MONTHYEARTSTF-17-12, Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr2017-08-28028 August 2017 Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr Project stage: Request ML17325B6722017-11-28028 November 2017 Acceptance for Review Regarding Traveler TSTF-564, Safety Limit MCPR Project stage: Acceptance Review ML18085A0252018-03-20020 March 2018 Traveler TSTF-564, Safety Limit MCPR, Draft RAIs Project stage: Draft Other ML18095A2292018-04-12012 April 2018 Request for Additional Information Traveler TSTF-564, Safety Limit MCPR Project stage: RAI TSTF-18-05, TSTF Response to NRC Questions on TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR2018-05-29029 May 2018 TSTF Response to NRC Questions on TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR Project stage: Other ML18212A0182018-07-30030 July 2018 Global Nuclear Fuel - Submittal of Revised Information Supporting TSTF-564 Safety Limit Minimum Critical Power Ratio Project stage: Other ML18208A1522018-10-0303 October 2018 Draft Model Safety Evaluation of TSTF-564, Revision 1, Safety Limit MCPR Using the Consolidated Line Item Improvement Process Project stage: Draft Approval ML18207A3762018-10-0303 October 2018 Draft Safety Evaluations of Technical Specifications Task Force Traveler TSTF-564, Revision 1, Safety Limit MCPR Using the Consolidated Line Item Improvement Process Project stage: Draft Approval ML18208A1462018-10-0303 October 2018 Draft Traveler Safety Evaluation of TSTF-564, Revision 1, Safety Limit MCPR Using the Consolidated Line Item Improvement Process Project stage: Draft Approval ML18207A3802018-10-0303 October 2018 TSTF-564 Draft SE Package Project stage: Request ML18299A0482018-10-24024 October 2018, 16 November 2018 TSTF-564, Revision 2, Safety Limit MCPR Final SE Package Project stage: Request TSTF-18-12, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-564, Revision 1, Safety Limit MCPR2018-10-24024 October 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-564, Revision 1, Safety Limit MCPR Project stage: Draft Other ML18299A0762018-11-16016 November 2018 Final Model SE of TSTF-564, Revision 2, Safety Limit MCPR Project stage: Other ML18299A0692018-11-16016 November 2018 Final Traveler SE of TSTF-564, Revision 2, Safety Limit MCPR Project stage: Other ML18299A0542018-11-16016 November 2018 Cover Letter for Final SEs of TSTF-564, Revision 2, Safety Limit MCPR Project stage: Approval ML18299A0832018-11-16016 November 2018 NRC Disposition of TSTF Comments on the Draft Safety Evaluation of TSTF-564, Safety Limit MCPR Project stage: Draft Approval ML20132A2602020-05-13013 May 2020 Revised Final SE of Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process Project stage: Approval 2018-11-16
[Table View] |
Text
Enclosure 3 NRC DISPOSITION OF TSTF COMMENTS ON THE DRAFT SAFETY EVALUATIONS OF TSTF-564, SAFETY LIMIT MCPR General TSTF Comments from Attachment 1 to TSTF letter dated October 24, 2018 (ADAMS Accession No. ML18297A361).
The TSTF identified additional minor changes to TSTF-564, Revision 1, following its submittal.
These changes reflect a modification of the rounding methodology incorporated in Revision 1.
The Safety Limit for Global Nuclear Fuel (GNF) GE14 fuel is revised from 1.05 to 1.06 and the referenced GNF methodology document is updated. These changes have been previously discussed with the NRC staff. Revision 2 of TSTF-564 is enclosed.
Disposition of Comments on the Draft Traveler Safety Evaluation of TSTF-564 Page(s)
Line(s)1 TSTF Comment on Traveler SE NRC Disposition 1
20 The term technical specifications should be revised to be plural to be consistent with 10 CFR 50.36 and the Standard Technical Specifications (STS).
Incorporated.
1 34-35 For completeness, we recommend adding a reference to the Revision 0 submittal of TSTF-564.
Incorporated.
1 36 Editorial suggestion. There was only one request for additional information.
Incorporated.
Disposition of Comments on the Draft Model Safety Evaluation of TSTF-564 Page(s) Line(s)2 TSTF Comment on Model SE NRC Disposition 3
31-34 Recommend placing the description of the current TS 2.1.1.2 in brackets and in bold to accommodate various plant TS without invoking a variation from the SE.
Incorporated.
4 14-16 Recommend placing the description of the current TS 2.1.1.2 in brackets and in bold to accommodate various plant TS without invoking a variation from the SE.
Incorporated.
9 12 For clarity, the SE should state that the MCPR99.9% value will be included in the COLR instead of the MCPR value.
Incorporated.