RA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner18 August 2023Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic LinerCoatings
Through-Wall Leak
Through Wall Leak
RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility13 May 2022Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations FacilityHealth Physics Network
High winds
RA-22-0003, Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative31 January 2022Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension AlternativeBoric Acid
Hydrostatic
Finite Element Analysis
Aging Management
Stress corrosion cracking
License Renewal
Subsequent License Renewal
Liquid penetrant
Operational leakage
RA-21-0275, Response to Request for Additional Information, Exemption Request for Senior Reactor Operator License Application25 October 2021Response to Request for Additional Information, Exemption Request for Senior Reactor Operator License ApplicationExemption Request
Fatigue Rule
Minimum staff
RA-21-0262, Response to Request for Additional Information Regarding Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping4 October 2021Response to Request for Additional Information Regarding Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried PipingDesign basis earthquake
Affidavit
RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan11 March 20211, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency PlanSafe Shutdown
Health Physics Network
Offsite Dose Calculation Manual
Tornado Missile
Met Tower
Emergency Lighting
Incorporated by reference
FLEX
Open House
Earthquake
Deep Dose Equivalent
Minimum staff
Fire Protection Program
Grace period
Siren
Overexposure
RA-21-0032, Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(411 February 2021Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(
RA-20-0364, 1 & 2 - Response to RAI for License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors Categorization Process24 November 20201 & 2 - Response to RAI for License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors Categorization ProcessSafe Shutdown
High winds
Hydrostatic
Probabilistic Risk Assessment
Flooding Focused Evaluation
RA-20-0324, Response to Request for Additional Information for Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements27 October 2020Response to Request for Additional Information for Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements
RA-19-0380, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request17 October 2019Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request
RA-19-0295, Response to Request for Additional Information - License Amendment Request to Revise Units 1 & 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies25 July 2019Response to Request for Additional Information - License Amendment Request to Revise Units 1 & 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies
RA-19-0241, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request18 June 2019Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment RequestAnticipated operational occurrence
Feedwater Controller Failure
MELLLA
Fuel cladding
Power Uprate
Affidavit
RA-19-0240, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request29 May 2019Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment RequestFeedwater Controller Failure
MELLLA
Fuel cladding
Power Uprate
Affidavit
RA-19-0217, Supplement to Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery ...16 May 2019Supplement to Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery ...Safe Shutdown
Ultimate heat sink
Qualified Offsite Circuit
Offsite Circuit
RA-19-0152, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures,Systems, and Components (Sscs) for Nuclear Power Reactors.8 April 2019Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures,Systems, and Components (Sscs) for Nuclear Power Reactors.High winds
Mission time
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
Large early release frequency
TORMIS
Continuous fire watch
Fire Watch
GOTHIC
RA-19-0150, Response to Request for Additional Information - Request for License Amendment - Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation3 April 2019Response to Request for Additional Information - Request for License Amendment - Technical Specification 3.3.8.1, Loss of Power (LOP) InstrumentationGrace period
RA-19-0010, Response to NRC RAI Re Application to Adapt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors13 February 2019Response to NRC RAI Re Application to Adapt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power ReactorsSafe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
FLEX
Continuous fire watch
Fire Watch
RA-19-0089, Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure...8 February 2019Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure...Safe Shutdown
Ultimate heat sink
Qualified Offsite Circuit
Offsite Circuit
RA-18-0246, Revised Response to Request for Additional Information: Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure- Temperature Limit Curves to a Pressure & Temperature ..11 December 2018Revised Response to Request for Additional Information: Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure- Temperature Limit Curves to a Pressure & Temperature ..Pressure and Temperature Limits Report
RA-18-0178, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for ...2 November 2018Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for ...High winds
Mission time
Fire Barrier
Tornado Missile
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
FLEX
B.5.b
Tornado Generated Missile
Surveillance Frequency Control Program
Large early release frequency
TORMIS
Risk-Informed Steering Committee
Turbine Missile
Continuous fire watch
Fire Watch
GOTHIC
RA-18-0100, Request for License Amendment Regarding Application of Advanced Framatome Methodologies11 October 2018Request for License Amendment Regarding Application of Advanced Framatome MethodologiesAnticipated operational occurrence
Power Uprate
Affidavit
RA-18-0144, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Report27 September 2018Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary ReportFukushima Dai-Ichi
Flooding Focused Evaluation
RA-18-0163, Response to Request for Additional Information - Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report27 September 2018Response to Request for Additional Information - Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits ReportShutdown Margin
Hydrostatic
Finite Element Analysis
Pressure and Temperature Limits Report
License Renewal
Power Uprate
Affidavit
BSEP 18-0054, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential.24 April 2018Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential.Hydrostatic
Power Uprate
BSEP 18-0048, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations11 April 2018Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld ExaminationsLicense Renewal
BSEP 18-0046, Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion10 April 2018Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range ExpansionAffidavit
BSEP 18-0035, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion29 March 2018Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range ExpansionTime Critical Operator Action
ML18075A3301 March 2018Response to Request for Additional Information SNPB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865)Exclusive Use
Affidavit
BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure5 February 2018Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary EnclosureSafety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Abnormal operational transient
Flow Accelerated Corrosion
MELLLA
Fuel cladding
Power Uprate
Exclusive Use
Affidavit
Water rod
BSEP 17-0115, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control4 January 2018Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory ControlWater Inventory Control
BSEP 17-0118, Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel..7 December 2017Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel..High winds
Probabilistic Risk Assessment
FLEX
B.5.b
BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..6 December 2017Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..Safe Shutdown
High winds
Mission time
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
Large early release frequency
Continuous fire watch
Very Early Warning Fire Detection
BSEP 17-0116, Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of ..4 December 2017Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of ..Safe Shutdown
BSEP 17-0109, Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And.24 November 2017Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And.FLEX
Overspeed trip
RA-17-0039, Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001)9 August 2017Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001)Finite Element Analysis
Stress corrosion cracking
Weak link
BSEP 17-0048, Clarification of Responses for Requests for Additional Information, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specification End States..24 May 2017Clarification of Responses for Requests for Additional Information, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specification End States..
