Issue date | Title | Topic | |
---|---|---|---|
ML20199G860 | 10 April 1997 | Rev 0 to Technical Evaluation of Oyster Creek Nuclear Generating Station Analysis of Cable Ampacity Limits | Fire Barrier |
ML20246B815 | 30 April 1989 | Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept | |
ML20205L009 | 31 July 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1-Equipment Classification for All Other Safety-Related Components: Oyster Creek, Technical Evaluation Rept | |
ML20238D021 | 31 July 1987 | Conformance to Reg Guide 1.97:Oyster Creek, Interim Technical Evaluation Rept | Squib |
ML20215L748 | 30 April 1987 | Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety Related Components: Oyster Creek, Final Informal Rept | |
ML20214R384 | 31 March 1987 | Followup SEP Evaluation of Part of Remaining Open Items for Oyster Creek Nuclear Power Plant | Safe Shutdown Earthquake Operating Basis Earthquake |
ML20212C072 | 4 August 1986 | Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Oyster Creek Plant, Supplementary Technical Evaluation Rept | |
ML20211N875 | 30 June 1986 | Draft Conformance to Reg Guide 1.97,Oyster Creek Nuclear Generating Station, Technical Evaluation Rept | Squib Fuel cladding |
ML20210C307 | 19 March 1986 | Final Supplementary Rept,Review of Licensee Responses to SEP Topic III-7.B,Design Codes,Design Criteria & Loading Combinations,Oyster Creek | Tornado Missile |
ML20136G479 | 4 November 1985 | Masonary Wall Design, Technical Evaluation Rept | Fire Barrier Tornado Missile Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20138L717 | 10 July 1985 | Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions...Atws Events),Item 1.2, 'Post-Trip Review:Data & Info Capabilities' for Oyster Creek Nuclear Power Plant, Technical Evaluation Rept | |
ML20151K896 | 20 May 1985 | Evaluation of Dcrdr Summary Rept for Oyster Creek Nuclear Generating Station, Supplemental Technical Evaluation Rept | |
ML20115A417 | 11 January 1985 | Evaluation of Isolation Condenser Cracks at Oyster Creek Unit 1 | Hydrostatic |
ML20140C999 | 31 October 1984 | Review of Wind & Tornado Loading Responses,Oyster Creek Nuclear Generating Station, Technical Evaluation Rept | Safe Shutdown Tornado Missile Operating Basis Earthquake Earthquake |
ML20094L155 | 20 July 1984 | Evaluation of Detailed Control Room Design Review Summary Rept for Oyster Creek Nuclear Generating Station, Final Technical Rept | |
ML20093C778 | 5 July 1984 | Evaluation of Spent Fuel Racks Structural Analysis,Oyster Creek Nuclear Generating Station, Technical Evaluation Rept | Safe Shutdown Earthquake Hydrostatic Finite Element Analysis Earthquake |
ML20082C088 | 31 October 1983 | Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station.Final Report: September 1,1976 - December 31,1982 | Veliger |
ML20083J323 | 30 September 1983 | Technical Evaluation of Oyster Creek Plant Unique Analysis Repts | |
ML20092N650 | 31 August 1983 | Technical Evaluation of Integrity of Oyster Creek Reactor Coolant Boundary Piping Sys | Weld Overlay Operating Basis Earthquake Nondestructive Examination Pressure Boundary Leakage Pressure boundary leak Dissimilar Metal Weld |
ML20080E264 | 30 August 1983 | Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors,Oyster Creek Nuclear Generating Station, Technical Evaluation Rept | Safe Shutdown Earthquake Operating Basis Earthquake Finite Element Analysis |
ML20079Q712 | 10 June 1983 | Control of Heavy Loads (C-10),JCP&L Oyster Creek Nuclear Power Plant, Technical Evaluation Rept | Safe Shutdown Nondestructive Examination Control of Heavy Loads |
ML20076J403 | 6 April 1983 | RCS Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept | |
ML20076C423 | 27 January 1983 | ECCS Repts (F-47) TMI Action Plan Requirements,Jcp&L, Oyster Creek Nuclear Generating Station, Technical Evaluation Rept | |
ML20070L731 | 31 December 1982 | Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station.Docket No. 50-219.(General Public Utilities) | |
ML20126E994 | 7 December 1982 | Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 | |
