Testimony of Ds Hood Re ASLB Question on Continued Const.Nrc Does Not Object to Proceeding W/Surcharging Valve Pits Adjacent to Borated Water Tanks If Acceptable Program Worked Out.Prof Qualifications & Certificate of Svc EnclML20126L885 |
Person / Time |
---|
Site: |
Midland |
---|
Issue date: |
06/08/1981 |
---|
From: |
Hood D Office of Nuclear Reactor Regulation |
---|
To: |
|
---|
Shared Package |
---|
ML20126L803 |
List: |
---|
References |
---|
ISSUANCES-OL, ISSUANCES-OM, NUDOCS 8106090720 |
Download: ML20126L885 (8) |
|
|
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20070E4671991-02-26026 February 1991 Comment Opposing Petition for Rulemaking PRM-73-9 Re Upgrading Design Basis Threat for Radiological Sabotage of Nuclear Reactors.Recommends That NRC Deny Petition to Increase Design Basis Threat for Security ML20207C1331986-12-18018 December 1986 Order Terminating CPPR-81 & CPPR-82,per Util 860711 Motion to Withdraw Applications for OLs ML20215E7301986-12-17017 December 1986 Memorandum & Order Authorizing Withdrawal of OL Application & Dismissing OL Proceeding,Per Applicant 860711 Motion. Served on 861218 ML20215B2071986-12-11011 December 1986 Responds to Questions Posed in ASLBP 861203 Memorandum & Order Re Conversion to gas-fired Facility.Imposition of Conditions on Withdrawal of OL Application Unnecessary. Certificate of Svc & Svc List Encl ML20211L6391986-12-11011 December 1986 Affidavit of Gb Staley Re Preparation of Answers to Board 861203 Questions on Termination of OL Proceeding. Certificate of Svc Encl ML20211L6181986-12-11011 December 1986 Response to Board 861203 Questions Re Util Request to Terminate OL Proceeding ML20214Q4431986-12-0303 December 1986 Memorandum & Order Granting Motion to Expedite Completion of Withdrawal Proceedings & Posing Questions to Parties.Served on 861204 ML20214G7941986-11-24024 November 1986 Motion to Expedite Completion of Withdrawal of Licensee OL Application & Terminate Pending OL & CP Mod Proceedings. Certificate of Svc Encl ML20214T7361986-09-26026 September 1986 Memorandum & Order Dismissing OM Proceeding as Moot & Deferring Action on Applicant Motion for Authorization to Withdraw OL Application Pending NRC Preparation of Environ Assessment.Served on 860929 ML20212M7661986-08-25025 August 1986 Response to Util 860711 Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings.Board Should Hold Motion in Abeyance Pending NRC Review of Stabilization Plan.Certificate of Svc Encl ML20206M8171986-08-15015 August 1986 Response to ASLB 860716 Order Requesting Responses Re Termination of OM Proceeding.Termination of OL Proceeding & Withdrawal of OL Application Requested.Om Proceeding Should Be Considered Moot.Certificate of Svc Encl ML20212B0311986-08-0101 August 1986 Memorandum & Order Withdrawing Retention of Jurisdiction Over Radon Issue Presented in Facility CP Proceeding & Vacating ASLB Partial Initial Decision on Remedial Soils in Consolidated CP Mod & OL Proceeding.Served on 860801 ML20212B0521986-07-31031 July 1986 Order Extending Time Until 860815 for Util & Other Parties to Respond to Questions Posed by 860716 ASLB Order.Time Extended Until 860825 for NRC Response to ASLB Questions & Util Motion.Served on 860801 ML20203F8791986-07-28028 July 1986 Response Supporting Util 860711 Motion for Termination of Appeal Board Jurisdiction Over Proceeding.Certificate of Svc Encl ML20207H6871986-07-22022 July 1986 Motion for Extension Until 860815 to File Responses to Four Questions Re Util Motion to Dismiss OL & OM Proceedings. Certificate of Svc Encl ML20207E2851986-07-16016 July 1986 Order Presenting Questions in Response to Util 860711 Motion to Dismiss OL Proceeding & to Terminate Order of Mod Proceeding.Served on 860717 ML20202G1621986-07-11011 July 1986 Notice of Change of Address for Washington Ofc of Isham, Lincoln & Beale,Attys for Util.Certificate of Svc Encl ML20202G0121986-07-11011 July 1986 Motion for Authorization to Withdraw OL Application & Dismissal of OL & Order of Mod Proceedings ML20202G1201986-07-11011 July 1986 Motion for Termination of Aslab Jurisdiction to Facilitate Termination of Cps,Withdrawal of OL Application & Dismissal of Consolidated OM-OL Proceeding ML20202G0491986-07-10010 July 1986 Affidavit of JW Cook Re Conversion of Plant Into combined- cycle,gas-fired Power Plant.Plant Never Operable as Nuclear facility.Nuclear-related Equipment Will Be Sold ML20202G0281986-07-0808 July 1986 Affidavit of Ta Mcnish Re True & Correct Extracts of 860408 & 0618 Minutes of Meetings.Resolutions Recited Therein in Full Force & Effect ML20198J3861986-05-27027 May 1986 Notice of ASLB Reconstitution.C Bechoefer,Chairman & J Harbour & Ga Linenberger,Members.Served on 860529 ML20198J4651986-05-27027 May 1986 Notice of ASLB Reconstitution.C Bechhoefer,Chairman & J Harbour & Ga Linenberger,Members.Served on 860529 ML20137E0041985-11-21021 November 1985 Notice of Appearance in Proceeding ML20137D9651985-11-21021 November 1985 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20133F6421985-10-0909 October 1985 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20134N3771985-08-30030 August 1985 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl DD-84-17, Order Affirming 840724 Director'S Decision DD-84-17 Denying Bp Garde 10CFR2.206 Petition for Action Against Util Re Plant Const.Const Abandoned on 840910.No Further Enforcement Action Required.Served on 8506241985-06-24024 June 1985 Order Affirming 840724 Director'S Decision DD-84-17 Denying Bp Garde 10CFR2.206 Petition for Action Against Util Re Plant Const.Const Abandoned on 840910.No Further Enforcement Action Required.Served on 850624 ML20127N7591985-06-20020 June 1985 Transcript of Commission 850620 Affirmation/Discussion & Vote in Washington,Dc Concerning Denial of 2.206 Petition for Midland plant,SECY-85-60 Concerning Pressurized Thermal Shock Rule & Shoreham Order.Pp 1-4 ML20133D9481985-05-13013 May 1985 Response to Aslab 850423 Order.Aslab Should Cancel OL Application & CPs Because Compliance W/Nrc Basic Requirements Not Met ML20116G5181985-04-29029 April 1985 Response to Memorandum of City & County of Midland,Mi Re ASLB 850405 & 0313 Orders on CP Mod Proceedings.Bechtel Should Not Be Granted Admission to Proceedings ML20115J5551985-04-19019 April 1985 City & County of Midland,State of Mi Response to Aslab 850313 Order to File Memoranda Re Whether Aslab Should Vacate ASLB Decision Re Certain Mods to CP Due to Mootness. Proof of Svc Encl ML20115J4751985-04-19019 April 1985 Memorandum in Response to Aslab 850405 Order Re Dismissal of OL Application.Application