Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20211D398 | 24 August 1999 | Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectively | Power-Operated Valves Backfit |
ML20207B593 | 26 May 1999 | SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMs | High Radiation Area Hydrostatic VT-2 Liquid penetrant |
ML20202J173 | 22 January 1999 | Safety Evaluation Concluding That NSP Proposed Alternative to Surface Exam Requirements of ASME BPV Code for CRD Mechanism Canopy Seal Welds Will Provide Acceptable Level of Quality & Safety | Weld Overlay VT-2 Liquid penetrant |
ML20237A817 | 5 August 1998 | SER Related to USI A-46 Program GL 87-02 Implementation for Prairie Island Nuclear Generating Plant,Units 1 & 2 | Safe Shutdown Safe Shutdown Earthquake Earthquake |
ML20217M690 | 29 April 1998 | Safety Evaluation Accepting Methodology for Relocation of Reactor Coolant Sys P/T Limit Curves & LTOP Sys Limits Proposed by NSP for Pingp,Units 1 & 2 | Hydrostatic |
ML20203H833 | 20 February 1998 | SE Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds for Prairie Island Nuclear Generating Plant,Unit 2 | Hydrostatic Liquid penetrant |
ML20148D544 | 16 May 1997 | Safety Evaluation of Prairie Island Nuclear Generating Plant Individual Plant Exam | Ultimate heat sink Internal Flooding |
ML20138J996 | 6 May 1997 | Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of CRD Mechanism Canopy Seal Welds | High Radiation Area Hydrostatic VT-2 |
ML20058N802 | 8 December 1993 | Safety Evaluation Approving Third 10-yr IST Program Requests for Pumps & Valves,Per 10CFR50.55a(f)(6)(i) & 10CFR50.55a(a)(3)(i) | |
ML20127C007 | 4 January 1993 | Supplemental SE Accepting Changes & Additions Described in Rev 1 to Design Rept for Station Blackout/Electrical Safeguards Upgrade Project | |
ML20127C029 | 4 January 1993 | Safety Evaluation Accepting pressure-retaining Components of safety-related Auxiliary Fluid Sys Associated W/Edgs | Safe Shutdown Safe Shutdown Earthquake |
ML20127C024 | 4 January 1993 | Safety Evaluation Re Audit of Load Sequencer Implementation. Four of Five Items Reviewed Acceptable & Closed.One Open Item Remained Re Electromagnetic Environ Qualification for Lower Frequency Range of 30 Hz to 10 Khz | Commercial Grade Dedication |
ML20127C015 | 4 January 1993 | Safety Evaluation Accepting Instrumentation & Control Sys Aspects of Unit 2 Load Sequencer Sys in Station Blackout/ Electrical Safeguards Upgrade Project | |
ML20128A730 | 30 November 1992 | Safety Evaluation Accepting Licensee 920921 120-day Response to Suppl 1 to GL 87-02 Re in-structure Response Spectra | Earthquake |
ML20128A717 | 30 November 1992 | Safety Evaluation Accepting Licensee 920921 120-day Response to Suppl 1 to GL 87-02 as Commitment to Entire GIP-2, Including Both SQUG Commitments & Implementation Guidance. In-structure Response Spectra Addressed in Separate SE | |
ML20151U118 | 17 August 1988 | Safety Evaluation Re Compliance W/Atws Rule (10CFR50.62). Design Acceptable Contingent Upon Successful Completion of Human Factors Engineering Studies & Qualification of Isolation Devices | Anticipated operational occurrence |
ML20235Y479 | 13 July 1987 | Supplemental Safety Evaluation Accepting Util 870120 Requests for Relief from ASME Code Requirements Re Inservice Insp & Testing Program for Second 10-yr Interval | Stroke time Power Operated Valves |
ML20205Q807 | 30 March 1987 | SER Accepting Util 861104 & 840706 Responses to Generic Ltr 83-28,Item 4.5.2 Re ATWS Requirements for on-line Testing of Reactor Trip Sys | |