ML20070J331 | 30 November 1982 | Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station.Progress Report,March - May 1982 | Veliger |
ML20071N260 | 30 September 1982 | Inservice Insp Program, Technical Evaluation Rept | High Radiation Area Weld Overlay Hydrostatic Incorporated by reference Dissimilar Metal Weld |
ML20027A906 | 31 August 1982 | Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Oyster Creek Nuclear Generating Station, Technical Evaluation Rept | Fuel cladding Power change |
ML20065B850 | 31 August 1982 | Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station.Progress Report,December 1981-Februaury 1982 | |
ML20140B765 | 31 July 1982 | Review of Operating Experience History of Oyster Creek Through 1981 for NRC SEP, Final Rept | |
ML20027D226 | 31 July 1982 | Restart of Core Spray & Low Pressure Coolant Injection Sys, NUREG-0737,Item II.K.3.21,Oyster Creek Nuclear Generating Station. | |
ML20058B117 | 30 June 1982 | Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station.Progress Report,September-November 1981 | |
ML20054L496 | 9 June 1982 | Hydrological Considerations (SEP,II-3.A,B,B.1,3.C) Jcp&L, Oyster Creek Nuclear Power Plant, Revised Technical Evaluation Rept | Safe Shutdown Ultimate heat sink Hydrostatic Earthquake |
ML20054E418 | 8 June 1982 | Wind & Tornado Loadings (SEP III-2), Technical Evaluation Rept | Safe Shutdown |
ML20063G777 | 31 May 1982 | SEP Structural Review of Oyster Creek Nuclear Power Plant Drywell Containment Structure Under Combined Loads | Safe Shutdown Earthquake Finite Element Analysis Earthquake |
ML20062A488 | 30 April 1982 | Safety Evaluation Rept,Pump & Valve Inservice Testing Program,Oyster Creek Nuclear Generating Station, Interim Rept | Stroke time Scram Discharge Volume Excess Flow Check Valve Exemption Request Power-Operated Valves |
ML20052H436 | 30 April 1982 | Restart of Core Spray & Low Pressure Coolant Injection Sys, NUREG-0737,Item II.K.3.21,Oyster Creek Nuclear Generating Station. | |
ML20052B581 | 28 April 1982 | Design Codes,Design Criteria, & Loading Combinations (SEP III-7.B) Jersey Central Power & Light Co,Oyster Creek Nuclear Generating Station, Technical Evaluation Rept | |
ML20053D214 | 27 April 1982 | Control of Heavy Loads, Draft Technical Evaluation Rept | Safe Shutdown Nondestructive Examination Control of Heavy Loads |
ML20052D485 | 31 March 1982 | Draft SEP Structural Review of Oyster Creek Nuclear Power Plant Drywell Containment Structure Under Combined Loads. | Safe Shutdown Earthquake Finite Element Analysis Earthquake |
ML20049H969 | 18 February 1982 | Comparison of Plant & Model Radiological Effluent Tech Specs,Gpu Nuclear Corp, Draft Radiological Effluent Tech Spec Implementation | |
ML20064L071 | 27 January 1982 | Technical Evaluation Rept for BWR Scram Discharge Vol Long-Term Mods Oyster Creek Nuclear Generating Station | Shutdown Margin Scram Discharge Volume |
ML19348A054 | 31 August 1981 | Degraded Grid Protection for Class IE Power Sys,Oyster Creek Nuclear Power Station,Unit 1. | |
ML20010D804 | 31 July 1981 | Preliminary Adequacy of Station Electric Distribution Sys Voltages,Oyster Creek Nuclear Power Station, Technical Evaluation Rept | |
ML20009E060 | 17 July 1981 | Changes Report Number to NUREG/CR-1939,Volume 1, Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station | |
ML20009F165 | 30 June 1981 | Degraded Grid Protection for Class IE Power Sys,Oyster Creek Nuclear Station Unit 1, Technical Evaluation Rept | |
ML20010B391 | 10 June 1981 | Draft Technical Evaluation:Sep Topic VI-4, Electrical, Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation. | Reactor Vessel Water Level |
ML20010A017 | 31 May 1981 | Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint for Oyster Creek Nuclear Power Plant. Setpoint Requirements Have Been Met | |
ML20049J187 | 21 May 1981 | Containment Leakage Rate Testing, Technical Evaluation Rept | |
ML20008F766 | 30 April 1981 | Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station | Veliger |