Neither Abandoned Nor Delayed in Dilutory Manner.Certificate of Svc Encl ML20115J5501985-04-19019 April 1985 Response Opposing Aslab 850405 Memorandum & Order Re Dismissal of OL Applications.Urges Board to Permit OL Applications to Continue in Suspension Until Applicant Affirmatively Resolves Disposition ML20116G5321985-04-19019 April 1985 Motion to Participate as Amicus Curiae in Resolution of Issue to Involuntary Dismissal of License Application,Per Aslab 850405 Memorandum & Order.Granted for Aslab on 850422. Served on 850429 ML20115J4351985-04-19019 April 1985 Motion for Leave to Participate as Amicus Curiae,Per Aslab 850313 & 0405 Memoranda & Orders Requesting Response to Questions Re Proceeding ML20115J5461985-04-19019 April 1985 Motion to Participate Amici Curiae in Resolution of Issue of Involuntary Dismissal of License Application as Identified in Aslab 850405 Memorandum & Order ML20115J5421985-04-19019 April 1985 City & County of Midland,State of Mi Motion for Leave to Participate as Amicus Curiae in Aslab Request for Responses to Questions Presented in 850313 & 0405 Memoranda Orders. Proof of Svc Encl ML20112J5281985-04-0101 April 1985 Memorandum in Response to Aslab 850313 Order LBP-85-2. Decision Should Not Be Vacated.Ol Should Be Dismissed.Based on Listed Changes,New OL Review Required ML20112J6301985-04-0101 April 1985 Memorandum Requesting Aslab Not Take Any Action to Vacate LBP-85-2 or Dismiss OL Applications,Per 850313 Order,Based on Current Intent to Hold CPs & Attempt to Sell Plant. Certificate of Svc Encl ML20112H0981985-03-27027 March 1985 Response to Aslab 840313 Order Re Whether ASLB Decision to Review Issues in Soils Hearing Appropriate Use of Public Resources.Concurs W/Decision to Remand OL W/Instructions to Dismiss OL Application for Failure to Pursue Soils Issue ML20106F6531985-02-0808 February 1985 Response Opposing Intervenor B Stamiris 841224 Motion for Evidentiary Hearings Re Litigation Between Applicant & Dow Chemical Co.Supporting Documentation & Certificate of Svc Encl ML20106D6631985-02-0808 February 1985 Response Opposing B Stamiris 841224 Pleading Requesting Evidentiary Hearing on Matter Raised in applicant-Dow Chemical Trial & Referral of Certain Matters to Ofc of Investigations.Certificate of Svc Encl ML20101S9111985-02-0101 February 1985 Motion for Extension of Time within Which to File Notice of Appeal of ASLB 850123 Partial Initial Decision.Certificate of Svc Encl ML20101S9421985-02-0101 February 1985 Motion for Extension Until 850306 to File Notice of Appeal of ASLB 850123 Partial Initial Decision.Granted by Aslab on 850201 ML20101F3191984-12-24024 December 1984 Request for Evidentiary Hearings on Matter Raised in CPC-Dow Trial & Referral of Certain Matters to Ofc of Investigations.Certificate of Svc Encl ML20107K8011984-11-0101 November 1984 Affidavit of Jd Selby Re Plans Concerning Facilities.Const Will Be Resumed Only If Proposed by Appropriate Governmental Agencies & Officials & If Funds from Some Other Source Become Available.Related Correspondence ML20106F5241984-10-24024 October 1984 Motion to Request ASLB to Cancel Const License & Application for OL ML20092J0241984-06-22022 June 1984 Reply to B Stamiris Second Supplemental Proposed Findings of Fact & Conclusions of Law on QA & Mgt Attitude Issues. Certificate of Svc Encl ML20092J0361984-06-22022 June 1984 Reply to NRC Further Supplemental Findings of Fact & Conclusions of Law Re QA 1991-02-26
[Table view] Category:TRANSCRIPTS
MONTHYEARML20127N7591985-06-20020 June 1985 Transcript of Commission 850620 Affirmation/Discussion & Vote in Washington,Dc Concerning Denial of 2.206 Petition for Midland plant,SECY-85-60 Concerning Pressurized Thermal Shock Rule & Shoreham Order.Pp 1-4 ML20082D9041983-11-21021 November 1983 Portions of Jl Donnell Deposition,Designated as Direct Testimony.Certificate of Svc Encl ML20090H3461983-10-15015 October 1983 Transcript of Jl Donnell 831015 Deposition in Las Vegas,Nv Re Alleged Violation of ASLB Order ML20076L6471983-07-11011 July 1983 Testimony of Ps Glass Re Cable & Conduit Installation for Underpinning Instrumentation of Auxiliary Bldg.Oversize Matrix Encl.Aperture Card Available in PDR ML20076L6361983-07-11011 July 1983 Testimony of R Black Re Events During Late Winter 1982 & Early Spring 1982 & Installation of Cable Related to Instrumentation for Underpinning Work on Auxiliary Bldg ML20073H3621983-04-13013 April 1983 Two Attachments to RA Wells Testimony,Inadvertently Omitted from Original Submittal.Certificate of Svc Encl ML20069J0621983-04-11011 April 1983 Testimony of RA Wells Re Recent Changes in Organization of QA Dept,Including Changes in Organizational Structure & Responsibility for & Direction of QC Function ML20073D7291983-04-11011 April 1983 Testimony of Ja Rutgers on Qa.Responds to Specific Items Addressed in Attachment to J Keppler 821029 QA Testimony ML20069J0731983-04-11011 April 1983 Testimony of Ja Mooney & RM Wheeler Re Alleged Violation of ASLB 820430 Order & Mar 1982 Cable Pulling Incident.Util Was Unaware NRC Required Explicit Review & Approval for Fireline Excavation & Excavation Below Deep Q-duct Bank ML20069J0761983-04-11011 April 1983 Testimony of WR Bird Re Qa.Installation of Trench Excavation Near Turbine Bldg W/Slope Layback Installed Incorrectly Due to Difficulty in Determining Ref Point for Horizontal Dimension ML20069J0861983-04-11011 April 1983 Testimony of Bh Peck.Const Completion Program Addresses All Identified NRC Concerns Resulting from Insp of Diesel Generator Bldg.Certificate of Svc Encl ML20069J0571983-04-11011 April 1983 Testimony of JW Cook Re Util Qa/Qc Plans for Plant Completion.Completed Plant Will Conform to NRC Regulatory Requirements Based on Measures Taken to Improve Project Status Assessment,Sys Const & QA Implementation ML20069J0661983-04-11011 April 1983 Testimony of Ja Mooney Re Remedial Soils Work.Discusses Events Up to & Including Major Action Announced in Util ,Implementation of Commitments & Progress Rept on Completed Underpinning Work ML20069J0821983-04-0404 April 1983 Testimony of RM Wheeler Re Qa.Discusses Util Preparations to Drill Well Hole in safety-related Dirt Using Unauthorized Technique ML20072S5881983-03-30030 March 1983 Limited Appearance Statement of Bp Garde Re Lack of Third Party Independent Review of Actual Plant Condition ML20073H4541983-03-28028 March 1983 Transcript of 830328 Deposition of AB Savage on Sinclair Contention 4 Re Steam Generator Corrosion ML20069F6201983-03-18018 March 1983 Testimony of a Savage on Contention 4 Re Corrosion & Sludging of Condenser Tubes by Pond