ML20205M526 | 27 March 1987 | Safety Evaluation Denying Util 860819 Proposal to Reproduce Radiographs on Microfilm | |
ML20211Q297 | 18 February 1987 | Safety Evaluation Re Auxiliary Feedwater Sys Reliability (Generic Issue 124) for Prairie Island Units 1 & 2 | Probabilistic Risk Assessment Emergency Lighting |
ML20209C215 | 21 January 1987 | Safety Evaluation Re Auxiliary Feedwater Sys Reliability (Generic Issue 124) at Prairie Island Units 1 & 2.Util Actively Pursuing Improvements in Sys Reliability & Reducing Sys Challenges | Emergency Lighting |
ML20214S413 | 26 November 1986 | Safety Evaluation Finding Auxiliary Feedwater Sys Adequately Designed,Maintained & Operated.Licensee Actively Pursuing Improvements in Auxiliary Feedwater Sys Reliability & in Reducing Challenges to Sys | Safe Shutdown Probabilistic Risk Assessment Emergency Lighting |
ML20214C923 | 14 November 1986 | Safety Evaluation Supporting Amends 80 & 73 to Licenses DPR-42 & DPR-60,respectively | |
ML20212K880 | 15 August 1986 | Corrected Safety Evaluation Accepting Util 860110 Projected Values of Matl Properties for Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events | |
ML20203B155 | 11 July 1986 | SER Re Util 831104 Response to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification. Program Acceptable. Exemption of Turbine Trip Component from Listing Also Acceptable | |
ML20202A753 | 23 June 1986 | Safety Evaluation Supporting Projected Values of Matl Properties for Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events | |
ML20199L449 | 23 June 1986 | Safety Evaluation Re Util 860110 Projected Values of Matl Properties for Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events.Response Acceptable | |
ML20211A379 | 30 May 1986 | Safety Evaluation Re Use of VIPRE-01 Subchannel Thermal Hydraulic Code & WRB-1 Critical Heat Flux Correlation W/Min DNBR Limit of 1.17.Code & Correlation Acceptable | |
ML20211A211 | 27 May 1986 | SER Supporting Util Response to Generic Ltr 83-28,Item 1.2, Post-Trip Review (Data & Info Capability) | |
ML20141N096 | 25 February 1986 | Safety Evaluation Accepting K(Z) Curve & Current Tech Spec Fq Value of 2.32 | |
ML20138H195 | 18 October 1985 | Safety Evaluation Re Util 850422 & 0830 Ltrs Concerning Removal of Rod Cluster Control Guide Tube Thimble Plugs. Plan Acceptable | |
ML20133N202 | 18 October 1985 | Safety Evaluation Accepting Util 830415,0915,850118 & 0606 Responses to Generic Ltr 82-33 Re Conformance of post- Accident Monitoring Instrumentation W/Rev 2 to Reg Guide 1.97 | |
ML20138P630 | 17 October 1985 | Safety Evaluation Re Util 831104 Response to Generic Ltr 83-28,Items 4.2.1 & 4.2.2 Concerning Reactor Trip Breaker Automatic Shunt Trip.Licensee Position on Items Acceptable | |
ML20138E166 | 11 October 1985 | Safety Evaluation Re 850809 Inservice Insp of Components Relief Requests 29 & 66.Alternative Acceptable & Relief Should Be Granted | Hydrostatic |
ML20133P052 | 5 August 1985 | Safety Evaluation Accepting Util post-trip Review Program & Procedures.Nrc Action on Item 1.1 of Generic Ltr 83-28 Completed | |
ML20128M909 | 13 May 1985 | Safety Evaluation Supporting Util 831104 Response to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2,4.1 & 4.5.1 | |
ML20062B645 | 9 July 1982 | Safety Evaluation Supporting Thermal Hydraulic Margins for Exxon Toprod for Cycle 7 | |
ML20062B636 | 20 October 1981 | Safety Evaluation Supporting Thermal Hydraulic Margins for Exxon Toprod for Cycle 7 |