ML17355A28030 September 1998Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point.Fire Barrier
Coatings
ML17354B17331 January 1998Final TER on 'Submittal-Only' Review of IPEEE at Turkey Point Nuclear Plant Units 3 & 4.Hot Short
Safe Shutdown
Boric Acid
High winds
Ultimate heat sink
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Tornado-Generated Missile
Significance Determination Process
Design basis earthquake
TORMIS
Earthquake
Fire Protection Program
Fire Watch
ML17353A40330 September 1995Evaluation of Turkey Point Nuclear Plant Units 3 & 4 Offsite Dose Calculation Manual,Rev 4.Boric Acid
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML20080K11028 February 1995Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan:Florida Power & Light Co,Turkey Point Nuclear Power Plant,Units 3 & 4Boric Acid
High Radiation Area
Hydrostatic
Nondestructive Examination
VT-2
Dissimilar Metal Weld
ML20076K98430 September 1994Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Turkey Point-3/4, Technical Evaluation Rept
ML20076F27030 September 1994Fpl,Pump & Valve Inservice Testing Program,Rev 0,Third Ten-Year IntervalSafe Shutdown
Boric Acid
Stroke time
Cold shutdown justification
Scaffolding
ML20114A60031 August 1992TER Pump & Valve Inservice Testing Program Turkey Point, Units 3 & 4Boric Acid
Stroke time
Scaffolding
ML17349A21330 April 1992Auxiliary Feedwater System RISK-BASED Inspection Guide for the Turkey Point Nuclear Power PlantProbabilistic Risk Assessment
ML17349A41831 December 1991Step 2 Review,Turkey Point Units 3 & 4 IPE Submittal, Human Reliability AnalysisProbabilistic Risk Assessment
ML17349A41721 December 1991IPE Back-End Audit,Task 3,Technical Evaluation Rept,December 21,1991,Rev 1Probabilistic Risk Assessment
ML17349A41521 December 1991Ipe:Front End Audit.Internal Flooding
Probabilistic Risk Assessment
ML17348B12431 July 1991Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Turkey Point,Units 3 & 4.Stroke time
Power Operated Valves
Grace period
ML20043F63311 June 1990Technical Evaluation Rept Turkey Point Units 2 & 3 Station Blackout Evaluation, Final Rept
ML20058K10330 May 1989Conformance to Generic Ltr 83-28,Item 2.2-1 - Equipment Classification for All Other Safety-Related Components, Turkey Point-3/-4, Technical Evaluation ReptSafe Shutdown
ML17347A59331 July 1987Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept
ML17342A75430 June 1987Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Turkey Point 3 & 4, Final Rept
ML17342A76430 June 1987TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Turkey Point Units 3 & 4, Informal Technical Evaluation ReptLoop seal
Stroke time
Safe Shutdown Earthquake
Earthquake
ML20211N5039 January 1987Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept
ML20198A2484 April 1986Metallurgical Failure Analysis of Check Valve Guide Pin
ML20138J94930 September 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1
ML17342A35730 September 1985Addendum a to First Interval Inservice Insp Program for Turkey Point Units 3 & 4, Technical Evaluation ReptHydrostatic
ML17342A33430 September 1985Inservice Insp Program,Second Interval Technical Evaluation Rept.Boric Acid
Hydrostatic
Nondestructive Examination
VT-2
Exemption Request
Dissimilar Metal Weld
ML17342A16019 July 1985Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic...), Item 1.2., `Post-Trip Review:Data & Info Capability,' for Turkey Point Plant..., Technical Evaluation Rept
ML20244D38710 July 1985Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant.
ML20244D43830 June 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities
ML20111B1665 December 1984Masonry Wall Design, Technical Evaluation ReptTornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML20080E07113 January 1984Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation ReptBackfit
ML20080Q51310 October 1983Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML20079Q68714 March 1983Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept
ML17354A25614 February 1983Post-Fire Safe Shutdown Capability, Technical Evaluation ReptSafe Shutdown
Boric Acid
Fire Barrier
Coatings
Exemption Request
Backfit
ML20072B1206 January 1983Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Draft Technical Evaluation Rept.Request for Addl Info EnclSafe Shutdown
Control of Heavy Loads
ML20076C36929 November 1982ECCS Repts (F-47):TMI Action Plan Requirements,Turkey Point,Units 3 & 4, Technical Evaluation Rept
ML17341B47128 October 1982Proposed Design Mod & Tech Spec Changes on Grid Voltage Degradation for Turkey Point Nuclear Generating Plant, Units 3 & 4, Technical Evaluation Rept
ML20069G58630 September 1982Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Turkey Point Unit 4, Vols 1 & 2,technical Evaluation Rept
ML17345B23917 September 1982Seismic Qualification of Auxiliary Feedwater Sys,Turkey Point Nuclear Plant,Units 3 & 4, Technical Evaluation ReptBackfit
ML20023A48910 September 1982Inservice Insp Program, Technical Evaluation Rept
ML17341B46631 August 1982Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Turkey Point,Units 3 & 4, Technical Evaluation ReptFuel cladding
ML20071L7088 August 1982Adequacy of Station Electric Distribution Sys Voltages for Turkey Point Nuclear Generating Plant Units 3 & 4, Technical Evaluation ReptOffsite Circuit
ML17341B40018 June 1982Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Turkey Point Units 3 & 4, Technical Evaluation Rept
ML20052F68428 February 1982Tech Specs for Redundant Decay Heat Removal Capability, Turkey Point,Units 3 & 4, Preliminary Rept for Feb 1982
ML17341A91831 January 1982Tech Specs for Insp of Steam Generators,Turkey Point Units 3 & 4, Technical Evaluation Rept
ML17341A82929 December 1981Control of Heavy Loads, Draft Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML20038D13411 December 1981Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment.
ML20039A16911 December 1981Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment.
ML17341A2085 June 1981Containment Leakage Rate Testing,Turkey Point Units 3 & 4, Technical Evaluation ReptExemption Request
ML20003C25831 January 1981Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3.
ML20003C26131 January 1981Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Indian Point 3 Nuclear Power Plant.
ML17340A76231 January 1981Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Turkey Point Nuclear Power Station,Units 3 & 4.
ML19336A40730 September 1980In-Plant Source Term Measurements at Turkey Point Station Units 3 & 4.
ML17339B11931 May 1980Proposed Amend to Facility OLs DPR-31 & DPR-41,Delta T Vs Reactor Power Shift Check,Turkey Point Units 3 & 4, Informal Rept