Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping4 January 2021Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel PipingNondestructive Examination
ML20303A17523 October 2020Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting
ML19301A50513 August 2019JAF-CALC-NBI-00205 Setpoint Calculation for Vessel Lo-Lo Lvl Primary Containment Isolation Function (02-3LT-57A,B and 02-3STU-258A,B)Safe Shutdown
Reactor Vessel Water Level
Earthquake
ML18019A26912 February 2018Flood Hazard Mitigation Strategies AssessmentUltimate heat sink
Hydrostatic
FLEX
Fukushima Dai-Ichi
Flood Hazard Mitigation Strategies Assessment
JAFP-17-0085, High Frequency Confirmation Report for March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1, Seismic30 August 2017High Frequency Confirmation Report for March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1, SeismicProbabilistic Risk Assessment
Emergency Lighting
Fukushima Dai-Ichi
Earthquake
JAFP-17-0084, Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)29 August 2017Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
JAFP-17-0078, Focused Evaluation Summary Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident27 July 2017Focused Evaluation Summary Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentHydrostatic
Fukushima Dai-Ichi
Flooding Focused Evaluation
JAFP-17-0054, James a FitzPatrick - Submittal of Stress Analysis Summary for the 24-10-130 Weld Overlay25 May 2017James a FitzPatrick - Submittal of Stress Analysis Summary for the 24-10-130 Weld OverlayWeld Overlay
Nondestructive Examination
Dissimilar Metal Weld
ML17110A27420 April 2017Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI Division 1Through-Wall Leak
ML16043A41118 February 2016Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force ReviewSafe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Earthquake
JAFP-15-0129, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask6 November 2015Submittal of 10 CFR 71.95 Report Involving 8-120B Cask
JAFP-15-0036, J.A. Fitzpatrick Flood Hazard Reevaluation Report - Response to NRC Request for Information Per 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fuskushima Dai-12 March 2015J.A. Fitzpatrick Flood Hazard Reevaluation Report - Response to NRC Request for Information Per 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fuskushima Dai-ichiSafe Shutdown
High winds
Hydrostatic
FLEX
Fukushima Dai-Ichi
Earthquake
ML15007A09012 February 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents)FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Containment Hardened Vent
Earthquake
Scaffolding
ML15007A1507 January 2015Seismic Walkdown Report Update - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident.Safe Shutdown
Fire Barrier
Squib
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
Weak link
JAFP-15-0007, Seismic Walkdown Report Update - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid7 January 2015Seismic Walkdown Report Update - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident.Safe Shutdown
Unanalyzed Condition
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Multiple Spurious Operation
Locked High Radiation Area
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
JAFP-14-0143, Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.30 December 2014Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.Safe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Containment Hardened Vent
Earthquake
Power Operated Valves
JAFP-14-0094, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models1 August 201410 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models
ML14176A96124 June 2014Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014Fire Barrier
Coatings
Foreign Material Exclusion
ML14073A1551 April 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML14007A68121 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Frazil ice
Battery sizing
Earthquake
Hardened vent
ML14043A42815 February 2014Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for James A. FitzPatrick Nuclear Power Plant, TAC Nos.: MF1077Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Frazil ice
Battery sizing
Earthquake
Hardened vent
ML13247A03620 August 2013Letter from R. Dale Roberts 10 CFR 71.95 Report on the 8-120B Cask
ML13273A69120 August 2013Redacted - Letter from R. Dale Roberts 10 CFR 71.95 Report on the 8-120B Cask
JAFP-13-0096, James a FitzPatrick Nuclear Power Plant, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models1 August 2013James a FitzPatrick Nuclear Power Plant, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models
JAFP-13-0035, Response to Request for Additional Information on Core for Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan, License Renewal Commitment 2317 April 2013Response to Request for Additional Information on Core for Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan, License Renewal Commitment #23Finite Element Analysis
License Renewal
Earthquake
Loctite
Flow Induced Vibration
Power Uprate
Affidavit
JAFP-12-0134, FitzPatrick - Seismic Walkdown Report, Response to NRC Request for Information Per 10 CFR 50.54 (F) Re the Seismic Aspect of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident27 November 2012FitzPatrick - Seismic Walkdown Report, Response to NRC Request for Information Per 10 CFR 50.54 (F) Re the Seismic Aspect of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentSafe Shutdown