Water.Prof Qualifications Encl ML20079N0161983-02-28028 February 1983 P 4 of Dh Evans & D Sommers 830214 Testimony Re Sinclair Contention 14 on Cooling Pond,Inadvertently Omitted. Certificate of Svc Encl ML20071A0321983-02-14014 February 1983 Proposed Transcript Corrections for Nov & Dec 1982 Hearings ML20071A0701983-02-10010 February 1983 Testimony of Dh Evans & DA Sommers Re Sinclair OL Contention 14.Bechtel Thermal Performance Study & Plant Cooling Pond Operation Study Not Improperly Influenced by Data from Substantially Different Climatic Region ML20071A0821983-02-0707 February 1983 Testimony of J Bradley Re Sinclair OL Contention 14 on Dresden Fogging & Icing Studies.Conclusions in Plant Fes Re Fog & Ice Not Inconsistent W/Dresden Cooling Pond Experience.Certificate of Svc Encl ML20028E8641983-01-24024 January 1983 Testimony of P Shunmugavel Re Structural Evaluation of Auxiliary Bldg for Seismic Shakedown Settlement & Seismic Category I Duct Banks.Auxiliary Bldg Able to Withstand Effects of Shakedown Settlement ML20070R0411983-01-24024 January 1983 Testimony of Dr Anderson,Dt Perry & Gb Slade Re Sinclair Contention 3 on Potential for Water Hammer. Certificate of Svc Encl ML20028E1471983-01-17017 January 1983 Testimony of C Hillman & T Postlewait on Sinclair Contention 4.Contention Has Faulty Premise.Administrative Procedures & Design Features of Plant Adequate to Meet B&W Specified Secondary Water Chemistry Limits.Related Correspondence ML20028E1561983-01-14014 January 1983 Testimony of Rd Woods Re Seismic Shakedown Settlement at Site.Reasonable Assurance Exists That Plant Area Including Piping & Duct Banks Will Not Suffer Excessive Settlement Due to Seismic Shutdown.Related Correspondence ML20028E1631983-01-13013 January 1983 Testimony of Bj Garrick & LS Gibson Re Analysis of Class 9 Accidents in Plant Fes.Conclusion in Fes That Risk to Public from Potential Accidents Is Small Not Invalidated by Precursor Study.W/Certificate of Svc.Related Correspondence ML20070A1931982-12-0606 December 1982 Revised Testimony of RB Peck.Surcharge Program at Diesel Generator Bldg Eliminated Potential Future Settlement Problems Due to Compressibility of Plant Fill Matl & Lack of Homogeneity ML20069L9631982-11-15015 November 1982 Testimony of W Bird & R Wheeler Providing Addl Info on Nonconformance Repts Per ASLB Request in 820707 Memorandum & Order.Procedures Outlined Provide Adequate Controls to Prevent Damage to Underground Utils.Certificate of Svc Encl ML20069L9511982-11-0808 November 1982 Testimony of Wg Corley Re Plant Concrete Wall Crack Repair Program.Rept Entitled, Effects of Cracks on Serviceability of Structures at Midland Plant, Encl ML20069L9561982-11-0303 November 1982 Testimony of RB Peck.Surcharge Program at Diesel Generator Bldg Eliminated Any Potential Future Settlement Problems Due to Compressibility of Plant Fill Matl & Due to Lack of Homogeneity ML20065Q2201982-10-25025 October 1982 Testimony of a Boos,Em Burke,Jp Gould & P Shunmugarel Re Svc Water Pump Structure.Aperture Cards Available in PDR ML20065M9171982-10-15015 October 1982 Testimony of Rd Woods Re Liquefaction of Saturated Sand During Earthquake.After Remedial Measures Taken,Plant Will Be Safe Re Liquefaction of Sands.Related Correspondence. Oversize Drawings Encl.Aperture Cards Available in PDR ML20065M9031982-10-15015 October 1982 Testimony of Wc Paris Re Permanent Dewatering Sys for Site. Sys Will Provide Acceptable Method for Removing Water from Granular Plant Fill Matl.Related Correspondence.Oversize Drawings Encl.Aperture Cards Available in PDR ML20065Q2521982-10-14014 October 1982 Testimony of Wg Corley Re Cracking in Svc Water Pump Structure ML20027C1531982-10-0808 October 1982 Testimony of Aj Hendron Re Evaluation of Seismic Shakedown Settlement of Diesel Generator Bldg in Event of Earthquake. Prof Qualifications & Supporting Documentation Encl ML20063P2991982-10-0808 October 1982 Testimony of Aj Hendron Re Evaluation of Ultimate Load Carrying Capacity of Diesel Generator Bldg Footings.Prof Qualifications,Supporting Documentation & Certificate of Svc Encl ML20027C1631982-10-0707 October 1982 Testimony of DF Lewis on Behalf of Applicant Re Underground Piping.Affidavit & Supporting Documentation Encl ML20062K1011982-08-13013 August 1982 Transcript of 820813 Meeting in Midland,Mi.Pp 8,317-8,546 ML20062K0851982-08-12012 August 1982 Transcript of 820812 Hearing in Midland,Mi.Pp 8,100-8,316 ML20140H0021982-05-20020 May 1982 Statement of C Anderson Before ACRS Subcommittee 820520-21 Meetings Re Review of Application for Ol.Statement Addresses Soil/Structure Interaction Problems.Addenda 1 & 2 Encl ML20140H0131982-05-20020 May 1982 Statement of MP Sinclair Before ACRS Subcommittee on Midland Plant 820520-21 Meetings Re Review of Application for Ol. Statement Addresses Plant Design & Qualification Deficiencies ML20040F4141982-02-0404 February 1982 Testimony of Aj Boos & Rd Hanson Re Remedial Measures for Borated Water Storage Tank.Describes Analytical Work Performed on Tank Foundations,Soil Bearing Pressure & Settlement Predications.W/Affidavits & Prof Qualifications ML20040F4511982-02-0404 February 1982 Testimony of RP Kennedy & Rd Campbell.Uneven Tank Support Resulting from Soil Settlement Has Not Damaged Borated Water Storage Tanks.Design Basis Has Not Been Violated Nor Safe Operating Life Reduced ML20049J4861982-02-0202 February 1982 Errata to Transcripts of 820202 Hearing in Midland,Mi ML20040F4841982-02-0202 February 1982 Testimony of DF Lewis,Df Landers & Jk Meisenheimer Re Underground Piping & Tanks.Seven Oversize Drawings Encl. Aperture Cards Available in Pdr.Affidavit,Certificate of Svc & Prof Qualifications Encl ML20038A9381981-11-19019 November 1981 Testimony of EM Burke,Wg Corley,Jp Gould,Te Johnson & M Sozen Re Remedial Measures for Facility Auxiliary Bldg & Feedwater Isolation Valve Pits,Vols 1 & 2.Certificate of Svc Encl ML20005C0391981-11-0505 November 1981 Proposed Corrections to Transcript of 810805 Hearing in Midland,Mi.Notice of Appearance Encl ML20009D9181981-07-23023 July 1981 Testimony Re Stability of Dikes Adjacent to Emergency Cooling Water Reservoir,Per Stamiris Contention 4.B.Prof Qualifications & Certificate of Svc Encl ML20126L8431981-06-0808 June 1981 Testimony of Ds Hood That If NRC Had Known How Util Was to Implement QA Program,Nrc Would Have Been Warranted in Not Issuing CPs for Original Application ML20126L8851981-06-0808 June 1981 Testimony of Ds Hood Re ASLB Question on Continued Const.Nrc Does Not Object to Proceeding W/Surcharging Valve Pits Adjacent to Borated Water Tanks If Acceptable Program Worked Out.Prof Qualifications & Certificate of Svc Encl 1985-06-20
