Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20070E4671991-02-26026 February 1991 Comment Opposing Petition for Rulemaking PRM-73-9 Re Upgrading Design Basis Threat for Radiological Sabotage of Nuclear Reactors.Recommends That NRC Deny Petition to Increase Design Basis Threat for Security ML20207C1331986-12-18018 December 1986 Order Terminating CPPR-81 & CPPR-82,per Util 860711 Motion to Withdraw Applications for OLs ML20215E7301986-12-17017 December 1986 Memorandum & Order Authorizing Withdrawal of OL Application & Dismissing OL Proceeding,Per Applicant 860711 Motion. Served on 861218 ML20215B2071986-12-11011 December 1986 Responds to Questions Posed in ASLBP 861203 Memorandum & Order Re Conversion to gas-fired Facility.Imposition of Conditions on Withdrawal of OL Application Unnecessary. Certificate of Svc & Svc List Encl ML20211L6391986-12-11011 December 1986 Affidavit of Gb Staley Re Preparation of Answers to Board 861203 Questions on Termination of OL Proceeding. Certificate of Svc Encl ML20211L6181986-12-11011 December 1986 Response to Board 861203 Questions Re Util Request to Terminate OL Proceeding ML20214Q4431986-12-0303 December 1986 Memorandum & Order Granting Motion to Expedite Completion of Withdrawal Proceedings & Posing Questions to Parties.Served on 861204 ML20214G7941986-11-24024 November 1986 Motion to Expedite Completion of Withdrawal of Licensee OL Application & Terminate Pending OL & CP Mod Proceedings. Certificate of Svc Encl ML20214T7361986-09-26026 September 1986 Memorandum & Order Dismissing OM Proceeding as Moot & Deferring Action on Applicant Motion for Authorization to Withdraw OL Application Pending NRC Preparation of Environ Assessment.Served on 860929 ML20212M7661986-08-25025 August 1986 Response to Util 860711 Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings.Board Should Hold Motion in Abeyance Pending NRC Review of Stabilization Plan.Certificate of Svc Encl ML20206M8171986-08-15015 August 1986 Response to ASLB 860716 Order Requesting Responses Re Termination of OM Proceeding.Termination of OL Proceeding & Withdrawal of OL Application Requested.Om Proceeding Should Be Considered Moot.Certificate of Svc Encl ML20212B0311986-08-0101 August 1986 Memorandum & Order Withdrawing Retention of Jurisdiction Over Radon Issue Presented in Facility CP Proceeding & Vacating ASLB Partial Initial Decision on Remedial Soils in Consolidated CP Mod & OL Proceeding.Served on 860801 ML20212B0521986-07-31031 July 1986 Order Extending Time Until 860815 for Util & Other Parties to Respond to Questions Posed by 860716 ASLB Order.Time Extended Until 860825 for NRC Response to ASLB Questions & Util Motion.Served on 860801 ML20203F8791986-07-28028 July 1986 Response Supporting Util 860711 Motion for Termination of Appeal Board Jurisdiction Over Proceeding.Certificate of Svc Encl ML20207H6871986-07-22022 July 1986 Motion for Extension Until 860815 to File Responses to Four Questions Re Util Motion to Dismiss OL & OM Proceedings. Certificate of Svc Encl ML20207E2851986-07-16016 July 1986 Order Presenting Questions in Response to Util 860711 Motion to Dismiss OL Proceeding & to Terminate Order of Mod Proceeding.Served on 860717 ML20202G1621986-07-11011 July 1986 Notice of Change of Address for Washington Ofc of Isham, Lincoln & Beale,Attys for Util.Certificate of Svc Encl ML20202G0121986-07-11011 July 1986 Motion for Authorization to Withdraw OL Application & Dismissal of OL & Order of Mod Proceedings ML20202G1201986-07-11011 July 1986 Motion for Termination of Aslab Jurisdiction to Facilitate Termination of Cps,Withdrawal of OL Application & Dismissal of Consolidated OM-OL Proceeding ML20202G0491986-07-10010 July 1986 Affidavit of JW Cook Re Conversion of Plant Into combined- cycle,gas-fired Power Plant.Plant Never Operable as Nuclear facility.Nuclear-related Equipment Will Be Sold ML20202G0281986-07-0808 July 1986 Affidavit of Ta Mcnish Re True & Correct Extracts of 860408 & 0618 Minutes of Meetings.Resolutions Recited Therein in Full Force & Effect ML20198J3861986-05-27027 May 1986 Notice of ASLB Reconstitution.C Bechoefer,Chairman & J Harbour & Ga Linenberger,Members.Served on 860529 ML20198J4651986-05-27027 May 1986 Notice of ASLB Reconstitution.C Bechhoefer,Chairman & J Harbour & Ga Linenberger,Members.Served on 860529 ML20137E0041985-11-21021 November 1985 Notice of Appearance in Proceeding ML20137D9651985-11-21021 November 1985 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20133F6421985-10-0909 October 1985 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20134N3771985-08-30030 August 1985 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl DD-84-17, Order Affirming 840724 Director'S Decision DD-84-17 Denying Bp Garde 10CFR2.206 Petition for Action Against Util Re Plant Const.Const Abandoned on 840910.No Further Enforcement Action Required.Served on 8506241985-06-24024 June 1985 Order Affirming 840724 Director'S Decision DD-84-17 Denying Bp Garde 10CFR2.206 Petition for Action Against Util Re Plant Const.Const Abandoned on 840910.No Further Enforcement Action Required.Served on 850624 ML20127N7591985-06-20020 June 1985 Transcript of Commission 850620 Affirmation/Discussion & Vote in Washington,Dc Concerning Denial of 2.206 Petition for Midland plant,SECY-85-60 Concerning Pressurized Thermal Shock Rule & Shoreham Order.Pp 1-4 ML20133D9481985-05-13013 May 1985 Response to Aslab 850423 Order.Aslab Should Cancel OL Application & CPs Because Compliance W/Nrc Basic Requirements Not Met ML20116G5181985-04-29029 April 1985 Response to Memorandum of City & County of Midland,Mi Re ASLB 850405 & 0313 Orders on CP Mod Proceedings.Bechtel Should Not Be Granted Admission to Proceedings ML20115J5551985-04-19019 April 1985 City & County of Midland,State of Mi Response to Aslab 850313 Order to File Memoranda Re Whether Aslab Should Vacate