Issue date | Title | Topic | |
---|---|---|---|
ML17355A280 | 30 September 1998 | Rev 1,Ltr Rept, Technical Evaluation of Florida Power & Light Fire Barrier Ampacity Derating Assessment for St.Lucie & Turkey Point. | Fire Barrier Coatings |
ML17354B173 | 31 January 1998 | Final TER on 'Submittal-Only' Review of IPEEE at Turkey Point Nuclear Plant Units 3 & 4. | Hot Short Safe Shutdown Boric Acid High winds Ultimate heat sink Fire Barrier Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Tornado-Generated Missile Significance Determination Process Design basis earthquake TORMIS Earthquake Fire Protection Program Fire Watch |
ML17353A403 | 30 September 1995 | Evaluation of Turkey Point Nuclear Plant Units 3 & 4 Offsite Dose Calculation Manual,Rev 4. | Boric Acid Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
ML20080K110 | 28 February 1995 | Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan:Florida Power & Light Co,Turkey Point Nuclear Power Plant,Units 3 & 4 | Boric Acid High Radiation Area Hydrostatic Nondestructive Examination VT-2 Dissimilar Metal Weld |
ML20076K984 | 30 September 1994 | Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Turkey Point-3/4, Technical Evaluation Rept | |
ML20076F270 | 30 September 1994 | Fpl,Pump & Valve Inservice Testing Program,Rev 0,Third Ten-Year Interval | Safe Shutdown Boric Acid Stroke time Cold shutdown justification Scaffolding |
ML20114A600 | 31 August 1992 | TER Pump & Valve Inservice Testing Program Turkey Point, Units 3 & 4 | Boric Acid Stroke time Scaffolding |
ML17349A213 | 30 April 1992 | Auxiliary Feedwater System RISK-BASED Inspection Guide for the Turkey Point Nuclear Power Plant | Probabilistic Risk Assessment |
ML17349A418 | 31 December 1991 | Step 2 Review,Turkey Point Units 3 & 4 IPE Submittal, Human Reliability Analysis | Probabilistic Risk Assessment |
ML17349A417 | 21 December 1991 | IPE Back-End Audit,Task 3,Technical Evaluation Rept,December 21,1991,Rev 1 | Probabilistic Risk Assessment |
ML17349A415 | 21 December 1991 | Ipe:Front End Audit. | Internal Flooding Probabilistic Risk Assessment |
ML17348B124 | 31 July 1991 | Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Turkey Point,Units 3 & 4. | Stroke time Power Operated Valves Grace period |
ML20043F633 | 11 June 1990 | Technical Evaluation Rept Turkey Point Units 2 & 3 Station Blackout Evaluation, Final Rept | |
ML20058K103 | 30 May 1989 | Conformance to Generic Ltr 83-28,Item 2.2-1 - Equipment Classification for All Other Safety-Related Components, Turkey Point-3/-4, Technical Evaluation Rept | Safe Shutdown |
ML17347A593 | 31 July 1987 | Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept | |
ML17342A754 | 30 June 1987 | Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Turkey Point 3 & 4, Final Rept | |
ML17342A764 | 30 June 1987 | TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Turkey Point Units 3 & 4, Informal Technical Evaluation Rept | Loop seal Stroke time Safe Shutdown Earthquake Earthquake |
ML20211N503 | 9 January 1987 | Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,HB Robinson Steam Electric Plant,Unit 2, Salem Generating Station Units 1 & 2,Shearon Harris Nuclear Power Plant Unit 1..., Technical Evaluation Rept | |
ML20198A248 | 4 April 1986 | Metallurgical Failure Analysis of Check Valve Guide Pin | |
ML20138J949 | 30 September 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 | |
ML17342A357 | 30 September 1985 | Addendum a to First Interval Inservice Insp Program for Turkey Point Units 3 & 4, Technical Evaluation Rept | Hydrostatic |
ML17342A334 | 30 September 1985 | Inservice Insp Program,Second Interval Technical Evaluation Rept. | Boric Acid Hydrostatic Nondestructive Examination VT-2 Exemption Request Dissimilar Metal Weld |