[Table view] Category:DEPOSITIONS
MONTHYEARML20127N7591985-06-20020 June 1985 Transcript of Commission 850620 Affirmation/Discussion & Vote in Washington,Dc Concerning Denial of 2.206 Petition for Midland plant,SECY-85-60 Concerning Pressurized Thermal Shock Rule & Shoreham Order.Pp 1-4 ML20082D9041983-11-21021 November 1983 Portions of Jl Donnell Deposition,Designated as Direct Testimony.Certificate of Svc Encl ML20090H3461983-10-15015 October 1983 Transcript of Jl Donnell 831015 Deposition in Las Vegas,Nv Re Alleged Violation of ASLB Order ML20076L6471983-07-11011 July 1983 Testimony of Ps Glass Re Cable & Conduit Installation for Underpinning Instrumentation of Auxiliary Bldg.Oversize Matrix Encl.Aperture Card Available in PDR ML20076L6361983-07-11011 July 1983 Testimony of R Black Re Events During Late Winter 1982 & Early Spring 1982 & Installation of Cable Related to Instrumentation for Underpinning Work on Auxiliary Bldg ML20073H3621983-04-13013 April 1983 Two Attachments to RA Wells Testimony,Inadvertently Omitted from Original Submittal.Certificate of Svc Encl ML20069J0621983-04-11011 April 1983 Testimony of RA Wells Re Recent Changes in Organization of QA Dept,Including Changes in Organizational Structure & Responsibility for & Direction of QC Function ML20073D7291983-04-11011 April 1983 Testimony of Ja Rutgers on Qa.Responds to Specific Items Addressed in Attachment to J Keppler 821029 QA Testimony ML20069J0731983-04-11011 April 1983 Testimony of Ja Mooney & RM Wheeler Re Alleged Violation of ASLB 820430 Order & Mar 1982 Cable Pulling Incident.Util Was Unaware NRC Required Explicit Review & Approval for Fireline Excavation & Excavation Below Deep Q-duct Bank ML20069J0761983-04-11011 April 1983 Testimony of WR Bird Re Qa.Installation of Trench Excavation Near Turbine Bldg W/Slope Layback Installed Incorrectly Due to Difficulty in Determining Ref Point for Horizontal Dimension ML20069J0861983-04-11011 April 1983 Testimony of Bh Peck.Const Completion Program Addresses All Identified NRC Concerns Resulting from Insp of Diesel Generator Bldg.Certificate of Svc Encl ML20069J0571983-04-11011 April 1983 Testimony of JW Cook Re Util Qa/Qc Plans for Plant Completion.Completed Plant Will Conform to NRC Regulatory Requirements Based on Measures Taken to Improve Project Status Assessment,Sys Const & QA Implementation ML20069J0661983-04-11011 April 1983 Testimony of Ja Mooney Re Remedial Soils Work.Discusses Events Up to & Including Major Action Announced in Util ,Implementation of Commitments & Progress Rept on Completed Underpinning Work ML20069J0821983-04-0404 April 1983 Testimony of RM Wheeler Re Qa.Discusses Util Preparations to Drill Well Hole in safety-related Dirt Using Unauthorized Technique ML20072S5881983-03-30030 March 1983 Limited Appearance Statement of Bp Garde Re Lack of Third Party Independent Review of Actual Plant Condition ML20073H4541983-03-28028 March 1983 Transcript of 830328 Deposition of AB Savage on Sinclair Contention 4 Re Steam Generator Corrosion ML20069F6201983-03-18018 March 1983 Testimony of a Savage on Contention 4 Re Corrosion & Sludging of Condenser Tubes by Pond Water.Prof Qualifications Encl ML20079N0161983-02-28028 February 1983 P 4 of Dh Evans & D Sommers 830214 Testimony Re Sinclair Contention 14 on Cooling Pond,Inadvertently Omitted. Certificate of Svc Encl ML20071A0321983-02-14014 February 1983 Proposed Transcript Corrections for Nov & Dec 1982 Hearings ML20071A0701983-02-10010 February 1983 Testimony of Dh Evans & DA Sommers Re Sinclair OL Contention 14.Bechtel Thermal Performance Study & Plant Cooling Pond Operation Study Not Improperly Influenced by Data from Substantially Different Climatic Region ML20071A0821983-02-0707 February 1983 Testimony of J Bradley Re Sinclair OL Contention 14 on Dresden Fogging & Icing Studies.Conclusions in Plant Fes Re Fog & Ice Not Inconsistent W/Dresden Cooling Pond Experience.Certificate of Svc Encl ML20028E8641983-01-24024 January 1983 Testimony of P Shunmugavel Re Structural Evaluation of Auxiliary Bldg for Seismic Shakedown Settlement & Seismic Category I Duct Banks.Auxiliary Bldg Able to Withstand Effects of Shakedown Settlement ML20070R0411983-01-24024 January 1983 Testimony of Dr Anderson,Dt Perry & Gb Slade Re Sinclair Contention 3 on Potential for Water Hammer. Certificate of Svc Encl ML20028E1471983-01-17017 January 1983 Testimony of C Hillman & T Postlewait on Sinclair Contention 4.Contention Has Faulty Premise.Administrative Procedures & Design Features of Plant Adequate to Meet B&W Specified Secondary Water Chemistry Limits.Related Correspondence ML20028E1561983-01-14014 January 1983 Testimony of Rd Woods Re Seismic Shakedown Settlement at Site.Reasonable Assurance Exists That Plant Area Including Piping & Duct Banks Will Not Suffer Excessive Settlement Due to Seismic Shutdown.Related Correspondence ML20028E1631983-01-13013 January 1983 Testimony of Bj Garrick & LS Gibson Re Analysis of Class 9 Accidents in Plant Fes.Conclusion in Fes That Risk to Public from Potential Accidents Is Small Not Invalidated by Precursor Study.W/Certificate of Svc.Related Correspondence ML20070A1931982-12-0606 December 1982 Revised Testimony of RB Peck.Surcharge Program at Diesel Generator Bldg Eliminated Potential Future Settlement Problems Due to Compressibility of Plant Fill Matl & Lack of Homogeneity ML20069L9631982-11-15015 November 1982 Testimony of W Bird & R Wheeler Providing Addl Info on Nonconformance Repts Per ASLB Request in 820707 Memorandum & Order.Procedures Outlined Provide Adequate Controls to Prevent Damage to Underground Utils.Certificate of Svc Encl ML20069L9511982-11-0808 November 1982 Testimony of Wg Corley Re Plant Concrete Wall Crack Repair Program.Rept Entitled, Effects of Cracks on Serviceability of Structures at Midland Plant, Encl ML20069L9561982-11-0303 November 1982 Testimony of RB Peck.Surcharge Program at Diesel Generator Bldg Eliminated Any Potential Future Settlement Problems Due to Compressibility of Plant Fill Matl & Due to Lack of Homogeneity ML20065Q2201982-10-25025 October 1982 Testimony of a Boos,Em Burke,Jp Gould & P Shunmugarel Re Svc Water Pump Structure.Aperture Cards Available in PDR ML20065M9171982-10-15015 October 1982 Testimony of Rd Woods Re Liquefaction of Saturated Sand During Earthquake.After Remedial Measures Taken,Plant Will Be Safe Re Liquefaction of Sands.Related Correspondence. Oversize Drawings Encl.Aperture Cards Available in PDR ML20065M9031982-10-15015 October 1982 Testimony