aperture Cards Available in PDRDesign basis earthquake
Earthquake
ML20065Q25214 October 1982Testimony of Wg Corley Re Cracking in Svc Water Pump Structure
ML20027C1538 October 1982Testimony of Aj Hendron Re Evaluation of Seismic Shakedown Settlement of Diesel Generator Bldg in Event of Earthquake. Prof Qualifications & Supporting Documentation EnclEarthquake
ML20063P2998 October 1982Testimony of Aj Hendron Re Evaluation of Ultimate Load Carrying Capacity of Diesel Generator Bldg Footings.Prof Qualifications,Supporting Documentation & Certificate of Svc Encl
ML20027C1637 October 1982Testimony of DF Lewis on Behalf of Applicant Re Underground Piping.Affidavit & Supporting Documentation Encl
ML20062K10113 August 1982Transcript of 820813 Meeting in Midland,Mi.Pp 8,317-8,546
ML20062K08512 August 1982Transcript of 820812 Hearing in Midland,Mi.Pp 8,100-8,316Time of Discovery
Earthquake
Turbine Missile
ML20140H00220 May 1982Statement of C Anderson Before ACRS Subcommittee 820520-21 Meetings Re Review of Application for Ol.Statement Addresses Soil/Structure Interaction Problems.Addenda 1 & 2 Encl
ML20140H01320 May 1982Statement of MP Sinclair Before ACRS Subcommittee on Midland Plant 820520-21 Meetings Re Review of Application for Ol. Statement Addresses Plant Design & Qualification Deficiencies
ML20040F4144 February 1982Testimony of Aj Boos & Rd Hanson Re Remedial Measures for Borated Water Storage Tank.Describes Analytical Work Performed on Tank Foundations,Soil Bearing Pressure & Settlement Predications.W/Affidavits & Prof QualificationsSafe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Finite Element Analysis
Earthquake
ML20040F4514 February 1982Testimony of RP Kennedy & Rd Campbell.Uneven Tank Support Resulting from Soil Settlement Has Not Damaged Borated Water Storage Tanks.Design Basis Has Not Been Violated Nor Safe Operating Life ReducedNondestructive Examination
Finite Element Analysis
ML20049J4862 February 1982Errata to Transcripts of 820202 Hearing in Midland,Mi
ML20040F4842 February 1982Testimony of DF Lewis,Df Landers & Jk Meisenheimer Re Underground Piping & Tanks.Seven Oversize Drawings Encl. Aperture Cards Available in Pdr.Affidavit,Certificate of Svc & Prof Qualifications EnclSafe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML20038A93819 November 1981Testimony of EM Burke,Wg Corley,Jp Gould,Te Johnson & M Sozen Re Remedial Measures for Facility Auxiliary Bldg & Feedwater Isolation Valve Pits,Vols 1 & 2.Certificate of Svc Encl
ML20005C0395 November 1981Proposed Corrections to Transcript of 810805 Hearing in Midland,Mi.Notice of Appearance Encl
ML20009D91823 July 1981Testimony Re Stability of Dikes Adjacent to Emergency Cooling Water Reservoir,Per Stamiris Contention 4.B.Prof Qualifications & Certificate of Svc EnclSafe Shutdown
Earthquake
ML20126L8438 June 1981Testimony of Ds Hood That If NRC Had Known How Util Was to Implement QA Program,Nrc Would Have Been Warranted in Not Issuing CPs for Original Application
ML20126L8858 June 1981Testimony of Ds Hood Re ASLB Question on Continued Const.Nrc Does Not Object to Proceeding W/Surcharging Valve Pits Adjacent to Borated Water Tanks If Acceptable Program Worked Out.Prof Qualifications & Certificate of Svc Encl