Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20196K482 | 6 July 1999 | Safety Evaluation Concluding That Because of Permanently Shutdown & Defueled Status of Myaps Facility,Confirmatory Orders No Longer Necessary for Safe Operation or Maint of Plant | |
ML20206H161 | 5 May 1999 | Safety Evaluation Supporting Amend 164 to License DPR-36 | Safe Shutdown Fire Protection Program |
ML20206G573 | 3 May 1999 | Safety Evaluation Supporting Amend 163 to License DPR-36 | |
ML20205D526 | 26 March 1999 | SER Accepting Util Rev 1 to CFH Training & Retraining Program for Maine Yankee.Rev 1 to CFH Training & Retraining Program Consistent with Current Licensing Practice for Facilities Undergoing Decommissioning | |
ML20204C463 | 16 March 1999 | Safety Evaluation Supporting Amend 162 to License DPR-36 | Recently irradiated fuel |
ML20197C823 | 3 September 1998 | Safety Evaluation Supporting Request for Exemption from Certain Requirements of 10CFR50.54(q),10CFR50.47(b) & (C) & App E to 10CFR50 Re Emergency Planning | Exemption Request |
ML20236U845 | 24 July 1998 | Safety Evaluation Accepting Rev 14 to Maine Yankee Atomic Power Co Operational QA Program | Nondestructive Examination |
ML20217H524 | 30 March 1998 | Safety Evaluation Supporting Amend 161 to License DPR-36 | Safe Shutdown Boric Acid High Radiation Area Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Post Accident Monitoring Probabilistic Risk Assessment Pressure and Temperature Limits Report Process Control Program Fuel cladding |
ML20202D318 | 26 November 1997 | Safety Evaluation Supporting Amend 160 to License DPR-36 | |
ML20216F151 | 8 August 1997 | Safety Evaluation Supporting Amend 159 to License DPR-36 | |
ML20141G651 | 19 May 1997 | Safety Evaluation Supporting Amend 158 to License DPR-36 | |
ML20138G354 | 2 May 1997 | Safety Evaluation Supporting Amend 157 to License DPR-36 | |
ML20058E264 | 5 November 1993 | Safety Evaluation Supporting Amend 143 to License DPR-36 | |
ML20056F783 | 23 August 1993 | Safety Evaluation Supporting Amend 142 to License DPR-36 | |
ML20127D506 | 11 January 1993 | Safety Evaluation Supporting Amend 136 to License DPR-36 | |
ML20126H621 | 29 December 1992 | Safety Evaluation Supporting Amend 135 to License DPR-36 | |
ML20059K999 | 20 September 1990 | SER Accepting Methodology Re Statistical Combination of Uncertainties for RPS Setpoints | |
ML20059H590 | 12 September 1990 | Safety Evaluation Re Facility Response to Station Blackout Rule.Issue of Conformance to Station Blackout Rule Will Remain Open at Facility Until Identified Nonconformances Resolved | |
ML20059D050 | 30 August 1990 | Safety Evaluation Supporting Amend 117 to License DPR-36 | |
ML20055C291 | 20 February 1990 | Safety Evaluation Accepting Util Assessment of Asymmetric LOCA Loads Problem | |
ML20246F628 | 10 July 1989 | Safety Evaluation Supporting Amend 113 to License DPR-36 | Shutdown Margin Anticipated operational occurrence |
ML20245J057 | 25 April 1989 | SER Re Accepting Facility Emergency Response Capability in Conformance to Reg Guide 1.97,Rev 3,w/exception of Instrumentation Re Variables Accumulator Tank Level & Pressure & Containment Sump Water Temp | |
ML20245D448 | 24 April 1989 | Safety Evaluation Supporting Amend 111 to License DPR-36 | |
ML20245D435 | 24 April 1989 | Safety Evaluation Supporting Amend 112 to License DPR-36 | Reactor Vessel Water Level |