of Wc Paris Re Permanent Dewatering Sys for Site. Sys Will Provide Acceptable Method for Removing Water from Granular Plant Fill Matl.Related Correspondence.Oversize Drawings Encl.Aperture Cards Available in PDR ML20065Q2521982-10-14014 October 1982 Testimony of Wg Corley Re Cracking in Svc Water Pump Structure ML20027C1531982-10-0808 October 1982 Testimony of Aj Hendron Re Evaluation of Seismic Shakedown Settlement of Diesel Generator Bldg in Event of Earthquake. Prof Qualifications & Supporting Documentation Encl ML20063P2991982-10-0808 October 1982 Testimony of Aj Hendron Re Evaluation of Ultimate Load Carrying Capacity of Diesel Generator Bldg Footings.Prof Qualifications,Supporting Documentation & Certificate of Svc Encl ML20027C1631982-10-0707 October 1982 Testimony of DF Lewis on Behalf of Applicant Re Underground Piping.Affidavit & Supporting Documentation Encl ML20062K1011982-08-13013 August 1982 Transcript of 820813 Meeting in Midland,Mi.Pp 8,317-8,546 ML20062K0851982-08-12012 August 1982 Transcript of 820812 Hearing in Midland,Mi.Pp 8,100-8,316 ML20140H0021982-05-20020 May 1982 Statement of C Anderson Before ACRS Subcommittee 820520-21 Meetings Re Review of Application for Ol.Statement Addresses Soil/Structure Interaction Problems.Addenda 1 & 2 Encl ML20140H0131982-05-20020 May 1982 Statement of MP Sinclair Before ACRS Subcommittee on Midland Plant 820520-21 Meetings Re Review of Application for Ol. Statement Addresses Plant Design & Qualification Deficiencies ML20040F4141982-02-0404 February 1982 Testimony of Aj Boos & Rd Hanson Re Remedial Measures for Borated Water Storage Tank.Describes Analytical Work Performed on Tank Foundations,Soil Bearing Pressure & Settlement Predications.W/Affidavits & Prof Qualifications ML20040F4511982-02-0404 February 1982 Testimony of RP Kennedy & Rd Campbell.Uneven Tank Support Resulting from Soil Settlement Has Not Damaged Borated Water Storage Tanks.Design Basis Has Not Been Violated Nor Safe Operating Life Reduced ML20049J4861982-02-0202 February 1982 Errata to Transcripts of 820202 Hearing in Midland,Mi ML20040F4841982-02-0202 February 1982 Testimony of DF Lewis,Df Landers & Jk Meisenheimer Re Underground Piping & Tanks.Seven Oversize Drawings Encl. Aperture Cards Available in Pdr.Affidavit,Certificate of Svc & Prof Qualifications Encl ML20038A9381981-11-19019 November 1981 Testimony of EM Burke,Wg Corley,Jp Gould,Te Johnson & M Sozen Re Remedial Measures for Facility Auxiliary Bldg & Feedwater Isolation Valve Pits,Vols 1 & 2.Certificate of Svc Encl ML20005C0391981-11-0505 November 1981 Proposed Corrections to Transcript of 810805 Hearing in Midland,Mi.Notice of Appearance Encl ML20009D9181981-07-23023 July 1981 Testimony Re Stability of Dikes Adjacent to Emergency Cooling Water Reservoir,Per Stamiris Contention 4.B.Prof Qualifications & Certificate of Svc Encl ML20126L8431981-06-0808 June 1981 Testimony of Ds Hood That If NRC Had Known How Util Was to Implement QA Program,Nrc Would Have Been Warranted in Not Issuing CPs for Original Application ML20126L8851981-06-0808 June 1981 Testimony of Ds Hood Re ASLB Question on Continued Const.Nrc Does Not Object to Proceeding W/Surcharging Valve Pits Adjacent to Borated Water Tanks If Acceptable Program Worked Out.Prof Qualifications & Certificate of Svc Encl 1985-06-20
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20127N7591985-06-20020 June 1985 Transcript of Commission 850620 Affirmation/Discussion & Vote in Washington,Dc Concerning Denial of 2.206 Petition for Midland plant,SECY-85-60 Concerning Pressurized Thermal Shock Rule & Shoreham Order.Pp 1-4 ML20082D9041983-11-21021 November 1983 Portions of Jl Donnell Deposition,Designated as Direct Testimony.Certificate of Svc Encl ML20090H3461983-10-15015 October 1983 Transcript of Jl Donnell 831015 Deposition in Las Vegas,Nv Re Alleged Violation of ASLB Order ML20076L6471983-07-11011 July 1983 Testimony of Ps Glass Re Cable & Conduit Installation for Underpinning Instrumentation of Auxiliary Bldg.Oversize Matrix Encl.Aperture Card Available in PDR ML20076L6361983-07-11011 July 1983 Testimony of R Black Re Events During Late Winter 1982 & Early Spring 1982 & Installation of Cable Related to Instrumentation for Underpinning Work on Auxiliary Bldg ML20073H3621983-04-13013 April 1983 Two Attachments to RA Wells Testimony,Inadvertently Omitted from Original Submittal.Certificate of Svc Encl ML20069J0621983-04-11011 April 1983 Testimony of RA Wells Re Recent Changes in Organization of QA Dept,Including Changes in Organizational Structure & Responsibility for & Direction of QC Function ML20073D7291983-04-11011 April 1983 Testimony of Ja Rutgers on Qa.Responds to Specific Items Addressed in Attachment to J Keppler 821029 QA Testimony ML20069J0731983-04-11011 April 1983 Testimony of Ja Mooney & RM Wheeler Re Alleged Violation of ASLB 820430 Order & Mar 1982 Cable Pulling Incident.Util Was Unaware NRC Required Explicit Review & Approval for Fireline Excavation & Excavation Below Deep Q-duct Bank ML20069J0761983-04-11011 April 1983 Testimony of WR Bird Re Qa.Installation of Trench Excavation Near Turbine Bldg W/Slope Layback Installed Incorrectly Due to Difficulty in Determining Ref Point for Horizontal Dimension ML20069J0861983-04-11011 April 1983 Testimony of Bh Peck.Const Completion Program Addresses All Identified NRC Concerns Resulting from Insp of Diesel Generator Bldg.Certificate of Svc Encl ML20069J0571983-04-11011 April 1983 Testimony of JW Cook Re Util Qa/Qc Plans for Plant Completion.Completed Plant Will Conform to NRC Regulatory Requirements Based on Measures Taken to Improve Project Status Assessment,Sys Const & QA Implementation ML20069J0661983-04-11011 April 1983 Testimony of Ja Mooney Re Remedial Soils Work.Discusses Events Up to & Including Major Action Announced in Util ,Implementation of Commitments & Progress Rept on Completed Underpinning Work ML20069J0821983-04-0404 April 1983 Testimony of RM Wheeler Re Qa.Discusses Util Preparations to Drill Well Hole in safety-related Dirt Using Unauthorized Technique ML20072S5881983-03-30030 March 1983 Limited Appearance Statement of Bp Garde Re Lack of Third Party Independent Review of Actual Plant Condition ML20073H4541983-03-28028 March 1983 Transcript of 830328 Deposition of AB Savage on Sinclair Contention 4 Re Steam Generator Corrosion ML20069F6201983-03-18018 March 1983 Testimony of a Savage on Contention 4 Re Corrosion & Sludging of Condenser Tubes by Pond Water.Prof Qualifications Encl ML20079N0161983-02-28028 February 1983 P 4 of Dh Evans & D Sommers 830214 Testimony Re