ASLB Decision Re Certain Mods to CP Due to Mootness. Proof of Svc Encl ML20115J4751985-04-19019 April 1985 Memorandum in Response to Aslab 850405 Order Re Dismissal of OL Application.Application Neither Abandoned Nor Delayed in Dilutory Manner.Certificate of Svc Encl ML20115J5501985-04-19019 April 1985 Response Opposing Aslab 850405 Memorandum & Order Re Dismissal of OL Applications.Urges Board to Permit OL Applications to Continue in Suspension Until Applicant Affirmatively Resolves Disposition ML20116G5321985-04-19019 April 1985 Motion to Participate as Amicus Curiae in Resolution of Issue to Involuntary Dismissal of License Application,Per Aslab 850405 Memorandum & Order.Granted for Aslab on 850422. Served on 850429 ML20115J4351985-04-19019 April 1985 Motion for Leave to Participate as Amicus Curiae,Per Aslab 850313 & 0405 Memoranda & Orders Requesting Response to Questions Re Proceeding ML20115J5461985-04-19019 April 1985 Motion to Participate Amici Curiae in Resolution of Issue of Involuntary Dismissal of License Application as Identified in Aslab 850405 Memorandum & Order ML20115J5421985-04-19019 April 1985 City & County of Midland,State of Mi Motion for Leave to Participate as Amicus Curiae in Aslab Request for Responses to Questions Presented in 850313 & 0405 Memoranda Orders. Proof of Svc Encl ML20112J5281985-04-0101 April 1985 Memorandum in Response to Aslab 850313 Order LBP-85-2. Decision Should Not Be Vacated.Ol Should Be Dismissed.Based on Listed Changes,New OL Review Required ML20112J6301985-04-0101 April 1985 Memorandum Requesting Aslab Not Take Any Action to Vacate LBP-85-2 or Dismiss OL Applications,Per 850313 Order,Based on Current Intent to Hold CPs & Attempt to Sell Plant. Certificate of Svc Encl ML20112H0981985-03-27027 March 1985 Response to Aslab 840313 Order Re Whether ASLB Decision to Review Issues in Soils Hearing Appropriate Use of Public Resources.Concurs W/Decision to Remand OL W/Instructions to Dismiss OL Application for Failure to Pursue Soils Issue ML20106F6531985-02-0808 February 1985 Response Opposing Intervenor B Stamiris 841224 Motion for Evidentiary Hearings Re Litigation Between Applicant & Dow Chemical Co.Supporting Documentation & Certificate of Svc Encl ML20106D6631985-02-0808 February 1985 Response Opposing B Stamiris 841224 Pleading Requesting Evidentiary Hearing on Matter Raised in applicant-Dow Chemical Trial & Referral of Certain Matters to Ofc of Investigations.Certificate of Svc Encl ML20101S9111985-02-0101 February 1985 Motion for Extension of Time within Which to File Notice of Appeal of ASLB 850123 Partial Initial Decision.Certificate of Svc Encl ML20101S9421985-02-0101 February 1985 Motion for Extension Until 850306 to File Notice of Appeal of ASLB 850123 Partial Initial Decision.Granted by Aslab on 850201 ML20101F3191984-12-24024 December 1984 Request for Evidentiary Hearings on Matter Raised in CPC-Dow Trial & Referral of Certain Matters to Ofc of Investigations.Certificate of Svc Encl ML20107K8011984-11-0101 November 1984 Affidavit of Jd Selby Re Plans Concerning Facilities.Const Will Be Resumed Only If Proposed by Appropriate Governmental Agencies & Officials & If Funds from Some Other Source Become Available.Related Correspondence ML20106F5241984-10-24024 October 1984 Motion to Request ASLB to Cancel Const License & Application for OL ML20092J0241984-06-22022 June 1984 Reply to B Stamiris Second Supplemental Proposed Findings of Fact & Conclusions of Law on QA & Mgt Attitude Issues. Certificate of Svc Encl ML20092J0361984-06-22022 June 1984 Reply to NRC Further Supplemental Findings of Fact & Conclusions of Law Re QA 1991-02-26
[Table view] Category:TRANSCRIPTS
MONTHYEARML20127N7591985-06-20020 June 1985 Transcript of Commission 850620 Affirmation/Discussion & Vote in Washington,Dc Concerning Denial of 2.206 Petition for Midland plant,SECY-85-60 Concerning Pressurized Thermal Shock Rule & Shoreham Order.Pp 1-4 ML20082D9041983-11-21021 November 1983 Portions of Jl Donnell Deposition,Designated as Direct Testimony.Certificate of Svc Encl ML20090H3461983-10-15015 October 1983 Transcript of Jl Donnell 831015 Deposition in Las Vegas,Nv Re Alleged Violation of ASLB Order ML20076L6471983-07-11011 July 1983 Testimony of Ps Glass Re Cable & Conduit Installation for Underpinning Instrumentation of Auxiliary Bldg.Oversize Matrix Encl.Aperture Card Available in PDR ML20076L6361983-07-11011 July 1983 Testimony of R Black Re Events During Late Winter 1982 & Early Spring 1982 & Installation of Cable Related to Instrumentation for Underpinning Work on Auxiliary Bldg ML20073H3621983-04-13013 April 1983 Two Attachments to RA Wells Testimony,Inadvertently Omitted from Original Submittal.Certificate of Svc Encl ML20069J0621983-04-11011 April 1983 Testimony of RA Wells Re Recent Changes in Organization of QA Dept,Including Changes in Organizational Structure & Responsibility for & Direction of QC Function ML20073D7291983-04-11011 April 1983 Testimony of Ja Rutgers on Qa.Responds to Specific Items Addressed in Attachment to J Keppler 821029 QA Testimony ML20069J0731983-04-11011 April 1983 Testimony of Ja Mooney & RM Wheeler Re Alleged Violation of ASLB 820430 Order & Mar 1982 Cable Pulling Incident.Util Was Unaware NRC Required Explicit Review & Approval for Fireline Excavation & Excavation Below Deep Q-duct Bank ML20069J0761983-04-11011 April 1983 Testimony of WR Bird Re Qa.Installation of Trench Excavation Near Turbine Bldg W/Slope Layback Installed Incorrectly Due to Difficulty in Determining Ref Point for Horizontal Dimension ML20069J0861983-04-11011 April 1983 Testimony of Bh Peck.Const Completion Program Addresses All Identified NRC Concerns Resulting from Insp of Diesel Generator Bldg.Certificate of Svc Encl ML20069J0571983-04-11011 April 1983 Testimony of JW Cook Re Util Qa/Qc Plans for Plant Completion.Completed