ML20155B463 | 27 September 1988 | Safety Evaluation Supporting Amend 107 to License DPR-36 | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML20154A141 | 7 September 1988 | Safety Evaluation Supporting Amend 106 to License DPR-36 | |
ML20150D768 | 7 July 1988 | Safety Evaluation Approving Util Inadequate Core Cooling Instrumentation Sys Contingent on Completion of Emergency Procedures & Operator Training & Submittal of Applicable Tech Specs | Hydrostatic |
ML20153A964 | 28 June 1988 | Safety Evaluation Accepting Util Proposed Reflood Steam Cooling Model | |
ML20196G687 | 23 June 1988 | Safety Evaluation Supporting Amend 105 to License DPR-36 | Shutdown Margin |
ML20151W586 | 26 April 1988 | Safety Evaluation Supporting Amend 104 to License DPR-36 | |
ML20153B338 | 16 March 1988 | Safety Evaluation Supporting Util 831110,840216,0412,1214, 850618 & 0820 Responses to Generic Ltr 83-28,Item 2.2.2, Based on Stated Util Commitments,Insp Rept 50-309/86-07 & Actions Described in Procedure for Vendor Interface | |
ML20149H283 | 17 February 1988 | Safety Evaluation Supporting Amend 103 to License DPR-36 | |
ML20196C430 | 9 February 1988 | Safety Evaluation Supporting Amend 102 to License DPR-36 | |
ML20235M466 | 29 September 1987 | Safety Evaluation Supporting Amend 101 to License DPR-36 | |
ML20236F644 | 29 July 1987 | Safety Evaluation Supporting Util Response to Item 2.1 of Generic Ltr 83-28 | |
ML20234B178 | 25 June 1987 | Safety Evaluation Supporting Amend 100 to License DPR-36 | |
ML20216J037 | 25 June 1987 | Safety Evaluation Supporting Amend 99 to License DPR-36 | |
ML20215E930 | 15 June 1987 | Safety Evaluation Supporting Amend 98 to License DPR-36 | |
ML20214W384 | 4 June 1987 | SER Supporting Util 831110 Response to Generic Ltr 83-28, Item 2.2 (Part 1) Re Requirement for Program Description to Ensure All Components of safety-related Sys Identified as safety-related on Informational Matls | |
ML20214M149 | 21 May 1987 | Safety Evaluation Supporting Util Responses to Generic Ltr 83-28,Item 2.1 (Part 2) Re Established Interface W/Nsss or Vendors of Each Component of Reactor Trip Sys | |
ML20214J600 | 20 May 1987 | Safety Evaluation Supporting Amend 97 to License DPR-36 | |
ML20210C663 | 23 April 1987 | Safety Evaluation Re Adequacy of Offsite Power Sys.Further Evaluation Cannot Continue Until All Requested Info Received.Surowiec Line Not Acceptable Substitute for Mason Line During Startup or Normal Operations | |
ML20206U923 | 9 April 1987 | Safety Evaluation Supporting Amend 96 to License DPR-36 | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML20197D442 | 7 April 1987 | Safety Evaluation Supporting 850807 Request for Relief from ASME Code,Section XI Inservice Testing Requirements for Pump & Valves | |
ML20205M639 | 26 March 1987 | Safety Evaluation Accepting Upgraded Seismic Design Program Contingent on Licensee Commitment to Upgrade Items in Table 3 | Safe Shutdown Earthquake Probabilistic Risk Assessment Earthquake |
ML20197D424 | 26 March 1987 | Safety Evaluation Supporting Amend 94 to License DPR-36 | |
ML20212N709 | 4 March 1987 | Safety Evaluation Supporting Amend 93 to License DPR-36 | |
ML20211G436 | 14 February 1987 | Safety Evaluation Supporting Util 831110 Response to Generic Ltr 83-28,Item 4.5.2 Re on-line Testing for Reactor Trip Sys Reliability | |
ML20210V183 | 9 February 1987 | Safety Evaluation Supporting Amend 92 to License DPR-36 | |
ML20207N218 | 12 January 1987 | Safety Evaluation Supporting Util Response to NRC 860721 Request for Addl Info Re Reactor Coolant Pump Shaft Integrity,Per IE Info Notice 86-019 |