Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20199G86010 April 1997Rev 0 to Technical Evaluation of Oyster Creek Nuclear Generating Station Analysis of Cable Ampacity LimitsFire Barrier
ML20246B81530 April 1989Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept
ML20205L00931 July 1988Conformance to Generic Ltr 83-28,Item 2.2.1-Equipment Classification for All Other Safety-Related Components: Oyster Creek, Technical Evaluation Rept
ML20238D02131 July 1987Conformance to Reg Guide 1.97:Oyster Creek, Interim Technical Evaluation ReptSquib
ML20215L74830 April 1987Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety Related Components: Oyster Creek, Final Informal Rept
ML20214R38431 March 1987Followup SEP Evaluation of Part of Remaining Open Items for Oyster Creek Nuclear Power PlantSafe Shutdown Earthquake
Operating Basis Earthquake
ML20212C0724 August 1986Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Oyster Creek Plant, Supplementary Technical Evaluation Rept
ML20211N87530 June 1986Draft Conformance to Reg Guide 1.97,Oyster Creek Nuclear Generating Station, Technical Evaluation ReptSquib
Fuel cladding
ML20210C30719 March 1986Final Supplementary Rept,Review of Licensee Responses to SEP Topic III-7.B,Design Codes,Design Criteria & Loading Combinations,Oyster CreekTornado Missile
ML20136G4794 November 1985Masonary Wall Design, Technical Evaluation ReptFire Barrier
Tornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML20138L71710 July 1985Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions...Atws Events),Item 1.2, 'Post-Trip Review:Data & Info Capabilities' for Oyster Creek Nuclear Power Plant, Technical Evaluation Rept
ML20151K89620 May 1985Evaluation of Dcrdr Summary Rept for Oyster Creek Nuclear Generating Station, Supplemental Technical Evaluation Rept
ML20115A41711 January 1985Evaluation of Isolation Condenser Cracks at Oyster Creek Unit 1Hydrostatic
ML20140C99931 October 1984Review of Wind & Tornado Loading Responses,Oyster Creek Nuclear Generating Station, Technical Evaluation ReptSafe Shutdown
Tornado Missile
Operating Basis Earthquake
Earthquake
ML20094L15520 July 1984Evaluation of Detailed Control Room Design Review Summary Rept for Oyster Creek Nuclear Generating Station, Final Technical Rept
ML20093C7785 July 1984Evaluation of Spent Fuel Racks Structural Analysis,Oyster Creek Nuclear Generating Station, Technical Evaluation ReptSafe Shutdown Earthquake
Hydrostatic
Finite Element Analysis
Earthquake
ML20082C08831 October 1983Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station.Final Report: September 1,1976 - December 31,1982Veliger
ML20083J32330 September 1983Technical Evaluation of Oyster Creek Plant Unique Analysis Repts
ML20092N65031 August 1983Technical Evaluation of Integrity of Oyster Creek Reactor Coolant Boundary Piping SysWeld Overlay
Operating Basis Earthquake
Nondestructive Examination
Pressure Boundary Leakage
Pressure boundary leak
Dissimilar Metal Weld
ML20080E26430 August 1983Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors,Oyster Creek Nuclear Generating Station, Technical Evaluation ReptSafe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
ML20079Q71210 June 1983Control of Heavy Loads (C-10),JCP&L Oyster Creek Nuclear Power Plant, Technical Evaluation ReptSafe Shutdown
Nondestructive Examination
Control of Heavy Loads
ML20076J4036 April 1983RCS Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept
ML20076C42327 January 1983ECCS Repts (F-47) TMI Action Plan Requirements,Jcp&L, Oyster Creek Nuclear Generating Station, Technical Evaluation Rept
ML20070L73131 December 1982Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station.Docket No. 50-219.(General Public Utilities)
ML20126E9947 December 1982Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982
ML20070J33130 November 1982Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station.Progress Report,March - May 1982Veliger
ML20071N26030 September 1982Inservice Insp Program, Technical Evaluation ReptHigh Radiation Area
Weld Overlay
Hydrostatic
Incorporated by reference
Dissimilar Metal Weld
ML20027A90631 August 1982Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Oyster Creek Nuclear Generating Station, Technical Evaluation ReptFuel cladding
Power change
ML20065B85031 August 1982Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station.Progress Report,December 1981-Februaury 1982
ML20140B76531 July 1982Review of Operating Experience History of Oyster Creek Through 1981 for NRC SEP, Final Rept
ML20027D22631 July 1982Restart of Core Spray & Low Pressure Coolant Injection Sys, NUREG-0737,Item II.K.3.21,Oyster Creek Nuclear Generating Station.