Plant Will Conform to NRC Regulatory Requirements Based on Measures Taken to Improve Project Status Assessment,Sys Const & QA Implementation ML20069J0661983-04-11011 April 1983 Testimony of Ja Mooney Re Remedial Soils Work.Discusses Events Up to & Including Major Action Announced in Util ,Implementation of Commitments & Progress Rept on Completed Underpinning Work ML20069J0821983-04-0404 April 1983 Testimony of RM Wheeler Re Qa.Discusses Util Preparations to Drill Well Hole in safety-related Dirt Using Unauthorized Technique ML20072S5881983-03-30030 March 1983 Limited Appearance Statement of Bp Garde Re Lack of Third Party Independent Review of Actual Plant Condition ML20073H4541983-03-28028 March 1983 Transcript of 830328 Deposition of AB Savage on Sinclair Contention 4 Re Steam Generator Corrosion ML20069F6201983-03-18018 March 1983 Testimony of a Savage on Contention 4 Re Corrosion & Sludging of Condenser Tubes by Pond Water.Prof Qualifications Encl ML20079N0161983-02-28028 February 1983 P 4 of Dh Evans & D Sommers 830214 Testimony Re Sinclair Contention 14 on Cooling Pond,Inadvertently Omitted. Certificate of Svc Encl ML20071A0321983-02-14014 February 1983 Proposed Transcript Corrections for Nov & Dec 1982 Hearings ML20071A0701983-02-10010 February 1983 Testimony of Dh Evans & DA Sommers Re Sinclair OL Contention 14.Bechtel Thermal Performance Study & Plant Cooling Pond Operation Study Not Improperly Influenced by Data from Substantially Different Climatic Region ML20071A0821983-02-0707 February 1983 Testimony of J Bradley Re Sinclair OL Contention 14 on Dresden Fogging & Icing Studies.Conclusions in Plant Fes Re Fog & Ice Not Inconsistent W/Dresden Cooling Pond Experience.Certificate of Svc Encl ML20028E8641983-01-24024 January 1983 Testimony of P Shunmugavel Re Structural Evaluation of Auxiliary Bldg for Seismic Shakedown Settlement & Seismic Category I Duct Banks.Auxiliary Bldg Able to Withstand Effects of Shakedown Settlement ML20070R0411983-01-24024 January 1983 Testimony of Dr Anderson,Dt Perry & Gb Slade Re Sinclair Contention 3 on Potential for Water Hammer. Certificate of Svc Encl ML20028E1471983-01-17017 January 1983 Testimony of C Hillman & T Postlewait on Sinclair Contention 4.Contention Has Faulty Premise.Administrative Procedures & Design Features of Plant Adequate to Meet B&W Specified Secondary Water Chemistry Limits.Related Correspondence ML20028E1561983-01-14014 January 1983 Testimony of Rd Woods Re Seismic Shakedown Settlement at Site.Reasonable Assurance Exists That Plant Area Including Piping & Duct Banks Will Not Suffer Excessive Settlement Due to Seismic Shutdown.Related Correspondence ML20028E1631983-01-13013 January 1983 Testimony of Bj Garrick & LS Gibson Re Analysis of Class 9 Accidents in Plant Fes.Conclusion in Fes That Risk to Public from Potential Accidents Is Small Not Invalidated by Precursor Study.W/Certificate of Svc.Related Correspondence ML20070A1931982-12-0606 December 1982 Revised Testimony of RB Peck.Surcharge Program at Diesel Generator Bldg Eliminated Potential Future Settlement Problems Due to Compressibility of Plant Fill Matl & Lack of Homogeneity ML20069L9631982-11-15015 November 1982 Testimony of W Bird & R Wheeler Providing Addl Info on Nonconformance Repts Per ASLB Request in 820707 Memorandum & Order.Procedures Outlined Provide Adequate Controls to Prevent Damage to Underground Utils.Certificate of Svc Encl ML20069L9511982-11-0808 November 1982 Testimony of Wg Corley Re Plant Concrete Wall Crack Repair Program.Rept Entitled, Effects of Cracks on Serviceability of Structures at Midland Plant, Encl ML20069L9561982-11-0303 November 1982 Testimony of RB Peck.Surcharge Program at Diesel Generator Bldg Eliminated Any Potential Future Settlement Problems Due to Compressibility of Plant Fill Matl & Due to Lack of Homogeneity ML20065Q2201982-10-25025 October 1982 Testimony of a Boos,Em Burke,Jp Gould & P Shunmugarel Re Svc Water Pump Structure.Aperture Cards Available in PDR ML20065M9171982-10-15015 October 1982 Testimony of Rd Woods Re Liquefaction of Saturated Sand During Earthquake.After Remedial Measures Taken,Plant Will Be Safe Re Liquefaction of Sands.Related Correspondence. Oversize Drawings Encl.Aperture Cards Available in PDR ML20065M9031982-10-15015 October 1982 Testimony of Wc Paris Re Permanent Dewatering Sys for Site. Sys Will Provide Acceptable Method for Removing Water from Granular Plant Fill Matl.Related Correspondence.Oversize Drawings Encl.Aperture Cards Available in PDR ML20065Q2521982-10-14014 October 1982 Testimony of Wg Corley Re Cracking in Svc Water Pump Structure ML20027C1531982-10-0808 October 1982 Testimony of Aj Hendron Re Evaluation of Seismic Shakedown Settlement of Diesel Generator Bldg in Event of Earthquake. Prof Qualifications & Supporting Documentation Encl ML20063P2991982-10-0808 October 1982 Testimony of Aj Hendron Re Evaluation of Ultimate Load Carrying Capacity of Diesel Generator Bldg Footings.Prof Qualifications,Supporting Documentation & Certificate of Svc Encl ML20027C1631982-10-0707 October 1982 Testimony of DF Lewis on Behalf of Applicant Re Underground Piping.Affidavit & Supporting Documentation Encl ML20062K1011982-08-13013 August 1982 Transcript of 820813 Meeting in Midland,Mi.Pp 8,317-8,546 ML20062K0851982-08-12012 August 1982 Transcript of 820812 Hearing in Midland,Mi.Pp 8,100-8,316 ML20140H0021982-05-20020 May 1982 Statement of C Anderson Before ACRS Subcommittee 820520-21 Meetings Re Review of Application for Ol.Statement Addresses Soil/Structure Interaction Problems.Addenda 1 & 2 Encl ML20140H0131982-05-20020 May 1982 Statement of MP Sinclair Before ACRS Subcommittee on Midland Plant 820520-21 Meetings Re Review of Application for Ol. Statement Addresses Plant Design & Qualification Deficiencies ML20040F4141982-02-0404 February 1982 Testimony of Aj Boos & Rd Hanson