Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
W3F1-2023-0056, Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 | 19 December 2023 | Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 | |
ML23325A144 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23325A143 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23325A142 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23270B189 | 27 September 2023 | Evacuation Time Estimate Study | Pandemic Coronavirus COVID19 Siren |
1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation | 29 June 2023 | Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation | |
1CAN062302, Enclosure 2: ANO-1 SAR Amendment 31 - Redacted Version | 20 June 2023 | Enclosure 2: ANO-1 SAR Amendment 31 - Redacted Version | |
ML23180A108 | 20 June 2023 | ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report | Cyber Security Aging Management Turbine Missile |
ML23088A217 | 31 December 2022 | Relief Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 - Technical Report, ANP-4023NP, Revision 0, December 2022 | Boric Acid Nondestructive Examination Liquid penetrant |
W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days | 27 June 2022 | SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days | |
2CAN022202, Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods | 24 February 2022 | Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods | VT-2 Large early release frequency Liquid penetrant |
ML22011A298 | 11 January 2022 | ANS Evaluation Report | |
W3F1-2021-0064, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284 | 30 November 2021 | Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284 | |
0CAN102102, Units 1 and 210 CFR 50.71(e) Report Revision 20 of the ANO Fire Hazards Analysis | 6 October 2021 | Units 1 and 210 CFR 50.71(e) Report Revision 20 of the ANO Fire Hazards Analysis | |
CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L | 6 October 2021 | Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L | |
W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt | 1 October 2021 | Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt | Safe Shutdown Tornado Missile Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Operating Basis Earthquake FLEX Tornado Generated Missile Fukushima Dai-Ichi Seismically rugged Tornado Missile Protection Large early release frequency TORMIS Earthquake Generic Issues Program |
ML21272A303 | 30 September 2021 | Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Probabilistic Risk Assessment Tristructural Isotropic |
ML21237A051 | 25 August 2021 | Follow-on Risk Informed Performance Based Implementation Guidance Needed for Advanced Non-Light Water Reactors | Non-Destructive Examination Safe Shutdown Earthquake Enforcement Discretion Probabilistic Risk Assessment Cyber Security Missed surveillance Significance Determination Process Surveillance Frequency Control Program Large early release frequency Time Critical Operator Action Low Safety Significance Issue Resolution Generic Issues Program Fire Protection Program |
ML21081A192 | 30 June 2021 | Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment | Anticipated operational occurrence Nondestructive Examination Exemption Request Tristructural Isotropic |
2CAN062103, Request for Alternative ANO2-PT-003 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping - Fifth Interval | 29 June 2021 | Request for Alternative ANO2-PT-003 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping - Fifth Interval | VT-2 |
0CAN052102, Annual 10 CFR 50.46 Report for Calendar Year 2020 Emergency Core Cooling System Evaluation Changes | 10 May 2021 | Annual 10 CFR 50.46 Report for Calendar Year 2020 Emergency Core Cooling System Evaluation Changes | |
GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 | 19 April 2021 | Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 | |
ML21095A311 | 8 April 2021 | RB-2021-02 Exam Report Rev 1 ML21095A311 | |
W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual | 5 April 2021 | License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual | Internal Flooding Probabilistic Risk Assessment Emergency Lighting Surveillance Frequency Control Program |
ML21272A338 | 1 April 2021 | Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report | Ultimate heat sink Anticipated operational occurrence Internal Flooding Probabilistic Risk Assessment Design basis earthquake Maintenance Rule Program Turbine Missile Fatality |
ML21090A033 | 31 March 2021 | Historical Context and Perspective on Allowable Stresses and Design Parameters in ASME Section III, Division 5, Subsection Hb, Subpart B (ANL/AMD-21/1) | Non-Destructive Examination |
ML21083A136 | 23 March 2021 | Completed Activities | |
ML21083A144 | 22 March 2021 | Strategy 6 | |
ML21083A143 | 22 March 2021 | Strategy 5 | |
ML21083A142 | 22 March 2021 | Strategy 4 | |
ML21083A141 | 22 March 2021 | Strategy 3 | |
ML21083A140 | 22 March 2021 | Strategy 2 | |
ML21083A139 | 22 March 2021 | Strategy 1 | |
ML21083A138 | 22 March 2021 | Rulemaking | |
ML21083A137 | 22 March 2021 | NEIMA Reporting | |
ML21063A237 | 3 March 2021 | RBS 2020 Annual Assessment Letter | Fitness for Duty Exemption Request Coronavirus |
W3F1-2021-0015, Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System | 29 January 2021 | Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System | Cyber Security |
ML21014A267 | 14 January 2021 | Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy | Probabilistic Risk Assessment Exemption Request |
ML21075A275 | 22 December 2020 | FAQ 20-06 GGNS Scram - Final Approved | Tornado Missile Protection Pandemic Coronavirus Power change |
ML21075A267 | 9 October 2020 | FAQ 20-05 River Bend Uswc - Final Approved | |
W3F1-2020-0038, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System | 23 July 2020 | License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System | Safe Shutdown Shutdown Margin Anticipated operational occurrence Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Coatings Cyber Security B.5.b Surveillance Frequency Control Program Process Control Program Fuel cladding Affidavit |
1CAN032001, Supplemental Information Related to License Amendment Request to Revise Loss of Voltage Relay Allowable Values | 19 March 2020 | Supplemental Information Related to License Amendment Request to Revise Loss of Voltage Relay Allowable Values | Overtravel |
0CAN121901, Summary of Lost Specimens Investigation Report | 3 December 2019 | Summary of Lost Specimens Investigation Report | Fitness for Duty |
RBG-47855, Submittal of Owner'S Activity Report Form for Cycle 20 | 8 August 2019 | Submittal of Owner'S Activity Report Form for Cycle 20 | VT-2 Through Wall Leak |
W3F1-2019-0043, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2018 | 1 July 2019 | Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2018 | |
W3F1-2019-0022, Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results | 14 March 2019 | Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results | |
ML18275A234 | 27 December 2018 | NRC Record of Decision for the License Renewal Application for Waterford, Unit 3 | Incorporated by reference License Renewal Environmental Justice |
ML18284A374 | 20 December 2018 | NRC Record of Decision for the License Renewal Application for River Bend Unit 1 | Incorporated by reference License Renewal Environmental Justice |
ML18215A178 | 30 June 2018 | WCAP-18169-NP, Rev 1, Arkansas Nuclear One Unit 2 Heatup and Cooldown Limit Curves for Normal Operation. | Hydrostatic |
RBG-47873, License Renewal Application, Revised Updated Safety Analysis Report Supplement, Appendix a, Section A.4, License Renewal Commitment List, Revised Commitment 5 | 13 June 2018 | License Renewal Application, Revised Updated Safety Analysis Report Supplement, Appendix a, Section A.4, License Renewal Commitment List, Revised Commitment 5 | Aging Management |