Unanalyzed Condition
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Multiple Spurious Operation
Locked High Radiation Area
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
ML12342A14027 November 2012Seismic Walkdown Report, Response to NRC Request for Information Per 10 CFR 50.54 (F) Re the Seismic Aspect of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentSafe Shutdown
Unanalyzed Condition
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Multiple Spurious Operation
Locked High Radiation Area
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
JAFP-12-0135, Flooding Walkdown Report - Entergys Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident27 November 2012Flooding Walkdown Report - Entergys Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentUnanalyzed Condition
Fukushima Dai-Ichi
JAFP-12-0134, Engineering Report, JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 321 November 2012Engineering Report, JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3Safe Shutdown
Unanalyzed Condition
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Squib
Multiple Spurious Operation
Locked High Radiation Area
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
JAFP-12-0134, Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3, Attachment C, Pages 74 Through 57321 November 2012Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3, Attachment C, Pages 74 Through 573Squib
Scaffolding
ML12342A13921 November 2012Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3, Attachment C, Pages 74 Through 573Squib
Scaffolding
ML12342A13821 November 2012Engineering Report, JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3Safe Shutdown
Unanalyzed Condition
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Squib
Multiple Spurious Operation
Locked High Radiation Area
Finite Element Analysis
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
JAFP-12-0134, Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 2 of 3, Attachment C, Pages 283 Through 57321 November 2012Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 2 of 3, Attachment C, Pages 283 Through 573
ML12342A14221 November 2012Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 2 of 3, Attachment C, Pages 551 Through 573Safe Shutdown
Design basis earthquake
Scaffolding
Weak link
ML13163A26618 May 2012from Bhalchandra Vaidya to Samson Lee: G20120172, 2.206 PetitionContainment Hardened Vent
Backfit
ML13162A62720 February 2012Summary of R1 Containment Vents
ML11270006926 September 2011Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 PlantsShutdown Margin
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Channel-control blade interference
Scram Discharge Volume
Earthquake
ML1125101878 September 2011NRC Investigation Report Nos. 1-2009-041, 1-2010-019, and 1-2010-031High Radiation Area
ML1024601002 September 2010Enclosure 2, RA-ENO-EP1-10-135, Response to NRC Supplemental RAIs 1, 4, 5, and 6 for James a FitzPatrick Cycle 20 SLMCPR SubmittalMinimum Critical Power Ratio
ML1012704395 May 2010Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants
JAFP-09-0091, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models31 July 200910 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models
JAFP-09-0056, Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments for 2007 and 2008 as Required by 10 CFR 50.59 and 10 CFR 72.4811 May 2009Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments for 2007 and 2008 as Required by 10 CFR 50.59 and 10 CFR 72.48
JAFP-08-0131, Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2C4 December 2008Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2CWeld Overlay
Dissimilar Metal Weld
ML0835903394 December 2008Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2CWeld Overlay
Dissimilar Metal Weld
JAFP-08-0131, Enclosure 3, Structural Integrity Associates, Inc. Calculation 0800769.316 Reconciliation of Recirculation Inlet N2 Nozzle-to-Safe End Weld Overlay Repair with Nozzle Stress Report3 December 2008Enclosure 3, Structural Integrity Associates, Inc. Calculation 0800769.316 Reconciliation of Recirculation Inlet N2 Nozzle-to-Safe End Weld Overlay Repair with Nozzle Stress ReportWeld Overlay
Finite Element Analysis
Dissimilar Metal Weld
ML08310066319 November 2008Request for Additional Information Third 10-Year Interval Inservice Inspection Program Plan Relief Request RR-CRV-01Liquid penetrant
JAFP-08-0103, Certificate of Compliance Not Met During Receipt of Low-Level Radioactive Waste Shipment at Barnwell, Sc Disposal Facility2 October 2008Certificate of Compliance Not Met During Receipt of Low-Level Radioactive Waste Shipment at Barnwell, Sc Disposal FacilityRAMQC
ML0810102778 September 2008Renewed Facility Operating License No. DPR-59 / Appendix C - Additional Conditions
ML0821900137 August 2008Monthly Operating Reports Second Quarter 2008Reserve Station Service Transformer
Power change
JAFP-08-0067, BWR Vessels and Internals Project, Lntegrated Surveillance Program (ISP) Data for FitzPatrick (Excerpted from BWRVIP-135, Revision 1)31 July 2008BWR Vessels and Internals Project, Lntegrated Surveillance Program (ISP) Data for FitzPatrick (Excerpted from BWRVIP-135, Revision 1)