Sinclair Contention 14 on Cooling Pond,Inadvertently Omitted. Certificate of Svc Encl ML20071A0321983-02-14014 February 1983 Proposed Transcript Corrections for Nov & Dec 1982 Hearings ML20071A0701983-02-10010 February 1983 Testimony of Dh Evans & DA Sommers Re Sinclair OL Contention 14.Bechtel Thermal Performance Study & Plant Cooling Pond Operation Study Not Improperly Influenced by Data from Substantially Different Climatic Region ML20071A0821983-02-0707 February 1983 Testimony of J Bradley Re Sinclair OL Contention 14 on Dresden Fogging & Icing Studies.Conclusions in Plant Fes Re Fog & Ice Not Inconsistent W/Dresden Cooling Pond Experience.Certificate of Svc Encl ML20028E8641983-01-24024 January 1983 Testimony of P Shunmugavel Re Structural Evaluation of Auxiliary Bldg for Seismic Shakedown Settlement & Seismic Category I Duct Banks.Auxiliary Bldg Able to Withstand Effects of Shakedown Settlement ML20070R0411983-01-24024 January 1983 Testimony of Dr Anderson,Dt Perry & Gb Slade Re Sinclair Contention 3 on Potential for Water Hammer. Certificate of Svc Encl ML20028E1471983-01-17017 January 1983 Testimony of C Hillman & T Postlewait on Sinclair Contention 4.Contention Has Faulty Premise.Administrative Procedures & Design Features of Plant Adequate to Meet B&W Specified Secondary Water Chemistry Limits.Related Correspondence ML20028E1561983-01-14014 January 1983 Testimony of Rd Woods Re Seismic Shakedown Settlement at Site.Reasonable Assurance Exists That Plant Area Including Piping & Duct Banks Will Not Suffer Excessive Settlement Due to Seismic Shutdown.Related Correspondence ML20028E1631983-01-13013 January 1983 Testimony of Bj Garrick & LS Gibson Re Analysis of Class 9 Accidents in Plant Fes.Conclusion in Fes That Risk to Public from Potential Accidents Is Small Not Invalidated by Precursor Study.W/Certificate of Svc.Related Correspondence ML20070A1931982-12-0606 December 1982 Revised Testimony of RB Peck.Surcharge Program at Diesel Generator Bldg Eliminated Potential Future Settlement Problems Due to Compressibility of Plant Fill Matl & Lack of Homogeneity ML20069L9631982-11-15015 November 1982 Testimony of W Bird & R Wheeler Providing Addl Info on Nonconformance Repts Per ASLB Request in 820707 Memorandum & Order.Procedures Outlined Provide Adequate Controls to Prevent Damage to Underground Utils.Certificate of Svc Encl ML20069L9511982-11-0808 November 1982 Testimony of Wg Corley Re Plant Concrete Wall Crack Repair Program.Rept Entitled, Effects of Cracks on Serviceability of Structures at Midland Plant, Encl ML20069L9561982-11-0303 November 1982 Testimony of RB Peck.Surcharge Program at Diesel Generator Bldg Eliminated Any Potential Future Settlement Problems Due to Compressibility of Plant Fill Matl & Due to Lack of Homogeneity ML20065Q2201982-10-25025 October 1982 Testimony of a Boos,Em Burke,Jp Gould & P Shunmugarel Re Svc Water Pump Structure.Aperture Cards Available in PDR ML20065M9171982-10-15015 October 1982 Testimony of Rd Woods Re Liquefaction of Saturated Sand During Earthquake.After Remedial Measures Taken,Plant Will Be Safe Re Liquefaction of Sands.Related Correspondence. Oversize Drawings Encl.Aperture Cards Available in PDR ML20065M9031982-10-15015 October 1982 Testimony of Wc Paris Re Permanent Dewatering Sys for Site. Sys Will Provide Acceptable Method for Removing Water from Granular Plant Fill Matl.Related Correspondence.Oversize Drawings Encl.Aperture Cards Available in PDR ML20065Q2521982-10-14014 October 1982 Testimony of Wg Corley Re Cracking in Svc Water Pump Structure ML20027C1531982-10-0808 October 1982 Testimony of Aj Hendron Re Evaluation of Seismic Shakedown Settlement of Diesel Generator Bldg in Event of Earthquake. Prof Qualifications & Supporting Documentation Encl ML20063P2991982-10-0808 October 1982 Testimony of Aj Hendron Re Evaluation of Ultimate Load Carrying Capacity of Diesel Generator Bldg Footings.Prof Qualifications,Supporting Documentation & Certificate of Svc Encl ML20027C1631982-10-0707 October 1982 Testimony of DF Lewis on Behalf of Applicant Re Underground Piping.Affidavit & Supporting Documentation Encl ML20062K1011982-08-13013 August 1982 Transcript of 820813 Meeting in Midland,Mi.Pp 8,317-8,546 ML20062K0851982-08-12012 August 1982 Transcript of 820812 Hearing in Midland,Mi.Pp 8,100-8,316 ML20140H0021982-05-20020 May 1982 Statement of C Anderson Before ACRS Subcommittee 820520-21 Meetings Re Review of Application for Ol.Statement Addresses Soil/Structure Interaction Problems.Addenda 1 & 2 Encl ML20140H0131982-05-20020 May 1982 Statement of MP Sinclair Before ACRS Subcommittee on Midland Plant 820520-21 Meetings Re Review of Application for Ol. Statement Addresses Plant Design & Qualification Deficiencies ML20040F4141982-02-0404 February 1982 Testimony of Aj Boos & Rd Hanson Re Remedial Measures for Borated Water Storage Tank.Describes Analytical Work Performed on Tank Foundations,Soil Bearing Pressure & Settlement Predications.W/Affidavits & Prof Qualifications ML20040F4511982-02-0404 February 1982 Testimony of RP Kennedy & Rd Campbell.Uneven Tank Support Resulting from Soil Settlement Has Not Damaged Borated Water Storage Tanks.Design Basis Has Not Been Violated Nor Safe Operating Life Reduced ML20049J4861982-02-0202 February 1982 Errata to Transcripts of 820202 Hearing in Midland,Mi ML20040F4841982-02-0202 February 1982 Testimony of DF Lewis,Df Landers & Jk Meisenheimer Re Underground Piping & Tanks.Seven Oversize Drawings Encl. Aperture Cards Available in Pdr.Affidavit,Certificate of Svc & Prof Qualifications Encl ML20038A9381981-11-19019 November 1981 Testimony of EM Burke,Wg Corley,Jp Gould,Te Johnson & M Sozen Re Remedial Measures for Facility Auxiliary Bldg & Feedwater Isolation Valve Pits,Vols 1 & 2.Certificate of Svc Encl ML20005C0391981-11-0505 November 1981 Proposed Corrections to Transcript of 810805 Hearing in Midland,Mi.Notice of Appearance Encl ML20009D9181981-07-23023 July 1981 Testimony Re Stability of Dikes Adjacent to Emergency Cooling Water Reservoir,Per Stamiris Contention 4.B.Prof Qualifications & Certificate of Svc Encl ML20126L8431981-06-0808 June 1981 Testimony of Ds Hood That If NRC Had Known How Util Was to Implement QA Program,Nrc Would Have Been Warranted in Not Issuing CPs for Original Application ML20126L8851981-06-0808 June 1981 Testimony of Ds Hood Re ASLB Question on Continued Const.Nrc Does Not Object to Proceeding W/Surcharging Valve Pits Adjacent to Borated Water Tanks If Acceptable Program Worked Out.Prof Qualifications & Certificate of Svc Encl 1985-06-20
[Table view] |
Text
. -. . _- - .