Re Remedial Measures for Borated Water Storage Tank.Describes Analytical Work Performed on Tank Foundations,Soil Bearing Pressure & Settlement Predications.W/Affidavits & Prof Qualifications ML20040F4511982-02-0404 February 1982 Testimony of RP Kennedy & Rd Campbell.Uneven Tank Support Resulting from Soil Settlement Has Not Damaged Borated Water Storage Tanks.Design Basis Has Not Been Violated Nor Safe Operating Life Reduced ML20049J4861982-02-0202 February 1982 Errata to Transcripts of 820202 Hearing in Midland,Mi ML20040F4841982-02-0202 February 1982 Testimony of DF Lewis,Df Landers & Jk Meisenheimer Re Underground Piping & Tanks.Seven Oversize Drawings Encl. Aperture Cards Available in Pdr.Affidavit,Certificate of Svc & Prof Qualifications Encl ML20038A9381981-11-19019 November 1981 Testimony of EM Burke,Wg Corley,Jp Gould,Te Johnson & M Sozen Re Remedial Measures for Facility Auxiliary Bldg & Feedwater Isolation Valve Pits,Vols 1 & 2.Certificate of Svc Encl ML20005C0391981-11-0505 November 1981 Proposed Corrections to Transcript of 810805 Hearing in Midland,Mi.Notice of Appearance Encl ML20009D9181981-07-23023 July 1981 Testimony Re Stability of Dikes Adjacent to Emergency Cooling Water Reservoir,Per Stamiris Contention 4.B.Prof Qualifications & Certificate of Svc Encl ML20126L8431981-06-0808 June 1981 Testimony of Ds Hood That If NRC Had Known How Util Was to Implement QA Program,Nrc Would Have Been Warranted in Not Issuing CPs for Original Application ML20126L8851981-06-0808 June 1981 Testimony of Ds Hood Re ASLB Question on Continued Const.Nrc Does Not Object to Proceeding W/Surcharging Valve Pits Adjacent to Borated Water Tanks If Acceptable Program Worked Out.Prof Qualifications & Certificate of Svc Encl 1985-06-20
[Table view] Category:DEPOSITIONS
MONTHYEARML20127N7591985-06-20020 June 1985 Transcript of Commission 850620 Affirmation/Discussion & Vote in Washington,Dc Concerning Denial of 2.206 Petition for Midland plant,SECY-85-60 Concerning Pressurized Thermal Shock Rule & Shoreham Order.Pp 1-4 ML20082D9041983-11-21021 November 1983 Portions of Jl Donnell Deposition,Designated as Direct Testimony.Certificate of Svc Encl ML20090H3461983-10-15015 October 1983 Transcript of Jl Donnell 831015 Deposition in Las Vegas,Nv Re Alleged Violation of ASLB Order ML20076L6471983-07-11011 July 1983 Testimony of Ps Glass Re Cable & Conduit Installation for Underpinning Instrumentation of Auxiliary Bldg.Oversize Matrix Encl.Aperture Card Available in PDR ML20076L6361983-07-11011 July 1983 Testimony of R Black Re Events During Late Winter 1982 & Early Spring 1982 & Installation of Cable Related to Instrumentation for Underpinning Work on Auxiliary Bldg ML20073H3621983-04-13013 April 1983 Two Attachments to RA Wells Testimony,Inadvertently Omitted from Original Submittal.Certificate of Svc Encl ML20069J0621983-04-11011 April 1983 Testimony of RA Wells Re Recent Changes in Organization of QA Dept,Including Changes in Organizational Structure & Responsibility for & Direction of QC Function ML20073D7291983-04-11011 April 1983 Testimony of Ja Rutgers on Qa.Responds to Specific Items Addressed in Attachment to J Keppler 821029 QA Testimony ML20069J0731983-04-11011 April 1983 Testimony of Ja Mooney & RM Wheeler Re Alleged Violation of ASLB 820430 Order & Mar 1982 Cable Pulling Incident.Util Was Unaware NRC Required Explicit Review & Approval for Fireline Excavation & Excavation Below Deep Q-duct Bank ML20069J0761983-04-11011 April 1983 Testimony of WR Bird Re Qa.Installation of Trench Excavation Near Turbine Bldg W/Slope Layback Installed Incorrectly Due to Difficulty in Determining Ref Point for Horizontal Dimension ML20069J0861983-04-11011 April 1983 Testimony of Bh Peck.Const Completion Program Addresses All Identified NRC Concerns Resulting from Insp of Diesel Generator Bldg.Certificate of Svc Encl ML20069J0571983-04-11011 April 1983 Testimony of JW Cook Re Util Qa/Qc Plans for Plant Completion.Completed Plant Will Conform to NRC Regulatory Requirements Based on Measures Taken to Improve Project Status Assessment,Sys Const & QA Implementation ML20069J0661983-04-11011 April 1983 Testimony of Ja Mooney Re Remedial Soils Work.Discusses Events Up to & Including Major Action Announced in Util ,Implementation of Commitments & Progress Rept on Completed Underpinning Work ML20069J0821983-04-0404 April 1983 Testimony of RM Wheeler Re Qa.Discusses Util Preparations to Drill Well Hole in safety-related Dirt Using Unauthorized Technique ML20072S5881983-03-30030 March 1983 Limited Appearance Statement of Bp Garde Re Lack of Third Party Independent Review of Actual Plant Condition ML20073H4541983-03-28028 March 1983 Transcript of 830328 Deposition of AB Savage on Sinclair Contention 4 Re Steam Generator Corrosion ML20069F6201983-03-18018 March 1983 Testimony of a Savage on Contention 4 Re Corrosion & Sludging of Condenser Tubes by Pond Water.Prof Qualifications Encl ML20079N0161983-02-28028 February 1983 P 4 of Dh Evans & D Sommers 830214 Testimony Re Sinclair Contention 14 on Cooling Pond,Inadvertently Omitted. Certificate of Svc Encl ML20071A0321983-02-14014 February 1983 Proposed Transcript Corrections for Nov & Dec 1982 Hearings ML20071A0701983-02-10010 February 1983 Testimony of Dh Evans & DA Sommers Re Sinclair OL Contention 14.Bechtel Thermal Performance Study & Plant Cooling Pond Operation Study Not Improperly Influenced by Data from Substantially Different Climatic Region ML20071A0821983-02-0707 February 1983 Testimony of J Bradley Re Sinclair OL Contention 14 on Dresden Fogging & Icing Studies.Conclusions in Plant Fes Re Fog & Ice Not Inconsistent W/Dresden Cooling Pond Experience.Certificate of Svc Encl ML20028E8641983-01-24024 January 1983 Testimony of P Shunmugavel Re Structural Evaluation of Auxiliary Bldg for Seismic Shakedown Settlement & Seismic Category I Duct