RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | 3 January 2024 | Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | VT-2 |
RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | 15 December 2023 | Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | High winds Mission time Tornado Missile B.5.b Surveillance Frequency Control Program Recently irradiated fuel Offsite Circuit |
RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | 10 November 2023 | Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Time of Discovery Fitness for Duty Contraband Exemption Request |
RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | 10 November 2023 | Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Time of Discovery Fitness for Duty Contraband Exemption Request |
RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis | 24 July 2023 | Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis | Safe Shutdown Finite Element Analysis Aging Management |
RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell | 28 April 2023 | Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell | Nondestructive Examination |
RS-23-041, Response to Request for Additional Information for Alternative Request RV-23H | 14 March 2023 | Response to Request for Additional Information for Alternative Request RV-23H | |
RS-23-004, Response to Request for Additional Information Regarding Transition to GNF3 Fuel License Amendment Request | 23 January 2023 | Response to Request for Additional Information Regarding Transition to GNF3 Fuel License Amendment Request | |
RS-23-005, Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves | 17 January 2023 | Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves | |
ML23012A083 | 12 January 2023 | Response to Request for Additional Information for Alternative I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements | Non-Destructive Examination Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld |
RS-22-117, Response to Request for Additional Information License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies | 3 November 2022 | Response to Request for Additional Information License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies | |
RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage | 12 October 2022 | Response to Request for Additional Information License Amendments Related to Fuel Storage | |
RS-22-108, Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage | 5 October 2022 | Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage | |
RS-22-096, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval | 10 August 2022 | Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval | VT-2 |
RS-22-095, Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel | 10 August 2022 | Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel | Fuel cladding |
RS-22-101, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval | 10 August 2022 | Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval | VT-2 |
RS-22-098, Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-28 | 1 August 2022 | Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-28 | Scram Discharge Volume |
RS-22-089, Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock | 25 July 2022 | Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock | High winds |
RS-22-090, Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies | 13 July 2022 | Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies | Earthquake Fire Protection Program |
RS-22-078, Response to Request for Additional Information for Quad Cities Relief Request RV-09, MSSVs | 30 June 2022 | Response to Request for Additional Information for Quad Cities Relief Request RV-09, MSSVs | Grace period |
RS-22-077, Response to Request for Additional Information for Quad Cities Relief Requests RV-08, Safety Relief Valves | 30 June 2022 | Response to Request for Additional Information for Quad Cities Relief Requests RV-08, Safety Relief Valves | |
RS-22-083, Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical | 17 June 2022 | Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical | |
CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change | 9 June 2022 | Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
RS-22-040, Response to Request for Additional Information Related to the License Amendment Request to Transition to GNF3 Fuel | 11 April 2022 | Response to Request for Additional Information Related to the License Amendment Request to Transition to GNF3 Fuel | Anticipated operational occurrence Post Accident Monitoring Fuel cladding |
RS-22-033, Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs | 3 March 2022 | Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs | |
RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated | 23 February 2022 | Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P | Surveillance Frequency Control Program |
NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs | 2 February 2022 | Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs | Nondestructive Examination VT-2 Foreign Material Exclusion Through-Wall Leakage |
RS-22-005, Response to Request for Additional Information for the GNF3 Fuel Transition License Amendment Request | 11 January 2022 | Response to Request for Additional Information for the GNF3 Fuel Transition License Amendment Request | Anticipated operational occurrence |
RS-21-113, Response to Supplemental Request for Information Related to Request for Licensing Amendment Regarding Transition to GNF3 Fuel | 3 November 2021 | Response to Supplemental Request for Information Related to Request for Licensing Amendment Regarding Transition to GNF3 Fuel | Post Accident Monitoring |
JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments | 16 September 2021 | Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments | |
RS-21-087, Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values | 31 August 2021 | Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values | |
RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel | 19 August 2021 | Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel | Water Inventory Control Recently irradiated fuel Offsite Circuit |
RS-21-085, Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016) | 17 August 2021 | Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016) | |
NMP2L2773, Company - Response to Request for Additional Information | 30 June 2021 | Company - Response to Request for Additional Information | Boric Acid |
JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments | 11 June 2021 | Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments | |
RS-21-055, Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended. | 10 May 2021 | Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended. | Safe Shutdown |
ML21111A004 | 20 April 2021 | Response to Request to Request Clinton, Unit 1, COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements | Exemption Request Pandemic Coronavirus COVID-19 |
JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting | 20 April 2021 | Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting | |
RS-21-050, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) | 16 April 2021 | Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) | Ultimate heat sink |
RS-21-045, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) | 7 April 2021 | Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) | Ultimate heat sink |
RS-21-040, Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 31 March 2021 | Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown Probabilistic Risk Assessment Offsite Circuit |
RS-21-037, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 2 | 23 March 2021 | Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 2 | Thermoset |
RS-21-036, Response to Request for Additional Information Re Dresden License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition | 16 March 2021 | Response to Request for Additional Information Re Dresden License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition | Ultimate heat sink Abnormal operational transient Surveillance Frequency Control Program Recently irradiated fuel |
RS-21-029, Response to RAI Re License Amendment Request - Proposed Changes to Byron & Dresden Stations Emergency Plan for Post-Shutdown and Permanently Defueled Condition | 15 March 2021 | Response to RAI Re License Amendment Request - Proposed Changes to Byron & Dresden Stations Emergency Plan for Post-Shutdown and Permanently Defueled Condition | |
RS-21-027, Response to Request for Additional Information Regarding Request for Exemption from Pre-Access Drug and Alcohol Testing Requirements in 10 CFR 26.65 | 21 February 2021 | Response to Request for Additional Information Regarding Request for Exemption from Pre-Access Drug and Alcohol Testing Requirements in 10 CFR 26.65 | Fitness for Duty |
ML21022A130 | 22 January 2021 | Response to Request for Additional Information Regarding the License Amendment Request to Adopt 10 CFR 50.69 | Safe Shutdown Mission time Internal Flooding Probabilistic Risk Assessment Large early release frequency |
RS-20-139, Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 | 24 November 2020 | Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 | Ultimate heat sink Mission time Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Significance Determination Process Thermoset Large early release frequency Earthquake Maintenance Rule Program Hardened vent Offsite Circuit Scaffolding |
RS-20-136, Response to Request for Additional Information Re License Amendment Requests for Amendments to Renewed Facility OL to Adopt 10CFR50.69 & to Adopt TSTF-505, Rev. 2 (EPID L-2020-LLA-0017 and EPID-L-2020-LLA-0018) | 29 October 2020 | Response to Request for Additional Information Re License Amendment Requests for Amendments to Renewed Facility OL to Adopt 10CFR50.69 & to Adopt TSTF-505, Rev. 2 (EPID L-2020-LLA-0017 and EPID-L-2020-LLA-0018) | Internal Flooding Probabilistic Risk Assessment FLEX Significance Determination Process Large early release frequency Maintenance Rule Program Hardened vent Offsite Circuit Very Early Warning Fire Detection |
RS-20-133, Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.69 | 16 October 2020 | Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.69 | Safe Shutdown Mission time Probabilistic Risk Assessment Squib Incorporated by reference Seismically rugged Large early release frequency Earthquake |
RS-20-104, Supplement to the Request for a License Amendment Technical Specification 3.7.3, Ultimate Heat Sink | 11 September 2020 | Supplement to the Request for a License Amendment Technical Specification 3.7.3, Ultimate Heat Sink | Safe Shutdown Ultimate heat sink |