.e
?
f UNITED STAl2S OF AMERICA 4
.g G
NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter.of )
)
CONSUMERS POWR COMPANY ) Docket Nos. 50-329 OM & OL
) 50-330 OM & OL t
. ) !
(MidlandPlant, Units 1and2)
)
TESTIMONY OF DARL S. HOOD WITH RESPECT TO A LICENSING BOARD QUESTION CONCERNING CONTINUED CONSTRUCTION -
Q. 1.- Please state your name and position with the NRC.
A. My name is Darl S. Hood. I am a Senior Project Manager !
in the Division of Licensing, Office of Nuclear Reactor Regulation, U.S.
Nuclear Regulatory Commission, f
Q. 2. Have you prepared a statement of professional qualifications?
A. Yes. - A copy of this statement is attached.
Q. 3. Please state the duration and nature of your responsibilities with respect to the Midlant Plant, Units 1 and 2.
A. I am the Project Manager for the Midland Plant application for. operating licenses. I have served in that. position from August 29, 1977, when the application for operating licenses was tendered to the NRC for acceptance review, up to the present time. My responsibilities include management of the Staff's environmental and radiological safety reviews.
81060,90]SO.
1 o
~ y. 4. Please state the purpose of this testimony.
A. During the Prehearing Conference on January 28-29, 1981 and:in its Prehearing Conference Memorandum of February 27, 1981, the I Licensing Board that if on-going or near-term construction activities could.have an adverse impact on proposed remedies, the Staff should present evidence to that effect so that the Board could consider whether any halt in. planned or on-going construction activities would be appropriate pending resolution of the soils settlement questions'. This testimony is in response
't'o the Board's statement.
l Q. 5. What is the NRC Staff's position regarding the Board's statement?
1 A. The Staff has been advised by Consumers that there are two near-term construction activities important to their scheduling needs that they wish to begin at this time. These activities include: l l
- 1. Proceeding with the installation of 20 permanent back-up interceptor wells in the area near the Service Water Structure i and the Circulating Water Intake Structure. This work is in preparation for dewatering and installing the remedial supporting wall beneath the overhang portion of the Service Water Structure.
- 2. Surcharging the two valve pits which are adjacent to each of the Borated Water Storage Tanks.
1 J
Over the last several months the Staff and Consumers have been i
resolving their differences on proceeding with the installation of the l
l I
V _
3 -
3- t 20 back-up wells. A revised specification and Q/A program for' installing the wells which incorporates the recommendations of the NRC Staff and the Corps of Engineers is to be provided by Consumers the week of June 8,1981.
Upon receipt and favorable review by.the Staff of the revised specification and Q/A program, the NRC will.be in a position.to concur with Consumer's decision to proceed with the well installations.
The Staff indicated at meetings held with Consumers in Bethesda on May 5-7, 1981 that there was no objection with proceeding with surcharging of the valve pits adjacent to the borated water tanks provided agreement with the Staff could be reached on an acceptable program for monitoring ofl settlement and potential structural distress during surcharging and I on the need for' disconnecting piping leading to the vavle pits. These concerns of the Staff are not yet resolved.
, _ _ _ . . . _ , . . - _ . . , _...,,_..._,,..-,,..,r_... , ,m.,_,.._....... . . . , - , . . . . , . w_.,_ , . _ , , . ..-. , --
4 DARL S. HOOD OFFICE OF NUCLEAR REACTOR REGULATION U.S. NUCLEAR REGULATORY COMMISSION PROFESSIONAL QUALIFICATIONS I an a Senior Project Manager in the Division of Licensing, Office of Nuclear Reactor Regulation. I am responsible for nanaging licensing (
activities by the Commission with respect to Midland Plant, Units 1 and 2.
I have served in the position of Project Manager with the Comission since August 1976. This position provides for the nanaging of ;
radiological safety reviews of applications for licenses and authorization to construct or operate light water nuclear power plants.
As of April 1980, the position also provides for the nanaging of the environmental reviews of such applications. I assuned responsibility for fiidland Plant, Units 1 and 2, when the application for operating licenses was tendered in August 1977. Other nuclear plants for which I have previously served in this capacity are the standardization design of Westinghouse which is designated RESAR-414 (Docket STN50-572), Catawaba f Nuclear Station, Units 1 and 2 (Dockets 50-413 and 50-414}, and River -
\ Bend Station, Units 1 and 2 (Dockets 50-458 and 50-459).
Between June 1969 and August 1976 I held two sequential positions within the Nuclear Power Systems Division of Combustion Engineering, Inc.
(C-E) at Windsor, Connecticut. After flarch, 1973, I was Assistant Project lianager for the Duke Power Project. This position provided assistance in directing all efforts by C-E to design, f abricate, purchase and license the nuclear steam supply systens, reactor core, and associated auxiliary systems for Cherokee Units 1, 2 & 3 and Thomas L.
Perkins Units 1, 2 & 3. The position assured that all aspects of the l contracts were met and that safe and reliable systens were provided to !
the required schedule and at a reasonable profit to C-E. I assisted Duke '
Power in preparing the Preliminary Safety Analysis Report (PSAR) and provided for all C-E licensing support for these units. I also provided coordination of all other nuclear plants referencing the C-E Standard Safety Analysis Report to assure compatibility with C-E standard reference design. Until flarch,1973, I was a Project Engineer in C-E's Safety and Licensing Departnent and was responsible for licensing of nuclear power plants. I coordinated the preparation of the liillstone Unit 2 PSAR and FSAR and the Calvert Cliffs Units 1 & 2 FSAR and interfaced with NRC, the utility, architect engineer and all C-E functional departments on licensing support matters. I ensured that NRC criteria, standards, and guides were incorporated into the nuclear steam supply system design.