ML17342A160 | 19 July 1985 | Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic...), Item 1.2., `Post-Trip Review:Data & Info Capability,' for Turkey Point Plant..., Technical Evaluation Rept | |
ML20244D387 | 10 July 1985 | Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. | |
ML20244D438 | 30 June 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities | |
ML20111B166 | 5 December 1984 | Masonry Wall Design, Technical Evaluation Rept | Tornado Missile Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20080E071 | 13 January 1984 | Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation Rept | Backfit |
ML20080Q513 | 10 October 1983 | Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20079Q687 | 14 March 1983 | Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept | |
ML17354A256 | 14 February 1983 | Post-Fire Safe Shutdown Capability, Technical Evaluation Rept | Safe Shutdown Boric Acid Fire Barrier Coatings Exemption Request Backfit |
ML20072B120 | 6 January 1983 | Control of Heavy Loads (C-10),Turkey Point Units 3 & 4, Draft Technical Evaluation Rept.Request for Addl Info Encl | Safe Shutdown Control of Heavy Loads |
ML20076C369 | 29 November 1982 | ECCS Repts (F-47):TMI Action Plan Requirements,Turkey Point,Units 3 & 4, Technical Evaluation Rept | |
ML17341B471 | 28 October 1982 | Proposed Design Mod & Tech Spec Changes on Grid Voltage Degradation for Turkey Point Nuclear Generating Plant, Units 3 & 4, Technical Evaluation Rept | |
ML20069G586 | 30 September 1982 | Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Turkey Point Unit 4, Vols 1 & 2,technical Evaluation Rept | |
ML17345B239 | 17 September 1982 | Seismic Qualification of Auxiliary Feedwater Sys,Turkey Point Nuclear Plant,Units 3 & 4, Technical Evaluation Rept | Backfit |
ML20023A489 | 10 September 1982 | Inservice Insp Program, Technical Evaluation Rept | |
ML17341B466 | 31 August 1982 | Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Turkey Point,Units 3 & 4, Technical Evaluation Rept | Fuel cladding |
ML20071L708 | 8 August 1982 | Adequacy of Station Electric Distribution Sys Voltages for Turkey Point Nuclear Generating Plant Units 3 & 4, Technical Evaluation Rept | Offsite Circuit |
ML17341B400 | 18 June 1982 | Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Turkey Point Units 3 & 4, Technical Evaluation Rept | |
ML20052F684 | 28 February 1982 | Tech Specs for Redundant Decay Heat Removal Capability, Turkey Point,Units 3 & 4, Preliminary Rept for Feb 1982 | |
ML17341A918 | 31 January 1982 | Tech Specs for Insp of Steam Generators,Turkey Point Units 3 & 4, Technical Evaluation Rept | |
ML17341A829 | 29 December 1981 | Control of Heavy Loads, Draft Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20038D134 | 11 December 1981 | Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. | |
ML20039A169 | 11 December 1981 | Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. | |
ML17341A208 | 5 June 1981 | Containment Leakage Rate Testing,Turkey Point Units 3 & 4, Technical Evaluation Rept | Exemption Request |
ML20003C258 | 31 January 1981 | Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Crystal River Nuclear Power Plant,Unit 3. | |
ML20003C261 | 31 January 1981 | Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Indian Point 3 Nuclear Power Plant. | |
ML17340A762 | 31 January 1981 | Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Turkey Point Nuclear Power Station,Units 3 & 4. | |
ML19336A407 | 30 September 1980 | In-Plant Source Term Measurements at Turkey Point Station Units 3 & 4. | |
ML17339B119 | 31 May 1980 | Proposed Amend to Facility OLs DPR-31 & DPR-41,Delta T Vs Reactor Power Shift Check,Turkey Point Units 3 & 4, Informal Rept |