Banks.Auxiliary Bldg Able to Withstand Effects of Shakedown Settlement ML20070R0411983-01-24024 January 1983 Testimony of Dr Anderson,Dt Perry & Gb Slade Re Sinclair Contention 3 on Potential for Water Hammer. Certificate of Svc Encl ML20028E1471983-01-17017 January 1983 Testimony of C Hillman & T Postlewait on Sinclair Contention 4.Contention Has Faulty Premise.Administrative Procedures & Design Features of Plant Adequate to Meet B&W Specified Secondary Water Chemistry Limits.Related Correspondence ML20028E1561983-01-14014 January 1983 Testimony of Rd Woods Re Seismic Shakedown Settlement at Site.Reasonable Assurance Exists That Plant Area Including Piping & Duct Banks Will Not Suffer Excessive Settlement Due to Seismic Shutdown.Related Correspondence ML20028E1631983-01-13013 January 1983 Testimony of Bj Garrick & LS Gibson Re Analysis of Class 9 Accidents in Plant Fes.Conclusion in Fes That Risk to Public from Potential Accidents Is Small Not Invalidated by Precursor Study.W/Certificate of Svc.Related Correspondence ML20070A1931982-12-0606 December 1982 Revised Testimony of RB Peck.Surcharge Program at Diesel Generator Bldg Eliminated Potential Future Settlement Problems Due to Compressibility of Plant Fill Matl & Lack of Homogeneity ML20069L9631982-11-15015 November 1982 Testimony of W Bird & R Wheeler Providing Addl Info on Nonconformance Repts Per ASLB Request in 820707 Memorandum & Order.Procedures Outlined Provide Adequate Controls to Prevent Damage to Underground Utils.Certificate of Svc Encl ML20069L9511982-11-0808 November 1982 Testimony of Wg Corley Re Plant Concrete Wall Crack Repair Program.Rept Entitled, Effects of Cracks on Serviceability of Structures at Midland Plant, Encl ML20069L9561982-11-0303 November 1982 Testimony of RB Peck.Surcharge Program at Diesel Generator Bldg Eliminated Any Potential Future Settlement Problems Due to Compressibility of Plant Fill Matl & Due to Lack of Homogeneity ML20065Q2201982-10-25025 October 1982 Testimony of a Boos,Em Burke,Jp Gould & P Shunmugarel Re Svc Water Pump Structure.Aperture Cards Available in PDR ML20065M9171982-10-15015 October 1982 Testimony of Rd Woods Re Liquefaction of Saturated Sand During Earthquake.After Remedial Measures Taken,Plant Will Be Safe Re Liquefaction of Sands.Related Correspondence. Oversize Drawings Encl.Aperture Cards Available in PDR ML20065M9031982-10-15015 October 1982 Testimony of Wc Paris Re Permanent Dewatering Sys for Site. Sys Will Provide Acceptable Method for Removing Water from Granular Plant Fill Matl.Related Correspondence.Oversize Drawings Encl.Aperture Cards Available in PDR ML20065Q2521982-10-14014 October 1982 Testimony of Wg Corley Re Cracking in Svc Water Pump Structure ML20027C1531982-10-0808 October 1982 Testimony of Aj Hendron Re Evaluation of Seismic Shakedown Settlement of Diesel Generator Bldg in Event of Earthquake. Prof Qualifications & Supporting Documentation Encl ML20063P2991982-10-0808 October 1982 Testimony of Aj Hendron Re Evaluation of Ultimate Load Carrying Capacity of Diesel Generator Bldg Footings.Prof Qualifications,Supporting Documentation & Certificate of Svc Encl ML20027C1631982-10-0707 October 1982 Testimony of DF Lewis on Behalf of Applicant Re Underground Piping.Affidavit & Supporting Documentation Encl ML20062K1011982-08-13013 August 1982 Transcript of 820813 Meeting in Midland,Mi.Pp 8,317-8,546 ML20062K0851982-08-12012 August 1982 Transcript of 820812 Hearing in Midland,Mi.Pp 8,100-8,316 ML20140H0021982-05-20020 May 1982 Statement of C Anderson Before ACRS Subcommittee 820520-21 Meetings Re Review of Application for Ol.Statement Addresses Soil/Structure Interaction Problems.Addenda 1 & 2 Encl ML20140H0131982-05-20020 May 1982 Statement of MP Sinclair Before ACRS Subcommittee on Midland Plant 820520-21 Meetings Re Review of Application for Ol. Statement Addresses Plant Design & Qualification Deficiencies ML20040F4141982-02-0404 February 1982 Testimony of Aj Boos & Rd Hanson Re Remedial Measures for Borated Water Storage Tank.Describes Analytical Work Performed on Tank Foundations,Soil Bearing Pressure & Settlement Predications.W/Affidavits & Prof Qualifications ML20040F4511982-02-0404 February 1982 Testimony of RP Kennedy & Rd Campbell.Uneven Tank Support Resulting from Soil Settlement Has Not Damaged Borated Water Storage Tanks.Design Basis Has Not Been Violated Nor Safe Operating Life Reduced ML20049J4861982-02-0202 February 1982 Errata to Transcripts of 820202 Hearing in Midland,Mi ML20040F4841982-02-0202 February 1982 Testimony of DF Lewis,Df Landers & Jk Meisenheimer Re Underground Piping & Tanks.Seven Oversize Drawings Encl. Aperture Cards Available in Pdr.Affidavit,Certificate of Svc & Prof Qualifications Encl ML20038A9381981-11-19019 November 1981 Testimony of EM Burke,Wg Corley,Jp Gould,Te Johnson & M Sozen Re Remedial Measures for Facility Auxiliary Bldg & Feedwater Isolation Valve Pits,Vols 1 & 2.Certificate of Svc Encl ML20005C0391981-11-0505 November 1981 Proposed Corrections to Transcript of 810805 Hearing in Midland,Mi.Notice of Appearance Encl ML20009D9181981-07-23023 July 1981 Testimony Re Stability of Dikes Adjacent to Emergency Cooling Water Reservoir,Per Stamiris Contention 4.B.Prof Qualifications & Certificate of Svc Encl ML20126L8431981-06-0808 June 1981 Testimony of Ds Hood That If NRC Had Known How Util Was to Implement QA Program,Nrc Would Have Been Warranted in Not Issuing CPs for Original Application ML20126L8851981-06-0808 June 1981 Testimony of Ds Hood Re ASLB Question on Continued Const.Nrc Does Not Object to Proceeding W/Surcharging Valve Pits Adjacent to Borated Water Tanks If Acceptable Program Worked Out.Prof Qualifications & Certificate of Svc Encl 1985-06-20