ML20058B11730 June 1982Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station.Progress Report,September-November 1981
ML20054L4969 June 1982Hydrological Considerations (SEP,II-3.A,B,B.1,3.C) Jcp&L, Oyster Creek Nuclear Power Plant, Revised Technical Evaluation ReptSafe Shutdown
Ultimate heat sink
Hydrostatic
Earthquake
ML20054E4188 June 1982Wind & Tornado Loadings (SEP III-2), Technical Evaluation ReptSafe Shutdown
ML20063G77731 May 1982SEP Structural Review of Oyster Creek Nuclear Power Plant Drywell Containment Structure Under Combined LoadsSafe Shutdown Earthquake
Finite Element Analysis
Earthquake
ML20062A48830 April 1982Safety Evaluation Rept,Pump & Valve Inservice Testing Program,Oyster Creek Nuclear Generating Station, Interim ReptStroke time
Scram Discharge Volume
Excess Flow Check Valve
Exemption Request
Power-Operated Valves
ML20052H43630 April 1982Restart of Core Spray & Low Pressure Coolant Injection Sys, NUREG-0737,Item II.K.3.21,Oyster Creek Nuclear Generating Station.
ML20052B58128 April 1982Design Codes,Design Criteria, & Loading Combinations (SEP III-7.B) Jersey Central Power & Light Co,Oyster Creek Nuclear Generating Station, Technical Evaluation Rept
ML20053D21427 April 1982Control of Heavy Loads, Draft Technical Evaluation ReptSafe Shutdown
Nondestructive Examination
Control of Heavy Loads
ML20052D48531 March 1982Draft SEP Structural Review of Oyster Creek Nuclear Power Plant Drywell Containment Structure Under Combined Loads.Safe Shutdown Earthquake
Finite Element Analysis
Earthquake
ML20049H96918 February 1982Comparison of Plant & Model Radiological Effluent Tech Specs,Gpu Nuclear Corp, Draft Radiological Effluent Tech Spec Implementation
ML20064L07127 January 1982Technical Evaluation Rept for BWR Scram Discharge Vol Long-Term Mods Oyster Creek Nuclear Generating StationShutdown Margin
Scram Discharge Volume
ML19348A05431 August 1981Degraded Grid Protection for Class IE Power Sys,Oyster Creek Nuclear Power Station,Unit 1.
ML20010D80431 July 1981Preliminary Adequacy of Station Electric Distribution Sys Voltages,Oyster Creek Nuclear Power Station, Technical Evaluation Rept
ML20009E06017 July 1981Changes Report Number to NUREG/CR-1939,Volume 1, Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating Station
ML20009F16530 June 1981Degraded Grid Protection for Class IE Power Sys,Oyster Creek Nuclear Station Unit 1, Technical Evaluation Rept
ML20010B39110 June 1981Draft Technical Evaluation:Sep Topic VI-4, Electrical, Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation.Reactor Vessel Water Level
ML20010A01731 May 1981Technical Evaluation of Response to Position 5 of Item II.E.4.2 of NUREG-0737,Containment Isolation Setpoint for Oyster Creek Nuclear Power Plant. Setpoint Requirements Have Been Met
ML20049J18721 May 1981Containment Leakage Rate Testing, Technical Evaluation Rept
ML20008F76630 April 1981Ecological Studies of WOOD-BORING Bivalves in the Vicinity of the Oyster Creek Nuclear Generating StationVeliger