Issue date | Title | Topic | |
---|---|---|---|
ML20217F150 | 12 October 1999 | Special Rept:On 990929,south Plant Vent (SPV) Range Ng Monitor Was Inoperable.Monitor Was Inoperable for More than 72 H.Caused by Electronic Noise Generated from Noise Suppression Circuit.Replaced Circuit | Grab sample |
ML20217B540 | 6 October 1999 | Safety Evaluation Supporting Amend 193 to License DPR-40 | |
ML20217G746 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Cooper Nuclear Station | |
LIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With | |
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
ML20212K978 | 30 September 1999 | Safety Evaluation Accepting USI A-46 Implementation Program | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Earthquake |
ML18107A557 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr | Safe Shutdown Temporary Modification Coast down |
ML18107A558 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr | Safe Shutdown Temporary Modification |
ML20217N653 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Hope Creek Generating Station,Unit 1.With | Safe Shutdown Temporary Modification |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20217M021 | 20 September 1999 | Part 21 Rept Re Possible Deviation of NLI Dc Power Supply Over Voltage Protection Circuit Actuation.Caused by Electrical Circuit Conditions Unique to Remote Engine Panel. Travelled to Hope Creek to Witness Startup Sequence of DG | |
ML20211N553 | 8 September 1999 | Safety Evaluation Supporting Amend 121 to License NPF-57 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML20211J932 | 2 September 1999 | Safety Evaluation Concluding That Licensee Proposed Alternatives Provide Acceptable Level of Quality & Safety. Proposed Alternatives Authorized for Remainder of Third ten- Yr ISI Interval for Fort Calhoun Station,Unit 1 | Boric Acid VT-2 Incorporated by reference |
LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With | |
ML20212C500 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station | |
ML18107A530 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr | Safe Shutdown Temporary Modification |
ML18107A531 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 | Safe Shutdown Temporary Modification Coast down |
ML18107A503 | 26 August 1999 | LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 Ltr | Time of Discovery Offsite Dose Calculation Manual |
ML20216E643 | 26 August 1999 | Rev 19 to TDB-VI, COLR for FCS Unit 1 | Boric Acid Shutdown Margin |
ML20211D649 | 25 August 1999 | Part 21 Rept Re Nonconformance within LCR-25 safety-related Lead Acid Battery Cells Manufactured by C&D.Analysis of Cells Completed.Analysis of Positive Grid Matl Shows Nonconforming Levels of Calcium within Positive Grid Alloy | |
ML20211B378 | 13 August 1999 | Special Rept 99-002:on 990730,NPV Radiation Monitoring Sys Was Declared Inoperable.Caused by Voltage Induced in Detector Output by Power Cable to Low Range Sample Pump. Separated Cables & Secured in Place to Prevent Recurrence | |
ML18107A520 | 12 August 1999 | Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#9) Second Interval,Second Period, First Outage (96RF). | VT-2 |
ML20210U472 | 31 July 1999 | Monthly Operating Rept for July 1999 for Hope Creek Generating Station,Unit 1.With | Safe Shutdown Temporary Modification |
ML18107A481 | 31 July 1999 | Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr | Safe Shutdown Temporary Modification |
ML18107A482 | 31 July 1999 | Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr | Safe Shutdown Temporary Modification |
ML20210R196 | 31 July 1999 | Monthly Operating Rept for July 1999 for Fcs,Unit 1 | |
ML20210R038 | 31 July 1999 | Monthly Operating Rept for July 1999 for Cooper Nuclear Station | |
ML20210J292 | 29 July 1999 | Special Rept:On 990406,OG TS & Associated Charcoal Absorbers Were Removed from Svc.Caused by Scheduled Maint on Hpci. Evaluation of Offsite Effluent Release Dose Effects Was Performed to Ensure Plant Remained in Compliance | |
ML18107A469 | 28 July 1999 | LER 99-008-00:on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With 990728 Ltr | Hot Short Safe Shutdown Fire Barrier Fire Protection Program Hourly Fire Watch |
ML20210G218 | 27 July 1999 | Safety Evaluation Supporting Amend 192 to License DPR-40 | Boric Acid Shutdown Margin |
ML20216D833 | 26 July 1999 | Safety Evaluation Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given HCGS Design,Operation & History | Safe Shutdown High winds Tornado Missile Safe Shutdown Earthquake Earthquake |
ML20216D872 | 26 July 1999 | Review of Submittal in Response to USNRC GL 88-20,Suppl 4: 'Ipeees,' Fire Submittal Screening Review Technical Evaluation Rept:Hope Creek Rev 1:980518 | Hot Short Safe Shutdown Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Fire Protection Program Fire Watch |
ML20210F333 | 22 July 1999 | Safety Evaluation Granting Relief Requests RR-B1,RR-C1,RR-D1 & RR-B3.Finds That Proposed Alternative for RR-B3 Provides Acceptable Level of Quality & Safety & Authorizes Alternative Pursuant to 10CFR50.55a(a)(3)(i) | Fire Barrier Incorporated by reference Pressure Boundary Leakage |
ML20210D995 | 22 July 1999 | Safety Evaluation Supporting Amend 191 to License DPR-40 | Fuel cladding |
ML20216E636 | 21 July 1999 | Rev 18 to TDB-VI, COLR for FCS Unit 1 | Shutdown Margin |
ML20209H828 | 15 July 1999 | Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station | Power-Operated Valves Backfit |
ML20211A998 | 12 July 1999 | Draft,Probabilistic Safety Assessment, Risk Info Matrix, Risk Ranking of Systems by Importance Measure | |
ML18107A444 | 6 July 1999 | LER 99-007-00:on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With 990706 Ltr | Missed surveillance |
ML18107A421 | 2 July 1999 | LER 99-005-00:on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With 990702 Ltr | Enforcement Discretion Large early release frequency |
ML18107A433 | 1 July 1999 | LER 99-002-01:on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With 990701 Ltr | Time of Discovery |
ML18107A432 | 1 July 1999 | LER 99-006-01:on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With 990701 Ltr | Time of Discovery |
ML18107A521 | 1 July 1999 | Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#10) Second Interval,Second Period,Second Outage (99RF). | Hydrostatic VT-2 |
ML20209E106 | 30 June 1999 | Monthly Operating Rept for June 1999 for Cns.With | |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
ML20210C473 | 30 June 1999 | Monthly Operating Rept for June 1999 for Hope Creek Generating Station,Unit 1.With | Safe Shutdown Temporary Modification |
ML20216D890 | 30 June 1999 | IPEEEs Technical Evaluation Rept High Winds,Floods & Other External Events | High winds Tornado Generated Missile |
ML18107A435 | 30 June 1999 | Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr | Safe Shutdown Temporary Modification |
ML18107A434 | 30 June 1999 | Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr | Safe Shutdown Temporary Modification |
LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With | 30 June 1999 | Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With | |
ML20210R208 | 30 June 1999 | Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 |