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20127N7591985-06-20020 June 1985 Transcript of Commission 850620 Affirmation/Discussion & Vote in Washington,Dc Concerning Denial of 2.206 Petition for Midland plant,SECY-85-60 Concerning Pressurized Thermal Shock Rule & Shoreham Order.Pp 1-4 ML20082D9041983-11-21021 November 1983 Portions of Jl Donnell Deposition,Designated as Direct Testimony.Certificate of Svc Encl ML20090H3461983-10-15015 October 1983 Transcript of Jl Donnell 831015 Deposition in Las Vegas,Nv Re Alleged Violation of ASLB Order ML20076L6471983-07-11011 July 1983 Testimony of Ps Glass Re Cable & Conduit Installation for Underpinning Instrumentation of Auxiliary Bldg.Oversize Matrix Encl.Aperture Card Available in PDR ML20076L6361983-07-11011 July 1983 Testimony of R Black Re Events During Late Winter 1982 & Early Spring 1982 & Installation of Cable Related to Instrumentation for Underpinning Work on Auxiliary Bldg ML20073H3621983-04-13013 April 1983 Two Attachments to RA Wells Testimony,Inadvertently Omitted from Original Submittal.Certificate of Svc Encl ML20069J0621983-04-11011 April 1983 Testimony of RA Wells Re Recent Changes in Organization of QA Dept,Including Changes in Organizational Structure & Responsibility for & Direction of QC Function ML20073D7291983-04-11011 April 1983 Testimony of Ja Rutgers on Qa.Responds to Specific Items Addressed in Attachment to J Keppler 821029 QA Testimony ML20069J0731983-04-11011 April 1983 Testimony of Ja Mooney & RM Wheeler Re Alleged Violation of ASLB 820430 Order & Mar 1982 Cable Pulling Incident.Util Was Unaware NRC Required Explicit Review & Approval for Fireline Excavation & Excavation Below Deep Q-duct Bank ML20069J0761983-04-11011 April 1983 Testimony of WR Bird Re Qa.Installation of Trench Excavation Near Turbine Bldg W/Slope Layback Installed Incorrectly Due to Difficulty in Determining Ref Point for Horizontal Dimension ML20069J0861983-04-11011 April 1983 Testimony of Bh Peck.Const Completion Program Addresses All Identified NRC Concerns Resulting from Insp of Diesel Generator Bldg.Certificate of Svc Encl ML20069J0571983-04-11011 April 1983 Testimony of JW Cook Re Util Qa/Qc Plans for Plant Completion.Completed Plant Will Conform to NRC Regulatory Requirements Based on Measures Taken to Improve Project Status Assessment,Sys Const & QA Implementation ML20069J0661983-04-11011 April 1983 Testimony of Ja Mooney Re Remedial Soils Work.Discusses Events Up to & Including Major Action Announced in Util ,Implementation of Commitments & Progress Rept on Completed Underpinning Work ML20069J0821983-04-0404 April 1983 Testimony of RM Wheeler Re Qa.Discusses Util Preparations to Drill Well Hole in safety-related Dirt Using Unauthorized Technique ML20072S5881983-03-30030 March 1983 Limited Appearance Statement of Bp Garde Re Lack of Third Party Independent Review of Actual Plant Condition ML20073H4541983-03-28028 March 1983 Transcript of 830328 Deposition of AB Savage on Sinclair Contention 4 Re Steam Generator Corrosion ML20069F6201983-03-18018 March 1983 Testimony of a Savage on Contention 4 Re Corrosion & Sludging of Condenser Tubes by Pond Water.Prof Qualifications Encl ML20079N0161983-02-28028 February 1983 P 4 of Dh Evans & D Sommers 830214 Testimony Re Sinclair Contention 14 on Cooling Pond,Inadvertently Omitted. Certificate of Svc Encl ML20071A0321983-02-14014 February 1983 Proposed Transcript Corrections for Nov & Dec 1982 Hearings ML20071A0701983-02-10010 February 1983 Testimony of Dh Evans & DA Sommers Re Sinclair OL Contention 14.Bechtel Thermal Performance Study & Plant Cooling Pond Operation Study Not Improperly Influenced by Data from Substantially Different Climatic Region ML20071A0821983-02-0707 February 1983 Testimony of J Bradley Re Sinclair OL Contention 14 on Dresden Fogging & Icing Studies.Conclusions in Plant Fes Re Fog & Ice Not Inconsistent W/Dresden Cooling Pond Experience.Certificate of Svc Encl ML20028E8641983-01-24024 January 1983 Testimony of P Shunmugavel Re Structural Evaluation of Auxiliary Bldg for Seismic Shakedown Settlement & Seismic Category I Duct Banks.Auxiliary Bldg Able to Withstand Effects of Shakedown Settlement ML20070R0411983-01-24024 January 1983 Testimony of Dr Anderson,Dt Perry & Gb Slade Re Sinclair Contention 3 on Potential for Water Hammer. Certificate of Svc Encl ML20028E1471983-01-17017 January 1983 Testimony of C Hillman & T Postlewait on Sinclair Contention 4.Contention Has Faulty Premise.Administrative Procedures & Design Features of Plant Adequate to Meet B&W Specified Secondary Water Chemistry Limits.Related Correspondence ML20028E1561983-01-14014 January 1983 Testimony of Rd Woods Re Seismic Shakedown Settlement at Site.Reasonable Assurance Exists That Plant Area Including Piping & Duct Banks Will Not Suffer Excessive Settlement Due to Seismic Shutdown.Related Correspondence ML20028E1631983-01-13013 January 1983 Testimony of Bj Garrick & LS Gibson Re Analysis of Class 9 Accidents in Plant Fes.Conclusion in Fes That Risk to Public from Potential Accidents Is Small Not Invalidated by Precursor Study.W/Certificate of Svc.Related Correspondence ML20070A1931982-12-0606 December 1982 Revised Testimony of RB Peck.Surcharge Program at Diesel Generator Bldg Eliminated Potential Future Settlement Problems Due to Compressibility of Plant Fill Matl & Lack of Homogeneity ML20069L9631982-11-15015 November 1982 Testimony of W Bird & R Wheeler Providing Addl Info on Nonconformance Repts Per ASLB Request in 820707 Memorandum & Order.Procedures Outlined Provide Adequate Controls to Prevent Damage to Underground Utils.Certificate of Svc Encl ML20069L9511982-11-0808 November 1982 Testimony of Wg Corley Re Plant Concrete Wall Crack Repair Program.Rept Entitled, Effects of Cracks on Serviceability of Structures at Midland Plant, Encl ML20069L9561982-11-0303 November 1982 Testimony of RB Peck.Surcharge Program at Diesel Generator Bldg Eliminated Any Potential Future Settlement Problems Due to Compressibility