Issue date | Title | Topic | |
---|---|---|---|
ML24029A147 | 31 January 2024 | TSTF-592 Cover Letter for Final SE of TSTF-592 | |
ML24029A148 | 31 January 2024 | Final Traveler SE of TSTF-592 | |
ML23325A214 | 18 December 2023 | Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program | Probabilistic Risk Assessment |
ML23262B230 | 21 September 2023 | Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program | Probabilistic Risk Assessment |
ML23241B040 | 11 September 2023 | Final Traveler SE of TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown | Safe Shutdown Recently irradiated fuel Offsite Circuit |
ML23153A144 | 11 September 2023 | Draft SE of Traveler TSTF-591, Revise Risk-Informed Completion Time (RICT) Program | Probabilistic Risk Assessment |
ML23206A076 | 31 July 2023 | Final Traveler SE of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | Reactor Vessel Water Level High Radiation Area Anticipated operational occurrence |
ML23206A075 | 31 July 2023 | Final Model SE of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | Reactor Vessel Water Level High Radiation Area Anticipated operational occurrence |
ML21188A225 | 11 July 2021 | Final Model SE of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling | |
ML21188A227 | 11 July 2021 | Final Traveler SE of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling | |
ML21053A396 | 26 May 2021 | Draft Model SE of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown | |
ML21053A388 | 26 May 2021 | Draft Traveler SE of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown | |
ML21106A239 | 20 April 2021 | Final Model SE of TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements | Pressure Boundary Leakage |
ML21096A274 | 14 April 2021 | Final Model SE of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections | Nondestructive Examination |
ML21098A188 | 14 April 2021 | Final SE of Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections | Anticipated operational occurrence Nondestructive Examination Foreign Material Exclusion |
ML20311A664 | 21 December 2020 | Draft Model Safety Evaluation of TSTF-554 Revise Reactor Coolant Leakage Requirements | Pressure Boundary Leakage |
ML20353A209 | 21 December 2020 | Cover Letter Transmitting Draft Model TSTF-554, Revise Reactor Coolant Leakage Requirements | |
ML20322A024 | 18 December 2020 | Final SE of Traveler TSTF-554, Revise Reactor Coolant Leakage Requirements | Boric Acid Pressure Boundary Leakage |
ML20154K606 | 30 October 2020 | Draft Safety Evaluation of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | Boric Acid Pressure Boundary Leakage |
ML20248H537 | 9 October 2020 | Model Safety Evaluation of TSTF-582, RPV WIC Enhancements with Optional TSTF-583-T Variation | Water Inventory Control Fuel cladding Offsite Circuit |
ML20132A260 | 13 May 2020 | Revised Final SE of Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process | Anticipated operational occurrence Fuel cladding |
ML19248C823 | 25 February 2020 | Revised Final Model Safety Evaluation of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process | Anticipated operational occurrence Fuel cladding |
ML19325C434 | 17 December 2019 | Final Safety Evaluation of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 | |
TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. | 5 November 2019 | TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. | Safe Shutdown Ultimate heat sink Anticipated operational occurrence |
ML19176A190 | 14 August 2019 | Final Model Safety Evaluation of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition (EPID L-2018-PMP-0002) (Enclosure 2) | Anticipated operational occurrence |
ML19176A191 | 14 August 2019 | Final Safety Evaluation of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition (EPID L-2018-PMP-0002) (Enclosure 1) | Anticipated operational occurrence |
ML19017A217 | 29 May 2019 | Draft Model Safety Evaluation of Technical Specifications Task Force Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition (Enclosure 2) | Anticipated operational occurrence |
ML19028A286 | 21 February 2019 | Final Model SE of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems (Enclosure 2) | |
ML19028A287 | 21 February 2019 | Final SE of Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems (Enclosure 1) | |
ML19007A227 | 15 January 2019 | Final Model SE of Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. | |
ML19007A226 | 15 January 2019 | Final SE of Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. | |
ML18333A147 | 4 December 2018 | Final Model SE of Traveler TSTF 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (Enclosure 2) | Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency |
ML18333A144 | 4 December 2018 | Final SE of Traveler TSTF 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. | Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency |
ML18267A259 | 21 November 2018 | Final Revised Model Safety Evaluation of Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Large early release frequency Offsite Circuit Backfit |
ML18299A069 | 16 November 2018 | Final Traveler SE of TSTF-564, Revision 2, Safety Limit MCPR | Anticipated operational occurrence Fuel cladding |
ML18299A076 | 16 November 2018 | Final Model SE of TSTF-564, Revision 2, Safety Limit MCPR | Anticipated operational occurrence Fuel cladding |
ML18299A083 | 16 November 2018 | NRC Disposition of TSTF Comments on the Draft Safety Evaluation of TSTF-564, Safety Limit MCPR | |
ML18226A318 | 20 September 2018 | Draft Model SE of Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SFCP) - Enclosure 2 | Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency |
ML18226A256 | 20 September 2018 | Draft SE of Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SFCP) - Enclosure 1 | Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency |
TSTF-18-07, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 2 | 2 July 2018 | TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 2 | |
ML17341A326 | 26 March 2018 | Draft Model Safety Evaluation of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues. | |
ML17080A414 | 3 July 2017 | Draft Safety Evaluation of Technical Specifications Task Force Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements | Water Inventory Control |
ML16343B008 | 20 December 2016 | Final Safety Evaluation of Technical Specifications Task Force Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (Tac No. MF3487) | Reactor Vessel Water Level Water Inventory Control Hydrostatic Surveillance Frequency Control Program Fuel cladding Offsite Circuit |
ML16343B065 | 20 December 2016 | Final Model Safety Evaluation of Technical Specifications Task Force Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program Fuel cladding Offsite Circuit |
ML15328A350 | 4 March 2016 | Final Safety Evaluation (SE) of TSTF-547, Rev. 1, Clarification of Rod Position Requirements | Shutdown Margin Surveillance Frequency Control Program |
ML15314A305 | 11 December 2015 | TSTF-545 Final Model SE | Safe Shutdown Incorporated by reference |
ML15181A037 | 9 September 2015 | Proposed Model Se for Plant-Specific Adoption of Traveler TSTF-545, Revision 2, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the CLIIP | Safe Shutdown Incorporated by reference |
ML13113A181 | 9 July 2013 | Proposed Model Safety Evaluation for PLANT-SPECIFIC Adoption of Technical Specifications Task Force Traveler TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process | Surveillance Frequency Control Program |
ML12355A772 | 19 February 2013 | Model Safety Evaluation for Plant-Specific Adoption of Tech Spec Task Force Traveler TSTF-535, Rev. 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs, Using the Consolidated Line Item Improvement Process | Shutdown Margin Anticipated operational occurrence |
ML12097A596 | 7 January 2013 | TSTF-426 Nfc Model Safey Evaluation | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Large early release frequency |