BSEP 17-0029, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion6 April 2017Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range ExpansionPower Uprate
BSEP 17-0026, Response to Request for Additional Information, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423,Revision 1, Technical Specifications End States, NEDC-32988-A.25 March 2017Response to Request for Additional Information, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423,Revision 1, Technical Specifications End States, NEDC-32988-A.Backfit
BSEP 17-0019, Enclosure 2 - Response to Request for Additional Information Regarding License Amendment Request for Reactor Protection System (RPS) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance Requirements (Srs) 3.3.8.2.1 March 2017Enclosure 2 - Response to Request for Additional Information Regarding License Amendment Request for Reactor Protection System (RPS) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance Requirements (Srs) 3.3.8.2.2 anSafe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML17087A2631 March 2017Response to Request for Additional Information Regarding License Amendment Request for Reactor Protection System (RPS) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance...
BSEP 16-0113, High Frequency Supplement to Seismic Hazard Screening Report, Response to Nrg Request for Information Regarding Recommendation 2.1 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident15 December 2016High Frequency Supplement to Seismic Hazard Screening Report, Response to Nrg Request for Information Regarding Recommendation 2.1 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi AccidentSafe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
BSEP 16-0104, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident15 December 2016Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi AccidentSafe Shutdown Earthquake
Probabilistic Risk Assessment
BSEP 16-0112, (Bsep), Unit Nos. 1 and 2 - Individual Plant Examination of External Events (IPEEE) Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding ...15 December 2016(Bsep), Unit Nos. 1 and 2 - Individual Plant Examination of External Events (IPEEE) Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding ...Probabilistic Risk Assessment
Fukushima Dai-Ichi
BSEP 16-0109, Response to Request for Additional Information, Revision to Requested Implementation Schedule, and Status Update - License Amendment Request Regarding Relocation of Specific Surveillance Frequency Requirements to Licensee-17 November 2016Response to Request for Additional Information, Revision to Requested Implementation Schedule, and Status Update - License Amendment Request Regarding Relocation of Specific Surveillance Frequency Requirements to Licensee-Internal Flooding
Surveillance Frequency Control Program
BSEP 16-0101, Response to Request for Supplemental Information for License Amendment Request Regarding Core Flow Operating Range Expansion9 November 2016Response to Request for Supplemental Information for License Amendment Request Regarding Core Flow Operating Range ExpansionSafety Limit Minimum Critical Power Ratio
MELLLA
Power Uprate
Affidavit
ML16330A5059 November 2016Response to Request for Supplemental Information in Support of MELLLA + LAR, Non-Proprietary Information - Class I (Public)Safety Limit Minimum Critical Power Ratio
MELLLA
BSEP 16-0100, Clarification of Responses for Requests for Additional Information License Amendment Request for Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program1 November 2016Clarification of Responses for Requests for Additional Information License Amendment Request for Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled ProgramHigh winds
Fire Barrier
Internal Flooding
Surveillance Frequency Control Program
Large early release frequency
RA-16-0035, Response to Request for Additional Information (RAI) Regarding Application for Emergency Operations Facility (EOF) Consolidation3 October 2016Response to Request for Additional Information (RAI) Regarding Application for Emergency Operations Facility (EOF) Consolidation
BSEP 16-0070, Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program15 August 2016Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled ProgramProbabilistic Risk Assessment
Surveillance Frequency Control Program
BSEP 16-0072, Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program4 August 2016Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled ProgramSurveillance Frequency Control Program