of Plant Fill Matl & Due to Lack of Homogeneity ML20065Q2201982-10-25025 October 1982 Testimony of a Boos,Em Burke,Jp Gould & P Shunmugarel Re Svc Water Pump Structure.Aperture Cards Available in PDR ML20065M9171982-10-15015 October 1982 Testimony of Rd Woods Re Liquefaction of Saturated Sand During Earthquake.After Remedial Measures Taken,Plant Will Be Safe Re Liquefaction of Sands.Related Correspondence. Oversize Drawings Encl.Aperture Cards Available in PDR ML20065M9031982-10-15015 October 1982 Testimony of Wc Paris Re Permanent Dewatering Sys for Site. Sys Will Provide Acceptable Method for Removing Water from Granular Plant Fill Matl.Related Correspondence.Oversize Drawings Encl.Aperture Cards Available in PDR ML20065Q2521982-10-14014 October 1982 Testimony of Wg Corley Re Cracking in Svc Water Pump Structure ML20027C1531982-10-0808 October 1982 Testimony of Aj Hendron Re Evaluation of Seismic Shakedown Settlement of Diesel Generator Bldg in Event of Earthquake. Prof Qualifications & Supporting Documentation Encl ML20063P2991982-10-0808 October 1982 Testimony of Aj Hendron Re Evaluation of Ultimate Load Carrying Capacity of Diesel Generator Bldg Footings.Prof Qualifications,Supporting Documentation & Certificate of Svc Encl ML20027C1631982-10-0707 October 1982 Testimony of DF Lewis on Behalf of Applicant Re Underground Piping.Affidavit & Supporting Documentation Encl ML20062K1011982-08-13013 August 1982 Transcript of 820813 Meeting in Midland,Mi.Pp 8,317-8,546 ML20062K0851982-08-12012 August 1982 Transcript of 820812 Hearing in Midland,Mi.Pp 8,100-8,316 ML20140H0021982-05-20020 May 1982 Statement of C Anderson Before ACRS Subcommittee 820520-21 Meetings Re Review of Application for Ol.Statement Addresses Soil/Structure Interaction Problems.Addenda 1 & 2 Encl ML20140H0131982-05-20020 May 1982 Statement of MP Sinclair Before ACRS Subcommittee on Midland Plant 820520-21 Meetings Re Review of Application for Ol. Statement Addresses Plant Design & Qualification Deficiencies ML20040F4141982-02-0404 February 1982 Testimony of Aj Boos & Rd Hanson Re Remedial Measures for Borated Water Storage Tank.Describes Analytical Work Performed on Tank Foundations,Soil Bearing Pressure & Settlement Predications.W/Affidavits & Prof Qualifications ML20040F4511982-02-0404 February 1982 Testimony of RP Kennedy & Rd Campbell.Uneven Tank Support Resulting from Soil Settlement Has Not Damaged Borated Water Storage Tanks.Design Basis Has Not Been Violated Nor Safe Operating Life Reduced ML20049J4861982-02-0202 February 1982 Errata to Transcripts of 820202 Hearing in Midland,Mi ML20040F4841982-02-0202 February 1982 Testimony of DF Lewis,Df Landers & Jk Meisenheimer Re Underground Piping & Tanks.Seven Oversize Drawings Encl. Aperture Cards Available in Pdr.Affidavit,Certificate of Svc & Prof Qualifications Encl ML20038A9381981-11-19019 November 1981 Testimony of EM Burke,Wg Corley,Jp Gould,Te Johnson & M Sozen Re Remedial Measures for Facility Auxiliary Bldg & Feedwater Isolation Valve Pits,Vols 1 & 2.Certificate of Svc Encl ML20005C0391981-11-0505 November 1981 Proposed Corrections to Transcript of 810805 Hearing in Midland,Mi.Notice of Appearance Encl ML20009D9181981-07-23023 July 1981 Testimony Re Stability of Dikes Adjacent to Emergency Cooling Water Reservoir,Per Stamiris Contention 4.B.Prof Qualifications & Certificate of Svc Encl ML20126L8431981-06-0808 June 1981 Testimony of Ds Hood That If NRC Had Known How Util Was to Implement QA Program,Nrc Would Have Been Warranted in Not Issuing CPs for Original Application ML20126L8851981-06-0808 June 1981 Testimony of Ds Hood Re ASLB Question on Continued Const.Nrc Does Not Object to Proceeding W/Surcharging Valve Pits Adjacent to Borated Water Tanks If Acceptable Program Worked Out.Prof Qualifications & Certificate of Svc Encl 1985-06-20
[Table view] |
Text
.
$2f UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION *83 l!PR 11 P4 :55 BEFORE THE ATOMIC SAFETY AND LICENSING'BOARDi 7g J-In the Matter of: ) Docket Nos. 50-329 OM
) 50-330 OM CONSUMERS POWER COMPANY ) Docket Nos. 50-329 OL (Midland Plant, Units 1 & 2) ) 50-330 OL TESTIMONY OF WALTER R. BIRD ON QUALITY ASSURANCE Ql. Please state your name and position.
Al. My name is Walter R. Bird. I am Manager, Midland Project Quality Assurance Department ("MPQAD"). My qualifications are set forth in a resume which was submitted with my testimony on February 14, 1983, and follows transcript page 11408.
Q2. Would you please respond to the concern raised in Mr. Keppler's October 29, 1982, testimony, Attachment B, Paragraph 9 regarding installation of a slope not in conformance with the specification requirement?
A2. We acknowledge that this matter is a valid noncompliance. Design specifications called for a trench excavation near the turbine building with a slope layback of 1 vertical to 1.5 horizontal. The slope layback in the 8304130301 830411 ~1-PDR ADDCK 05000329 PDR
o .
field was in fact approximately 1 vertical to 1 horizontal.
The discrepancy was due to difficulty in determining a reference point for the horizontal dimension. Monitoring-of the installation of the slope was the responsibility of the Onsite Geotechnical Soils Engineer.
Promptly after the NRC pointed out the discrepancy, Project Engineering prepared a Field Change Notice ("FCN")
to reflect the as built condition of the slope layback.
However, since the slope layback was completed by this time, an NCR, not an FCN, should have been issued. At this point MPQAD became involved in the, problem and issued NCR M01-4-2-109.
Project Engineering has since reviewed the as built condition of the slope layback and determined that reworking of the slope is not required. A design change has been processed to clarify the slope requirement so that it is now 1 vertical to 1-1.5 horizontal. The slope conforms to this requirement.