(
'O i ,
Between, August 1966 and June 1969, I was a Nuclear Safety and Radiation Analysis Engineer in the' Nuclear Safety Unit, Nuclear Division of the tiartin Marietta Corporation at Baltimore, Maryland. The purpose of this position was' to perfom hazard evaluations for nuclear power sources applied in space missions. My primary duty was to detemine public exposure to radiation for malfunctions occurring during the intended mission. I also detemined means by which the hazard potential for nuclear space systems could be mitigated to the extent that nuclear safety criteria were met. I conducted research with regards to the development of suitable criteria for permissable exposure levels and their. probabilities, taking into account the dependence of acceptable risk on-the benefit to be derived, fiy primar SNAP 29 (Systems for Nuclear Auxiliary Power)y assignment project. was withofthe My evaluations this nuclear power source included the fomulation and application of computerized models for the transport of fuel released at high altitudes, in deep ocean and in shallow waters.- I' derived models for these release areas to incorporate the activity into human food chains and determined the expected ingestion dose, the number of people involved and the exposure probabilities. Inhaletion dose was determined for radioactive fallout from the high-altitude release.
Detween February 1965 and August 1966 I was a Nuclear Quality Control ;
Engineer within the Electric Boat Division of General Dynamics at Groton, Connecticut. The purpose of this position was to provide control of-
..( quality for naval reactor systems, components, and shielding during the construction or overhaul of submarines by this shipyard. - My primary area of responsibility was shielding. Duties included establishing procedures for the inspection of fabrication and installation of lead and polyethylene shielding, and resolving problems in complying with these or other shielding procedures.- The position required a knowledge of nuclear theory, SSW systems design, Bureau of Ships contract and design requirements, non-destructive testing techniques, and quality control requirements.
Between November 1963 and February 1965, I was an Aeronautical Engineer for Nuclear Propulsion and Power at the George C. Marshall Space Flight Center, National Aeronautics and Space Administration in Huntsville, y Alabama. I perfomed investigations of the nature and nagnitude of the nuclear radiation environment, shielding systems and safety systens associated with proposed nuclear space vehicles for candidate space missions.
Between November 1963 and college graduation in 1962, I held various positions including chief of a missile electronics training unit at Redstone Arsenal, Alabama; student at the U.S. ' Amy Signal Officer's Orientation Course at Fort Gordon, Georgia; and fiarine Engineer for ordinance and special weapons within the Design Division of the Norfolk Naval Shipyard, Portsmouth, Virginia.
I
4
'1
~',
l t
1 received a Bachelor of. Science Degree in Nuclear Engineering fram North
-Carolina State University in 1962.. I am a member of the Health Physics
. Society.-
l L
I I
I e
E d
b i
i f L f
.{.
. _ - . _ , - . _ . . . . _ . , . , _ _ . _ , , (
- h, UNITED STATES OF AMiRICA S.
$. NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD <
In the Matter of C0f:SUl1ERS POWER COMPANY Docket Nos. 50-329-0M & OL 50-330-0M & OL (Midland Plant, Units 1 and 2) )
CERTIFICATE OF SERVICE, I hereby certify that copies of the following NRC Staff testimony - (1) NRC STAFF TESTIMONY OF EUGENE J. GALLA3HER WITH RESPECT TO QUALITY ASSURANCE PROGRAM: IMPLEMENTATION PRIOR TO DECEMBER 6, 1979; (2) NRC STAFF TESTIMONY OF JAMES G. KEPPLER WITH RESPECT TO THE QUALITY ASSURANCE IMPLEMENTATION PRIOR T0. DECEMBER 6,1979;.(3) NRC STAFF TESTIMONY WITH RESPECT TO QUALITY ASSURANCE; (4) TESTIMONY 0F JOSEPH D.-KANE WITH RESPECT TO THE QUALITY ASSURANCE PROGRAM IMPLEMENTATION PRIOR TO DECEMBER 6, 1979; (5) TESTIMONY OF DARL S. HOOD WITH RESPECT TO THE-QUALITY ASSURANCE PROGRAM IMPLEMENTATION PRIOR TO DECEMBER 6, 1979; (6) NRC STAFF TESTIMONY WITH RESPECT T0. IMPLEMENTATION OF QUALITY ASSUR-
' ANCE FOR S0ILS WORK AND REMEDIAL MEASURES ArTER DECEMBER 6, 1979; (7) NRC STAFF TESTIMONY OF DARL S. HOOD, JEFFREY K. KIMBALL AND EUGENE GALLAGHER'ON STAMIRIS CONTENTION,1; (8) NRC STAFF TESTIMONY OF DARL HOOD, JOSEPH KANE, FRANK RINALDI ,
AND EUGENE GALLAGHER ON STAMIRIS CONTENTION 2; and (9) NRC STAFF TESTIMONY WITH RESPECT TO INTERVEN0R.STAMIRIS CONTENTION NUMBER 3 in the above-captioned pro-ceeding have.been served on the following by deposit in the United States mail, first class,'or as indicated by one asterisk, through deposit in the Nuclear Regulatory Commission's internal mail system, or as indicated by two asterisks, by hand delivery, this 8th day of June, 1981.
l l ** Charles Bechhoefer, Esq. Ms. Mary Sinclair
! Atomic Safety.and Licensing Board 5711 Summerset Street '
U. S. Nuclear. Regulatory Commission Midland, Michigan 48640 Washington, D.C. 20555-P
- Administrative Judge Ralph S. Decker i hael I. er,Esk.
t Route *4, Box 190D Ronald G. Zamarin, Esq.
Cambridge, MD 21613 Alan S. Farnell, Esq.
Isham, Lincoln & Beale One First National Plaza Dr. Frederick P. Cowan 42nd Floor 6152 N. Verde. Trail Chicago, Illinois 60603 Apt. B-125 Boca Raton, Florida 33433
- Atomic Safety and Licensing Board Panel U. S. Nuclear Regulatory Comission Wishington, D.C. 20555 l . . . _ . . . - ._ ~ _ _ _ _. - . . _ . _ _ _ . _ _
, g. t Jaines E. Brunner, Esq. Jeann Linsley Consumers Power Company Bay City Times 212 West Michigan Avenue 311 Fifth Street Jackson, Michigan 49201 Bay City, Michigan 48706 Ms. Barbara Stamiris Paul C. Rau 5795 N. River Midland Daily Tkus Freeland, Michigan 48623 124 Mcdonald Street Midland, Michigan 48640 Mr. Steve Gadler Pau li ne a 55108 *At c a t a d L censing Wendell H. Marshall, Vice President U. S. Nuclear Regulatory Cctr.uission Midwest Environmental Protection Washington, D.C. 20555 A S RF
- D cketing and Service Section Midlar d, Michigan 48640 Office of the Secretary ,
U. S. Nuclear Regulatory Commission James 3. Kates Washington, D.C. 20555 203 5. Washington Avenue Saginaw, Michigan 48605 Frank J. Kelley Attorney General of the State of Michigan Steward H. Freeman Assistant Attorney General Gregory T. Taylor Assistant Attorney General Environmental Protection Division i
720 Law Building Lansing, Michigan 48913 Myron M. Cherry, Esq.
1 IBM Plaza Chicago, Illinois 60611 1
/
William D. Paton Counsel for NRC Staff
. . . . . - . . . . . - . .