Issue date | Title | Topic | |
---|---|---|---|
ML23360A608 | 27 December 2023 | County Station Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000373/2024010 and 05000374/2024010 | Commercial Grade Dedication |
ML23264A799 | 21 September 2023 | NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 | |
ML23208A318 | 27 July 2023 | Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI | Job Performance Measure |
ML23153A156 | 2 June 2023 | NRR E-mail Capture - RAI LaSalle pressure-temperature Limits Report (PTLR) Amendment Request | Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report |
ML23150A248 | 25 May 2023 | NRR E-mail Capture - RAI Re LaSalle Downcomer Analysis Amendment Request | |
ML23143A027 | 23 May 2023 | Licensed Operator Positive Fitness-For-Duty Test | |
ML23125A146 | 5 May 2023 | NRR E-mail Capture - Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations | Liquid penetrant |
ML23125A160 | 5 May 2023 | NRR E-mail Capture - Correction to Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations | Liquid penetrant |
ML23122A034 | 2 May 2023 | NRR E-mail Capture - Beaver Valley - Request for Additional Information Regarding Unit 1 - 180 Day Steam Generator Tube Inspection Report | |
ML23110A320 | 21 April 2023 | Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection | |
ML22361A079 | 27 December 2022 | Notification of NRC Baseline Inspection and Request for Information (05000374/2023001) | Nondestructive Examination Aging Management Foreign Material Exclusion Scaffolding |
ML22312A591 | 8 November 2022 | NRR E-mail Capture - Beaver Valley Power Station, Units 1&2 - Request for Additional Information LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time | Recently irradiated fuel |
ML22278A097 | 6 October 2022 | Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Fire Protection Program Changes | Fire Barrier Fire Protection Program |
ML22256A011 | 12 September 2022 | NRR E-mail Capture - Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage | |
ML22178A132 | 24 June 2022 | Request for Additional Information for Beaver Valley Unit 2 Steam Generator Inspection Report - Fall 2021 Refueling Outage | |
ML22138A411 | 18 May 2022 | NRR E-mail Capture - Lasalle 1 and 2 - (RAI) License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Changes to TS Sections 4.3.1 and 5.6.5 (EPID-L-2021-LLA-0124) | |
ML22126A039 | 6 May 2022 | NRR E-mail Capture - Lasalle 1 and 2 Draft (RAI) License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to TS Sections 4.3.1 and 5.6.5 | |
ML22097A083 | 7 April 2022 | County Station Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000373/2022403 and 05000374/2022403 | Probabilistic Risk Assessment Cyber Security |
ML22068A182 | 9 March 2022 | NRR E-mail Capture - Beaver Valley Power Station, Units 1 & 2 - Request for Additional Information for License Amendment Request to Revise Technical Specification 3.3.5 | |
ML22062B023 | 3 March 2022 | NRR E-mail Capture - EPID-L-2022-LLR-0028, LaSalle Unit 1, Request for Additional Information (Rai), LaSalle Unit 1, Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs | |
ML22041B536 | 10 February 2022 | NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 | |
ML22013A751 | 13 January 2022 | Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000334/2022010 and 05000412/2022010 | Power-Operated Valves Weak link |
ML22020A064 | 13 January 2022 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles | Nondestructive Examination |
ML21292A048 | 19 October 2021 | Ti 2515/194 Inspection Documentation Request | Operator Manual Action Open Phase Condition Large early release frequency Time Critical Operator Action |
ML21292A178 | 19 October 2021 | Information Request for a NRC Post-Approval Site Inspection for License Renewal 05000373/2022010 | Aging Management |
ML21259A164 | 16 September 2021 | NRR E-mail Capture - Request for Additional Information Regarding the LAR for Core Operating Limits | |
ML21256A190 | 10 September 2021 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application | |
ML21207A007 | 26 July 2021 | NRR E-mail Capture - La Salle Units 1 and 2 - Request for Additional Information (RAI) License Amendment Request to Incorporate Licensing Topical Report NEDE-33885P-A, Revision 1, GNF CRDA Application Methodology(EPID-L-2021-LLA-0016) | |
ML21190A019 | 8 July 2021 | NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T | Water Inventory Control Recently irradiated fuel |
ML21187A297 | 7 July 2021 | Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests, and Experiments) Baseline Inspection | Commercial Grade Dedication |
ML21144A213 | 24 May 2021 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application | |
ML21117A034 | 5 May 2021 | Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 | Boric Acid |
ML21124A132 | 4 May 2021 | Notification of Conduct of a Fire Protection Team Inspection | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Aging Management Time Critical Operator Action Pandemic Fire Protection Program |
ML21119A228 | 29 April 2021 | NRR E-mail Capture - Request for Additional Information (RAI) - LaSalle, EPID-L-2020-LLA-0018, License Amendment Request (LAR) TSTF-505 | |
ML21102A154 | 9 April 2021 | Request for Additional Information (2nd Round) - Steam Generator Tube Sleeve LAR | |
ML21082A494 | 23 March 2021 | Final RAIs for GL 04-02 Closure (Email) | |
ML21077A190 | 18 March 2021 | NRR E-mail Capture - Lasalle Units 1 and 2 - Request for Additional Information (RAI) Request for License Amendment Regarding Ultimate Heat Sink, (EPID-L-2020-LLA-0165) | Ultimate heat sink |
ML21068A350 | 9 March 2021 | Final Request for Additional Information for Reactor Coolant System (RCS) and Pressure and Tempature Limits Report(Ptlr) TS LAR | Pressure and Temperature Limits Report |
ML21068A276 | 9 March 2021 | NRR E-mail Capture - La Salle Units 1 and 2 - Request for Additional Information (RAI) Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair (EPID-L-2020-LLA-0016) | |
ML21067A675 | 8 March 2021 | NRR E-mail Capture - La Salle Units 1 and 2 - Request for Additional Information (RAI) UHS Amendment Request (EPID-L-2020-LLA-0165) | Ultimate heat sink Anticipated operational occurrence |
ML21060B435 | 1 March 2021 | NRR E-mail Capture - Second Round - Request for Additional Information (Rais) EPID-L-2020-LLA-0018, LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2 | Safe Shutdown |
ML21062A065 | 1 March 2021 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting | Incorporated by reference |
ML21053A025 | 20 February 2021 | NRR E-mail Capture - Request for Additional Information (Rais) - LaSalle Request for Exemption from Pre-Access Drug and Alcohol Testing | |
ML21049A257 | 18 February 2021 | Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) | |
ML21048A043 | 16 February 2021 | County Station - Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information - Inspection Report 05000373/2021011 and 05000374/2021011 | Commercial Grade Dedication Squib Power-Operated Valves Weak link |
ML21015A576 | 14 January 2021 | Final RAIs for Steam Generator 180 Day Tube Inspection Report | |
ML21007A373 | 7 January 2021 | NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, | |
ML21004A144 | 30 December 2020 | NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff | |
ML20364A245 | 29 December 2020 | Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000373/2021002; 05000374/2021002 | Ultimate heat sink Temporary Modification Flow Induced Vibration |
ML20346A104 | 11 December 2020 | NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Request for Additional Information Regarding the License Amendment Request to Adopt 10 CFR 50.69 | Probabilistic Risk Assessment |