On November 2, 1982, training sessions were conducted to augment prior training received by the engineers. The Field Soils Organization conducted training for all of its Field Engineers in the proper use of FCRs/FCNs and the need to write nonconformance reports. The Resident Geotechnical Engineer conducted training for all Onsite Geotechnical Soil l
l Engineers and Resident Geotechnical Engineers in the 1 l
responsibilities of the Onsite Geotechnical Engineer as they relate to the Site Excavation Permit Procedure.
Closure of NCR M01-4-2-109 awaits a final response from the Field Soils Organization and QC verification that the remaining cribbing work in the area is completed. The NRC authorized the cribbing work on March 17, 1983.
Q3. Would you please respond to the question raised in Paragraph ll(a) of Attachment B to Mr. Keppler's October 29, 1982, testimony relating to maintenance of the proper mix ratio of high pressure grout?
A3. In Inspection Report 82-18, the NRC cited the calibration of crack grouting equipment as an item of noncompliance. The concern of the NRC inspector was that manual control appeared to be needed to maintain the proper mix ratio and that such control was not possible while grout was actually being applied. In a letter dated November 5, 1982, the Company responded to this concern by explaining that an approved procedure, " Guidelines for Specific Concrete Bonding Process," by Adhesive Engineering Company was used to calibrate the mixing ratio of the adhesive components for the grout. The procedure was briefly described, and the Company took the position that the
~
calibration and the actual grouting were done in conformance to requirements. Based on this additional information, i
the Staff agreed that this concern was not a noncompliance with regulatory requirements.
It therefore was deleted as an item of noncompliance and made an unresolved item
, pending additional calibration tests.
On February 24, 1983, tests of the same equipment used to grout the BWST were conducted at Structural Bonding Company. The tests conclusively demonstrated ~that the pressure in both lines of the grouting gun is identical for the full range of grouting pressures. The tests also confirmed that the pumping system was in fact supplying the correct mix ratio. Manual control is necessary to maintain the pressure desired but not to maintain the proper mix ratio. Review of the test results by the NRC is expected to result in closure of this item.
Q4. Would you please explain how trend analysis relates to hanger welding data and the ability to determine specific problems with hangers? (Mr. Keppler's October 29, 1982, testimony, Attachment B, Paragraph 16).
A4. The trending system presently in place at Midland is a systematic means to sum the numbers of ~ problems for specific 4
categories of commodities 'and probable causes.
The program provides for the recording of numbers of nonconformances reported in a given time frame against the specific trend categories and the display of these results both in absolute numbers and against the four-month trailing average of previous data. In this way, the current trend analysis program is valuable in identifying a change in the quantity of defects or deficiencies.
The program was not intended or formulated to provide information concerning the type and degree of nonconforming conditions for a specific commodity or to uncover specific problems which occur in relatively small numbers. The current program does not contain provisions to collect and normalize inspection results against the total popula-tion of characteristics or items inspected.
When the trending analysis reveals that a rise in the number of deliciencies for a given category exceeds certain levels, MPQAD takes action. Th'e action taken is either for MPQAD to review the input or for MPQAD to cause the responsible organization to determine the root cause and take corrective action. Individuals in MPQAD responsible for trending review documents such as nonconformance reports and quality action requests in order to make judgments as to problems and trends other than those declared to be " trends" on the basis of charted data.
/
1 l
l Based on the trend report for May 1982 for field welding, MPQAD issuea 1AR-175 on May 17, 1982. Construction was charged with determining the root cause of the problem and taking corrective action. QAR-175 was closed out on August 24, 1982.
Q5. How will changes which are currently being made to the trending program improve information concerning nonconforming conditions?
AS. MPQA trend analysis Phase 4 is now under development although it has not yet been approved by management. It was determined that the trend program required an approach that was more statistically based to be responsive to the concern the NRC expressed, the INPO evaluation, and the biennial audit. It is being designed to detect changes in the rates of nonconformances in selected performance areas and for se-lected nonconforming categories.
The Phase 4 trend analysis is considering having the total number of attributes inspected and the number of attributes rejected recorded for each inspection as defined by the scope of an individual quality control inspection plan. The data from the individual inspections would be processed to generate weekly trend graphs. The trend graphs would display a percent defective curve. Control limits would be calculated on the basis of initial and ongoing data collection once the revised PQCIs are 6-1
implemented. The data collection must be at a volume level which is statistically significant in order to calculate control limits. Any two consecutive weeks' data that exceed the upper contro.1 limit would zequire investigation for the indication of deteriorating quality trend and appropriate corrective action, if any, will be taken. A monthly report would also be published and ;
distributed to management and affected organizations.
The Phase 4 program as presently conceived will serve as a real time indicator of problem areas requiring immediate attention and will provide useful information for determination of root cause and corrective action.
Q6. What is the purpose of MPQP-l?
A6. At the initiation for the underpinning work, there were two contractors who were identified as being technically excellent and experienced in the type of work that had to be undertaken. These particular contractors did not have a Nuclear Quality Assurance Program. MPQP-1 was written to describe the application of Bechtel and Consumers QA programs on the subcontractors. The Quality Plan provides a detailed written description of the accomplishment of quality related activities specific to the soils remedial work, specifically the underpinning work by the two underpinning subcontractors.
l 1
l Q7. What is the purpose of MPQP-2?
A7. This Quality Plan was written to document Consumers' commitment that all activities for the remedial soils work and all work within the area covered by the C-45 drawing are covered by the existing Consumers Power Company and Bechtel Power Corporation Topical Reports. The scope of the Quality Plan is written to be consistent with the activities listed in the Licensing Board's April 30, 1982, Order. The Plan provides for some specific MPQAD responsibilities for reviewing and assuring that design documents contain appropriate quality requirements and that work activities include adequate inspection plans for the QA coverage of the work. There is also a commitment to have the excavation procedure in place, to have specific Quality Plans developed for providing quality program coverage of the underpinning subcontractors who do not have their own Nuclear Quality Assurance programs, and to have prior concurrence of Region III before any soils work is excluded from QA program coverage.
Q8. What are the controls on these documents?
A8. Quality plans are treated as controlled documents. For the project, approval is required of the Manager of MPQAD, the Bechtel Assistant Project Manager for soils work, and the Executive Manager of the Midland Project Office for Remedial Soils. In addition, the original issue of MPQP-2 l r __ _
. 1 l
1 I
and revision 3 of MPQP-1 were coordinated with the NRC prior !
to issue. It was determined that NRC desired formal approval of the Quality Plans prior to implementation. They were submitted to the NRC by letter on August 9, 1982, and NRC approved them on September 16, 1982. Revisions to these plans now must receive NRC approval under the "NRC and CPCo work authorization procedure," subject to the exception discussed in answer 11 of the March 25, 1983 prepared testimony of Messrs. Gilray, Landsman, and Shafer.
e 4
l l .